Improving the PMU Standard

The Phasor Measurement Unit (PMU) is perhaps the first representational measurement widely dispersed in the electric power system. Its usefulness has been demonstrated on many occasions. It is shown in this paper that the excellent performance of the PMU is a tribute to PMU makers, and not attributable to the standards that are supposed to specify the performance. The IEEE and IEC standards illustrate, by means of a “reference model,” how a PMU can be made. Both standards base the model on two fundamental conceptual errors. Without these errors several improvements in performance could be made. The standards should be revised to remove the restrictive “guidance” that the reference model presently offers, and to correct the text so that the appropriate concepts are presented.

Phasor Measurement, reference model↗

Reactive Power: sorted, perhaps

The measurement of reactive power has been challenging for over a century. By the 1920s, the IEC and the AIEE were seeking new definitions for reactive power, specifically to handle distorted waveforms and unbalanced systems. Solutions had not and have not been found. This paper shows there are two aspects to the problem. First, the conceptual underpinning of reactive power provides a very shaky foundation for the design of an instrument. Second, the kind of instrument needed is one that has been largely unrecognized in the power engineering field. It is an operational measurement. These aspects of the measurement have been taken into account in IEEE Standard 1459, presently undergoing revision by a working group of the IEEE PES Power System Instrumentation and Measure¬ments Committee.

reactive power, measurement theory, operational, D↗

Changes Required in the PMU standards

The Phasor Measurement Unit (PMU) is a representational measuring instrument that gives time-stamped measurements of the power system on the assumption that the measurand can be represented as sinusoidal. However, two standards defining the measured quantities unnecessarily corrupt the results and limit the capabilities of the PMU, and are beginning to tax communications systems. This paper examines the two mistakes in the PMU standards, and proposes a solution.

PMU measurement, phase, phasor, measurement theory↗

Frequency Response and Congestion Management using Multi-Terminal HVDC Overlay

Continental level power system interconnections using a High Voltage direct current (HVDC) transmission lines have been considered to bring economic benefits such as interregional power exchange. This paper describes the modeling process and studies the technical benefits of having multiple HVDC lines, including a grid of HVDC lines (macrogrid) configuration, connecting the North American Eastern and Western electric power interconnections. The models developed provide steady state and stability analysis for multiple HVDC overlay topologies and provide technical benefit analysis in terms of frequency response and congestions management. The paper also provides a comparison of different HVDC topologies performance and their grid support in case of major disturbances

Tbaileh, Ahmad↗

“Frequency” and the PMU standard

The Phasor Measurement Unit (PMU) has revolutionized power system management by providing high-resolution, time-stamped, spatial, and temporal measure¬ments of the state of power systems. However, the standards defining the measured quantities have ambiguities that cause uncertainty, irreproducibility, and loss of interoperability during periods of change where the measurements should have the greatest value. This paper examines PMU frequency measurement to highlight the problems. It develops some suggestions for the scope and the next evolutionary improvements to the documentary standards. The aim is to improve the meaningfulness and trustworthiness of dynamic power system measurements.

Frequency, rate of change of frequency, definition↗

Roadmap for Advanced Power System Measurements

Conditions in the electric power grid are changing rapidly. Changes are driven, in particular, by the increased penetration of renewable resources in the generation mix. Part of the solution to dealing with the changing conditions is the better use of measurement systems, taking advantage of the better understanding of measurements that was heralded by digital technology. Another part of the solution is the communication of samples of the directly observable voltages and currents by means of continuous point-on-wave values. The increased bandwidth capability of such a system allows more complicated measurement models to be built at the point of use. Additional measurements and analyses can then be performed. This Roadmap hinges on these two aspects of measuring: improved measurements supported by high-bandwidth (raw data) communications. Following an introduction to the overall subject, the report explores the impact of what can be thought of as the digital revolution in measurement. In essence, that revolution has served to clarify ideas about measurement and is continuing to lead to improved processes. An extensive survey of the relevant literature was performed . Webinars were held to learn from the wider community of practitioners. Based on this information, a number of gaps were identified whose continued existence would hamper the solution of the challenges now facing measurement and communication in the power grid. The underlying value propositions are interoperability (presently not very satisfactory in many measurements); greater (and less challenging) adoption of distributed energy resources; and improved international competitiveness. Underlying all that, of course, is progress toward a more reliable and resilient power system. The identified gaps were addressed in four major thrusts: technology deployment and demonstration, education, instrumentation testing and standards, and analytical methods. For each of the thrusts, multiple goals are defined to guide the implementation. The thrusts were designed to close gaps and unlock high-value use cases. After discussing the literature review, gap analysis, high-value use cases, and research thrusts in chapters 2-5, the report culminates in chapter 6 with a roadmap that links each aspect together to form a unified plan. Developing a research portfolio aligned with this plan will ensure that advanced measurement systems are in place to support reliable operation of the power system as it modernizes.

