Engineering PapersSearch

Engineering topics

Kutzer, Ants

Publications and source records attributed to Kutzer, Ants.

Some thoughts on the management of large, complex international space ventures

Management issues relevant to the development and deployment of large international space ventures are discussed with particular attention given to previous experience. Management approaches utilized in the past are labeled as either simple or complex, and signs of efficient management are examined. Simple approaches include those in which experiments and subsystems are developed for integration into spacecraft, and the Apollo-Soyuz Test Project is given as an example of a simple multinational approach. Complex approaches include those for ESA's Spacelab Project and the Space Station Freedom in which functional interfaces cross agency and political boundaries. It is concluded that individual elements of space programs should be managed by individual participating agencies, and overall configuration control is coordinated by level with a program director acting to manage overall objectives and project interfaces.

Lee, T. J.

HELIOS Third Joint Working Group Meeting

During the past six months since the Second Helios Joint Working Group Meeting held 27-30 April 1970 at Goddard Space Flight Center, the TDS Sub-Group supported the Helios Project Office and the other Sub-Groups in the timely disposition of action items and the dissemination of information pertinent to the development of interface documentation. Of particular importance during this time period was the Project's decision to incorporate a single-channel telemetry system design aboard the spacecraft. The TDS Sub-Group participated actively in the process that led to this decision. Still under active study with TDS participation is the pending Project Office decision regarding the incorporation of a ranging capability within the telecommunications design. The TDS Sub-Group assisted the Mission Analysis and Operations Sub-Group in establishment of a study effort concerning the Near-Earth Sequence of Events from launch to launch plus 8 hours. This study, which will provide valuable data for the spacecraft telecommunications design, will include participation by the Experiment, Launch Vehicle, Spacecraft, as well as the TDS and MA&O Sub-Groups. Also during the past 6-month period, the TDS, in conjunction with the Spacecraft Sub-Group, initiated activity to develop the Helios Spacecraft/TDS Compatibility Test Plans and Procedures. Activity concerning the foregoing interface discussions has been and will continue to be based upon the "TDS Estimated Capabilities Document for the Helios Missions" (613-1), and the "DSN/Flight Project Interface Design Handbook" (810-5). These will continue to be considered TDS controlling documents until specific Helios Project/TDS interface documentation is generated and signed off by the respective parties. In addition to the above, the DSN continued the Helios Trainee Program with seven GfW/DFVLR trainees in residence at JPL. Two trainees will complete their year's residency concurrent with the Third Helios Joint Working Group Meeting, while four new trainees are expected to arrive following the Third Helios Joint Working Group Meeting. These and other activities are reported in detail in the paragraphs that follow.

Ousley, Gilbert