Sub-Picometer Dynamic Measurements of a Diffuse Surface

Future space observatory missions are forecasting the need for sensing and controlling wave front error and system alignment stability to picometer scale. Picometer stability performance demands precision knowledge of the mirror and metering structure materials to the same degree. A high-speed electronic speckle pattern interferometer was designed and built to demonstrate measurements of both static and dynamic responses of picometer amplitudes in materials of diffuse surface subjected to very low energy disturbances. This paper describes the details of a test to impart a dynamic disturbance of picometer scale and measure the response of a composite material.The results of the test are also reported and show conclusively that sub-picometer scale effects can be accurately measured in an open test environment outside a vacuum chamber.

Saif, Babak

LISA Telescope Challenges

The LISA Mission proposal was selected by ESA's Science Program Committee (SPC) for the L3 Cosmic Visions launch opportunity, and is currently in a Phase A mission formulation study. An essential component of the instrument is a set of optical telescopes that make precision displacement measurements between pairs of proof masses that are flying drag-free in three separate satellites. We discuss the key requirements on the telescope, the current design, and discuss progress toward solving some of the key challenges for realizing the telescope designs.

Keski-Kuha, Ritva

JWST Optical Telescope Element Center of Curvature Test

The James Webb Space Telescope (JWST) Optical Telescope Element (OTE) and Integrated Science Instrument Module (ISIM) completed element level integration and test programs and were integrated to the next level of assembly called OTE/ISIM (OTIS) at Goddard Space Flight Center (GSFC) in Greenbelt, Maryland in 2016. Before shipping the OTIS to Johnson Space Center (JSC) for optical test at cryogenic temperature a series of vibration and acoustic tests were performed. To help ensure that the OTIS was ready to be shipped to JSC an optical center of curvature (CoC) test was performed to measure changes in the mirror's optical performance to verify that the telescope's primary mirror was not adversely impacted by the environmental testing and help us in understanding potential anomalies identified during the JSC tests. The primary is a 6.5 meter diameter mirror consisting of 18 individual hexagonal segments. Each segment is an off-axis asphere. There are a total of three prescriptions repeated six times each. As part of the CoC test each segment was individually measured using a high-speed interferometer (HSI) designed and built specifically for this test. This interferometer is capable of characterizing both static and dynamic characteristics of the mirrors. The latter capability was used, with the aid of a vibration stinger applying a low-level input force, to measure the dynamic characteristic changes of the PM backplane structure. This paper describes the CoC test setup and both static and dynamic test results.

interferometer

JWST Optical Telescope Element Center of Curvature Test

James Webb Space Telescope (JWST) is a large infrared observing space telescope which will launch in 2020. The observatory is comprised of 4 major subsystems; (1) Optical Telescope Element (OTE), (2) Integrated Science Instrument Module (ISIM), (3) Sunshield, (4) Spacecraft Bus. The OTE and ISIM are integrated together at Goddard Space Flight Center to form the OTIS assembly,

Keski-Kuha, Ritva

JWST Telescope Integration and Test Progress

The James Webb Space Telescope (JWST) is a 6.5m, segmented, IR telescope that will explore the first light of the universe after the big bang. The JWST Optical Telescope Element (Telescope) integration and test program is well underway. The telescope was completed in the spring of 2016 and the cryogenic test equipment has been through two optical test programs leading up to the final flight verification program. The details of the telescope mirror integration will be provided along with the current status of the flight observatory. In addition, the results of the two optical ground support equipment cryo tests will be shown and how these plans fold into the flight verification program.

Matthews, Gary W.