24 POWER TRANSMISSION AND DISTRIBUTION↗

Synchronized Phasor Measurement Unit-based Central Controller for Normal and Contingent Operation of a High-Capacity HVDC Macrogrid for the Continental US

This paper presents a Synchronized Phasor Measurement Unit (PMU) based controller to support the coordination and operation of a high-capacity high-voltage direct current (HVDC) macrogrid transmission for the continental US. The proposed controller allows for optimal scheduling of each segment of the multi-terminal HVDC network under normal and contingent conditions, while considering minimum levels of frequency response requirements. The performance of the proposed controller is tested on a 100,222-bus representation of the US Eastern and Western interconnections. Results show that a centralized PMU-based controller improves the frequency nadir of the HVDC macrogrid under contingency conditions by 25.9%. Furthermore, the primary frequency response (PFR) of the HVDC macrogrid is increased by 33.4%. The performance of each interconnection under the largest credible contingency conditions is also discussed.

Mohan, Nihal↗

A Future Standard for Reactive Power Measurement

Reactive power is defined for sinusoidal voltage and current. Several different ways to measure the quantity have been developed, and while they all give the same result for sinusoidal voltages and currents, the results are not the same when the inputs are distorted. Work was done with distorted test signals to explore these—sometimes large— differences, and a report summarizing the findings was published by the US National Institute of Standards and Technology (NIST) in 2011. We show in this paper that the differences are smaller, but not negligible, when the waveforms are less distorted. The differences between the results of the various existing methods are discussed from the viewpoint of measurement theory. The paper argues that it is time to select one method. The relevance to the ongoing revision to IEEE standard 1459 (which defines reactive power for the purposes of measurement) is explored.

reactive power, measurement standard, definitions,↗

Measuring during a fault

Measuring instruments used in power systems will continue to report their results, even when there is a fault in the system. At such a time, the quality of the measurement is decreased, and the uncertainty of the value is increased. The uncertainty should be reported, but it rarely is. While power engineers have seemingly come to trust the results of such measurements without an uncertainty statement, in any case there is a fundamental problem with quantifying the uncertainty. The problem is not limited to power systems, though faults make it more evident. Uncertainty of the kind caused by a faulted power system can be considered definitional uncertainty, and that is normally evaluated statistically. It is not possible to perform statistics unless the measurement can be repeated at least a few times, and that is not an option outside the laboratory. This paper examines the matter from the viewpoint of measurement theory, and suggests a direction for some future work.

measurement, uncertainty, goodness of fit, degrees↗

Hybrid EMT-TS Simulation Strategies to Study High Bandwidth MMC-Based HVdc Systems

Modular multilevel converters (MMCs) are widely used in the design of modern high-voltage direct current (HVdc) transmission system. High-fidelity dynamic models of MMCs-based HVdc system require small simulation time step and can be accurately modeled in electro-magnetic transient (EMT) simulation programs. The EMT program exhibits slow simulation speed and limitation on the size of the model and brings certain challenges to test the high-fidelity HVdc model in system-level simulations. This paper presents the design and implementation of a hybrid simulation framework, which enables the co-simulation of the EMT model of Atlanta-Orlando HVdc line and the transient stability (TS) model of the entire Eastern Interconnection system. This paper also introduces the implementation of two high-fidelity HVdc line models simulated at different time steps and discusses a dedicated method for sizing the buffer areas on both sides of the HVdc line. The simulation results of the two HVdc models with different sizes of buffer areas are presented and compared.

Liu, Yuan↗

Advanced Power Systems Measurements: A Literature Review

In 2020, a literature survey was performed as part of a project aimed at producing guidance for the Department of Energy in the form of a Roadmap. The topic of the Roadmap was measurement. That was viewed as being generally underrepresented in consideration of sensing and measurement or instrumentation and measurement. Sensing is just the beginning of a process, and the instrument is just the container for the process. Measurement, the experimental process, has acquired a considerable body of theory over the last few decades, theory that is not widely taught and disseminated. The results of the survey can be said broadly to reflect that lack of appreciation. Specifically, the review found that there is support for the development of a more “capable” PMU. New algorithms and new documentary standards will be needed. Some of the findings are: (1) Point-on-wave technology adds new capability to the existing suite of measurements, and could allow for improved operation and protection (2) Power quality analysis has historically been concerned with assessment of how non-sinusoidal the delivered voltage shows promise in signature recognition, a departure from the modeling that has historically characterized power system measurements. (3) The PMU is assed as being a remarkable measurement system, but its performance is held back by the lack of understanding of the measurement theory underpinning its operation. (4) The PMU is being considered for application in the distribution system. There is a danger that it will be seen only in the light of the successful PMU implementation in transmission, and the two have different requirements. These various expansions of measurements will no doubt benefit from a better appreciation of the theoretical aspects of measurement. In this, and other, regards, our survey of the literature has identified gaps as well as possibilities.

