Engineering PapersSearch

Engineering topics

Kinsey, Robert

Publications and source records attributed to Kinsey, Robert.

The Mars Science Orbiter Concept

This paper describes a possible mission concept for the 2013 Mars launch opportunity. The actual NASA Mars Program plans and implementation may differ.

Advanced Mars Studies

Mission Options Scoping Tool for Mars Orbiters: Mass Cost Calculator (MC2)

Prior to developing the details of an advanced mission study, the mission architecture trade space is typically explored to assess the scope of feasible options. This paper describes the main features of an Excel-based tool, called the Mass-Cost-Calculator (MC2 ), which is used to perform rapid, high-level mass and cost options analyses of Mars orbiter missions. MC2 consists of a combination of databases, analytical solutions, and parametric relationships to enable quick evaluation of new mission concepts and comparison of multiple architecture options. The tool's outputs provide program management and planning teams with answers to "what if" queries, as well as an understanding of the driving mission elements, during the pre-project planning phase. These outputs have been validated against the outputs generated by the Advanced Projects Design Team (Team X) at NASA's Jet Propulsion Laboratory (JPL). The architecture of the tool allows for future expansion to other orbiters beyond Mars, and to non-orbiter missions, such as those involving fly-by spacecraft, probes, landers, rovers, or other mission elements.

orbiters

The Mega Mesospheric Parachute

The current understanding and modeling of the upper reaches of the atmosphere is incomplete. Upper atmospheric interactions with the lower atmosphere, effects of ionizing radiation, high altitude cloud phenomena, and the dynamical interaction with the magnetosphere require greater definition. The scientific objective of obtaining a greater understanding of the upper atmosphere can be achieved by designing, implementing, testing, and utilizing a facility that provides long period in-situ measurements of the mesosphere. Current direct sub-sonic measurements of the upper atmosphere are hampered by the approximately one minute sub-sonic observation window of a ballistic sounding rocket regardless of the launch angle. In-situ measurements at greater than transonic speeds impart energy into the molecular atmospheric system and distort the true atmospheric chemistry. A long duration, sub-sonic capability will significantly enhance our ability to observe and measure: (1) mesospheric lightning phenomena (sprites and blue jets) (2) composition, structure and stratification of noctilucent clouds (3) physics of seasonal radar echoes, gravity wave phenomena (4) chemistry of mesospheric gaseous ratio mixing (5) mesospheric interaction of ionizing radiation (6) dynamic electric and magnetic fields This new facility will also provide local field measurements which complement those that can be obtained through external measurements from satellite and ground-based platforms. The 400 foot (approximately 130 meter) diameter lightweight mega-mesospheric parachute system, deployed with a sounding rocket, is proposed herein as a method to increase sub-sonic mesospheric measurement time periods by more than an order of magnitude. The report outlines a multi-year evolving science instrumentation suite in parallel with the development of the mega meso-chute facility. The developmental issues surrounding the meso-chute are chiefly materials selection (thermal and structural) and deployment mechanism physics. Three mission cases were conceived and developed to include cost and schedules estimates. Each scenario has increasing scientific utility with paralleling launch weight, parachute hang-time, deployment altitude, and parachute size: (1) Case #1: $8.4M@24 months, 6kg payload, 20 min., 50km alt., 80 m. dia. (2) Case #2: $10.4M@24 months, 6kg payload, 20 min., 60km alt, 130m. dia. (3) Case #3: $13.6M@36 months, 30kg payload, 30 min., 90km alt., 200m. dia. The initial breakout cost for the parachute system is approximately $2M@24 months. This report identifies that although the challenges of the mega-meso-chute may be difficult, they can be surmounted and valuable results can be achieved.

Kloesel, Kurt J.