James Webb Space Telescope Optical Telescope Element/Integrated Science Instrument Module (OTIS) Status

The James Webb Space Telescope Optical Telescope Element (OTE) and Integrated Science Instrument Module (ISIM) are integrated together to form the OTIS. Once integrated, the OTIS undergoes primary mirror center of curvature optical tests, electrical and operational tests, acoustics and vibration testing at the Goddard Space Flight Center before being shipped to the Johnson Space Center for cryogenic optical testing of the OTIS. In preparation for the cryogenic optical testing, the JWST project has built a Pathfinder telescope and has completed two Optical Ground System Equipment (OGSE) cryogenic optical tests with the Pathfinder. In this paper, we will summarize optical test results to date and status the final Pathfinder test and the OTIS integration and environmental test preparations

Feinberg, Lee

James Webb Space Telescope Optical Telescope Element Integrated Science Instrument Module (OTIS) Status

The James Webb Space Telescope Optical Telescope Element (OTE) and Integrated ScienceInstrument Module (ISIM)are integrated together to form the OTIS. Once integrated, the OTIS undergoes primary mirrorcenter of curvatureoptical tests, electrical and operational tests, acoustics and vibration testing at the Goddard SpaceFlight Center beforebeing shipped to the Johnson Space Center for cryogenic optical testing of the OTIS. In preparationfor the cryogenicoptical testing, the JWST project has built a Pathfinder telescope and has completed two OpticalGround SystemEquipment (OGSE) cryogenic optical tests with the Pathfinder. In this paper, we will summarize opticaltest results todate and status the final Pathfinder test and the OTIS integration and environmental test preparations

Feinberg, Lee

JWST Pathfinder Telescope Integration

The James Webb Space Telescope (JWST) is a 6.5m, segmented, IR telescope that will explore the first light of the universe after the big bang. In 2014, a major risk reduction effort related to the Alignment, Integration, and Test (AI&T) of the segmented telescope was completed. The Pathfinder telescope includes two Primary Mirror Segment Assemblies (PMSA's) and the Secondary Mirror Assembly (SMA) onto a flight-like composite telescope backplane. This pathfinder allowed the JWST team to assess the alignment process and to better understand the various error sources that need to be accommodated in the flight build. The successful completion of the Pathfinder Telescope provides a final integration roadmap for the flight operations that will start in August 2015.

JWST

JWST Pathfinder Telescope Risk Reduction Cryo Test Program

In 2014, the Optical Ground Support Equipment was integrated into the large cryo vacuum chamber at Johnson Space Center (JSC) and an initial Chamber Commissioning Test was completed. This insured that the support equipment was ready for the three Pathfinder telescope cryo tests. The Pathfinder telescope which consists of two primary mirror segment assemblies and the secondary mirror was delivered to JSC in February 2015 in support of this critical risk reduction test program prior to the flight hardware. This paper will detail the Chamber Commissioning and first optical test of the JWST Pathfinder telescope.

Integration

New Method for Characterizing the State of Optical and Opto-Mechanical Systems

James Webb Space Telescope Optical Telescope Element (OTE) is a three mirror anastigmat consisting of a 6.5 m primary mirror (PM), secondary mirror (SM) and a tertiary mirror. The primary mirror is made out of 18 segments. The telescope and instruments will be assembled at Goddard Space Flight Center (GSFC) to make it the Optical Telescope Element-Integrated Science Instrument Module (OTIS). The OTIS will go through environmental testing at GSFC before being transported to Johnson Space Center for testing at cryogenic temperature. The objective of the primary mirror Center of Curvature test (CoC) is to characterize the PM before and after the environmental testing for workmanship. This paper discusses the CoC test including both a surface figure test and a new method for characterizing the state of the primary mirror using high speed dynamics interferometry.

Optical Testing

James Webb Space Telescope Optical Telescope Element Mirror Development History and Results

In a little under a decade, the James Webb Space Telescope (JWST) program has designed, manufactured, assembled and tested 21 flight beryllium mirrors for the James Webb Space Telescope Optical Telescope Element. This paper will summarize the mirror development history starting with the selection of beryllium as the mirror material and ending with the final test results. It will provide an overview of the technological roadmap and schedules and the key challenges that were overcome. It will also provide a summary or the key tests that were performed and the results of these tests.