29 ENERGY PLANNING, POLICY, AND ECONOMY↗

Power Factor revisited

Power factor is a term whose value can be found by dividing the power in a load to the product of the voltage and the current. It has been used as a rule of thumb to estimate the cost of the losses incurred in delivering reactive power. But it has been extremely troublesome. The same load might be penalized by some definitions, and might not by others. That is still the situation today. There have been two efforts at solution. In 1919 a committee of experts was formed to solve the problem of its definition. The effort did not succeed at producing a definition; two alternatives were recommended in the committee’s final report, but both were adopted. In 2010, IEEE issued Standard 1459 to give definitions. In this standard, definitions of power factor appear under no less than seven different headings. The problem demands solution. The matter is of considerable economic importance to power producers, consumers, and instrument makers. This paper examines the history of the topic, and explores reasons for the difficulty of definition in terms of measurement theory. It is shown that power factor is not suited to purpose. In fact, no definition can exist that will define power factor usefully for its intended economic purpose. Two alternatives are proposed.

power factror, definitions, measurement theory, IE↗

75 Years of Drift: The changing meaning of phasor [History]

The origin of what electrical engineers call a phasor diagram is explored, and traced to a treatise by William Thomson (later Lord Kelvin) and Peter Tait. The diagram was mechanical in origin, and gave a geometrical way to visualize and calculate the interactions of sinusoidal motions. Originally, the words radius vector were used in association with the diagram. Later authors used vector. As work on electromagnetic fields expanded, the word phasor was introduced to replace it. That change came about as a result of a deliberate effort (in 1944) to have a clear and unambiguous term of art. Since then, the meaning of the word has changed, and the geometrical interpretation has fallen out of favor. Unfortunately, clarity and unambiguity have suffered as a result. Newer meanings are examined. The measurement of phase angle in the electric power system is described. An Appendix on the work of Steinmetz shows that he did not favor the phasor representation.

Vector, Phasor, Phasor Measurement Unit↗

Radiation Dose Testing on Juno High Voltage Cables

The Juno mission to Jupiter will have a highly elliptical orbit taking the spacecraft through the radiation belts surrounding the planet. During these passes through the radiation belts, the spacecraft will be subject to high doses of radiation from energetic electrons and protons with energies ranging from 10 keV to 1 GeV. While shielding within the spacecraft main body will reduce the total absorbed dose to much of the spacecraft electronics, instruments and cables on the outside of the spacecraft will receive much higher levels of absorbed dose. In order to estimate the amount of degradation to two such cables, testing has been performed on two coaxial cables intended to provide high voltages to three of the instruments on Juno. Both cables were placed in a vacuum of 5x10(exp -6) torr and cooled to -50(deg)C prior to exposure to the radiation sources. Measurements of the coaxial capacitance per unit length and partial discharge noise floor indicate that increasing levels of radiation make measurable but acceptably small changes to the F EP Teflon utilized in the construction of these cables. In addition to the radiation dose testing, observations were made on the internal electrostatic charging characteristics of these cables and multiple discharges were recorded.

partial discharge↗

Radiation Dose Testing on Juno High Voltage Cables

The Juno mission to Jupiter will have a highly elliptical orbit taking the spacecraft through the radiation belts surrounding the planet. During these passes through the radiation belts, the spacecraft will be subject to high doses of radiation from energetic electrons and protons with energies ranging from 10 keV to 1 GeV. While shielding within the spacecraft main body will reduce the total absorbed dose to much of the spacecraft electronics, instruments and cables on the outside of the spacecraft will receive much higher levels of absorbed dose. In order to estimate the amount of degradation to two such cables, testing has been performed on two coaxial cables intended to provide high voltages to three of the instruments on Juno. Both cables were placed in a vacuum of 5x10-6 torr and cooled to -50 C prior to exposure to the radiation sources. Measurements of the coaxial capacitance per unit length and partial discharge noise floor indicate that increasing levels of radiation make measurable but acceptably small changes to the F EP Teflon utilized in the construction of these cables. In addition to the radiation dose testing, observations were made on the internal electrostatic charging characteristics of these cables and multiple discharges were recorded.

Juno↗

Rotationally Vibrating Electric-Field Mill

A proposed instrument for measuring a static electric field would be based partly on a conventional rotating-split-cylinder or rotating-split-sphere electric-field mill. However, the design of the proposed instrument would overcome the difficulty, encountered in conventional rotational field mills, of transferring measurement signals and power via either electrical or fiber-optic rotary couplings that must be aligned and installed in conjunction with rotary bearings. Instead of being made to rotate in one direction at a steady speed as in a conventional rotational field mill, a split-cylinder or split-sphere electrode assembly in the proposed instrument would be set into rotational vibration like that of a metronome. The rotational vibration, synchronized with appropriate rapid electronic switching of electrical connections between electric-current-measuring circuitry and the split-cylinder or split-sphere electrodes, would result in an electrical measurement effect equivalent to that of a conventional rotational field mill. A version of the proposed instrument is described.

Kirkham, Harold↗

High Power, High Voltage Electric Power System for Electric Propulsion

This paper provides an overview of the 30 KW, 600 V MRHE power subsystem. Descriptions of the power subsystem elements, the mode of power transfer, and power and mass estimates are presented. A direct-drive architecture for electric propulsion is considered which reduces mass and complexity. Solar arrays with concentrators are used for increased efficiency. Finally, the challenges due to the environment of a hypothetical lunar mission as well as due to the advanced technologies considered are outlined.