Cooperation in Transmission Expansion Planning: Enhancing Grid Reliability and Efficiency Under a Changing Climate

Electricity grids are challenged to maintain reliability during more intense and frequent extreme weather events due to climate change. This challenge is exacerbated by multi-sector electrification and power sector decarbonization through increased reliance on variable renewable energy, which necessitates the expansion of transmission infrastructure. However, transmission expansion planning is often complicated by intertwined planning authorities and jurisdictions, and allocation of large capital investment needs. These factors cause authorities to manage transmission investments individually (i.e., only/mostly intraregional planning), which can lead to suboptimal transmission networks. This study investigates the potential benefits of cooperative transmission expansion planning (i.e., both intraregional and interregional planning that optimizes transmission investments across the entire physical system). Using sectoral and economic optimization, and machine learning models, it analyzes the impact of different levels of cooperation among transmission planning regions within U.S. Western Interconnection in 2019 and 2059 via an iterative investment process. Furthermore, it examines the effects of future climate change on transmission cooperation by simulating historical heat waves from 2019 under conditions of 2059. The results indicate that cooperative transmission planning leads to lower wholesale electricity prices, decreased energy outages, and reduced greenhouse gas emissions. However, the advantages of collaboration diminish during widespread heat waves, despite remaining beneficial especially for regions like California Independent System Operator with substantial solar installations. The study underscores the importance of transmission cooperation in reducing costs and enhancing reliability, emphasizing the need for strategic investments in storage to address challenges posed by future extreme weather events with varying spatial scales.

Capacity Expansion Model↗

Cooperative Transmission Expansion Planning Experiment Data and Results

GO WEST is an open-source power grid modeling framework for U.S. Western Interconnection, which allows users to tailor the model depending on their research study and science questions. It covers 28 balancing authorities (BA) and 12 states in U.S. Western Interconnection. GO WEST allows users to select different number of nodes and come up with a simplified network by utilizing 10,000 nodal topology of U.S. Western Interconnection created by Texas A&M University. Users can try and select different number of nodes, mathematical formulations (linear programming vs. mixed-integer linear programming), transmission line limit scaling factors, and hurdle rate scaling factors. GO WEST offers a unit commitment and economic dispatch (UC/ED) module to simulate grid operations on an hourly scale. In this sense, users can calibrate and validate their model versions by comparing model outputs to historical datasets. TEP is an open-source transmission capacity expansion model, built on GO WEST framework. It utilizes linear programming to optimize transmission capacity addition investment on existing lines within GO WEST framework. In this sense, TEP model only increases the thermal capacity of existing transmission lines and does not add new lines to the system, which leaves the topology preserved. TEP minimizes the total cost of the system which comprises the operational cost of satisfying electricity demand (i.e., generation cost), cost of loss of load (i.e., unserved energy), cost of power flow, and cost of new transmission capacity additions (i.e., investment cost). In order to use TEP model, users need to create scenarios with GO WEST framework. In this analysis, outputs from several models are used to create future inputs to GO WEST and TEP models, including GCAM-USA, TELL, CERF and reV. This dataset includes experiment inputs and outputs from three different transmission expansion scenarios (cooperative, intermediate, and individual) for 2019 and 2059. For 2019, a base scenario to illustrate the default (i.e., historical) power grid operations is also included. This study utilizes rcp45hotter_ssp3 scenario from a previous version of GCAM-USA simulations. Sources of the shapefiles in supplementary data are HIFLD Open and U.S. Energy Atlas. Please see the README file for a detailed description of the main and supplementary data.