Feinber, Lee D.

Use of a Pathfinder Optical Telescope Element for James Webb Space Telescope Risk Mitigation

A Pathfmder of the James Webb Space Telescope (JWST) Optical Telescope Element is being developed to check out critical ground support equipment and to rehearse integration and testing procedures. This paper provides a summary of the baseline Pathfmder configuration and architecture, objectives of this effort, limitations of Pathfinder, status of its development, and future plans. Special attention is paid to risks that will be mitigated by Pathfmder.

Feinberg, Lee D.

JWST OTE Development Status

This slide presentation reviews the status of the optical telescope element (OTE) for the James Webb Space Telescope (JWST). Information about the cryotests that have been performed, and the test of the Primary Mirror Segment Assembly (PMSA) is included. Also views of the progress on the secondary, tertiary Mirror Segment Assembly and the fine steering motor are included. Information is included about the status of other structures. The critical design audit (CDA) of the OTE is scheduled for October of 2009.

Keski-Kuha, Ritva

Optical Modeling of the Alignment and Test of the NASA James Webb Space Telescope

Optical modeling challenges of the ground alignment plan and optical test and verification of the NASA James Webb Space Telescope are discussed. Issues such as back-out of the gravity sag of light-weighted mirrors, as well as the use of a sparse-aperture auto-collimating flat system are discussed. A walk-through of the interferometer based alignment procedure is summarized, and sensitivities from the sparse aperture wavefront test are included as examples.'

Howard, Joseph M.

Narrow-band EUV Multilayer Coating for the MOSES Sounding Rocket

The Multi-order Solar EUV Spectrograph (MOSES) is a slitless spectrograph designed to study solar He II emission at 303.8 Angstroms, to be launched on a sounding rocket payload. One difference between MOSES and other slitless spectrographs is that the images are recorded simultaneously at three spectral orders, m = -1,0, +l. Another is the addition of a narrow-band multilayer coating on both the grating and the fold flat, which will reject out-of-band lines that normally contaminate the image of a slitless instrument. The primary metrics f a the mating were high peak reflectivity and suppression of Fe XV and XVI emission lines at 284 Angstroms and 335 Angstroms, respectively. We chose B4C/Mg2Si for our material combination since it provides better values for all three metrics together than the other leading candidates Si/Ir, Si/B4C or Si/SiC. Measurements of witness flats at NIST indicate the peak reflectivity at 303.6 is 38.5% for a 15 bilayer stack, while the suppression at 284 Angstroms, is 4.5x and at 335 Angstroms is 18.3x for each of two reflections in the instrument. We present the results of coating the MOSES flight gratings and fold flat, including the spectral response of the fold flat and grating as measured at NIST's SURF III and Brookhaven's X24C beamline.

Owens, Scott M.

JWST: A New Kind of Space Telescope

Contents include the following: Why are the mirrors segmented? Why lightweight segmented mirrors? Why cold (cryogenic) mirrors? Why a space telescope? How did NASA go about developing the mirror technology to enable this? Why was beryllium selected for JWST s mirrors? How are the Beryllium mirrors made? What happens to the mirrors once they are complete?

Keski-Kuha, Ritva

Direct Measurement of Large, Diffuse, Optical Structures

Digital Speckle Pattern Interferometry (DSPI) is a well-established method for the measurement of diffuse objects in experimental mechanics. DSPIs are phase shifting interferometers. Three or four bucket temporal phase shifting algorithms are commonly used to provide phase shifting. These algorithms are sensitive to vibrations and can not be used to measure large optical structures far away from the interferometer. In this research a simultaneous phase shifted interferometer, PhaseCam product of 4D Technology Corporation in Tucson Arizona, is modified to be a Simultaneous phase shifted Digital Speckle Pattern Interferometer (SDSPI). Repeatability, dynamic range, and accuracy of the SDSPI are characterized by measuring a 5 cm x 5 cm carbon fiber coupon.

Saif, Babak N.