Trajectory Design and Early Mission Operations for the Lunar IceCube Mission
The Lunar IceCube (LIC) mission, a Next Space Technologies for Exploration Partnerships (NSTEP) program selection, was launched as a rideshare onboard Artemis-I on November 16th 2022, and deployed into a high energy lunar flyby trajectory. The final destination of the mission was a polar elliptical lunar orbit from which it could conduct spectroscopy observations of the lunar surface; however, a near rectilinear halo orbit (NRHO) was planned to be used as a staging orbit that divided the lunar transfer and low-thrust spiral phases of the mission. This paper presents the process used to design the LIC transfer trajectory from the high-energy deployment state to a 9:2 synodic resonance NRHO. Additional analyses performed, to assess the critical deployment to lunar flyby phase of the trajectory and to generate recovery trajectories following a loss of contact with the spacecraft, are described as well. Lessons learned from working on the LIC mission are presented to inform the design of similar future CubeSat missions.