Capacity Expansion Model↗

Opportunities for wave energy in bulk power system operations

Wave energy resources have high, yet largely untapped potential as candidate generation technology. In this paper, we perform a data-driven analysis to characterize the impact of wave energy integration on bulk-scale power systems and market operations. Through data-driven sensitivity studies centered on an optimization-based production cost modeling formulation, our work characterizes the inflection point beyond which wave integration starts impacting power system operations, considering present day transmission infrastructure. Furthermore, our analysis also considers the joint effects of wave energy integration and system-wide transmission expansion. Finally, potential resilience scenarios such as wildfire-driven transmission contingencies and heat wave events are investigated, whereby the contributions of grid-integrated wave energy in alleviating the effects of the resilience events are analyzed. As our demonstration test bed, we consider a reduced-order network topology for the U.S. Western Interconnection with wave energy generation integrated at carefully selected sites across the coastal areas of Washington, Oregon, and northern California. Our results indicate that over a representative year of operations, wave energy integration systematically reduces locational marginal prices (LMPs) of energy and price volatility, especially during periods of high wave resource availability (winter months for the U.S. west coast). Average, maximum, and minimum of hourly LMPs over a typical year of operation was reduced by 2.95, 51.28, and 1.13 $\$$/MWh respectively (over a baseline scenario with no wave energy integration), when the selected network model had a total of 5000 MW wave power installed capacity during the representative year of study. The effects of wave energy integration can remain localized with existing transmission infrastructure (identified to be most pronounced in the Pacific Northwest region in the example we studied). However, with concurrent transmission expansion, the impacts of wave energy integration are likely to have a higher geographical spread. Our results also indicate that wave energy may be able to assist power system operations during resilience events such as major transmission contingencies and heat wave events, although such benefits might be dependent on factors such as proximity of affected area to wave resources, availability of adequate resource potential and adequate transmission capacity.

16 TIDAL AND WAVE POWER↗

Modeling the U.S. Western Electric Interconnection to Understand the Consequences of Hydrometeorological Extremes and Options for Risk Mitigation

Electricity grid operators around the world face a dual challenge; withstanding increasingly severe weather and the longer term impacts of climate change, while simultaneously decarbonizing. Extreme weather events such as heat waves and droughts are rising in both severity and frequency, which is threatening the reliability of electricity grids through increased demand, generation capacity losses, and equipment failures. Consequently, incorporating hydrometeorological stressors into computational power systems analysis is becoming an even more critical tool in long term planning and short term operations. However, there is a general lack of open-source customizable grid simulation software capable of exhaustively stress testing the grid under hydrometeorological uncertainty, and/or examining potential risk mitigation pathways. A related, persistent challenge for power system modelers is striking an appropriate balance between model fidelity (e.g. spatial scale and time resolution) and computational tractability (wall clock run-time). In this study, we are proposing a solution to this problem with open-source software that allows users to seamlessly customize the scale and track the accuracy of grid operations models. Our approach allows users to search over numerous model parameters (network topology, mathematical formulation, economic hurdle rates, and transmission line scaling) to identify model instantiations that accommodate experimental design. Further, we use this approach to demonstrate the importance of including extreme weather events in model validation and model selection. Focusing on the occurrence of heatwaves and droughts in the U.S. Western Interconnection, we examine role of extreme events in balancing tradeoffs between model fidelity and run-time at the model design stage.

Economics↗

IM3 GO WEST Parameter Search Dataset

GO WEST is an open-source power grid modeling framework for U.S. Western Interconnection, which allows users to tailor the model depending on their research study and science questions. It is developed to address weather and water dynamics, and associated vulnerabilities in this bulk power system. It covers 28 balancing authorities (BA) and 12 states in U.S. Western Interconnection. GO WEST allows users to select different number of nodes and come up with a simplified network by utilizing 10,000 nodal topology of U.S. Western Interconnection created by Texas A&M University. Users can try and select different number of nodes, mathematical formulations (linear programming vs. mixed-integer linear programming), transmission line limit scaling factors, and hurdle rate scaling factors. GO WEST offers a unit commitment and economic dispatch (UC/ED) module to simulate grid operations on an hourly scale. In this sense, users can calibrate and validate their model versions by comparing model outputs to historical datasets. Therefore, GO WEST can help researchers to strike a balance between model fidelity (i.e. accuracy) and computational complexity (i.e. runtime). This dataset includes model inputs and outputs from 600 model versions for each 2019, 2020, and 2021. The folder naming convention is as follows: Exp{Number of Nodes}_{Mathematical Formulation}_{Transmission Line Limit Scaling Factor in MW}_{Hurdle Rate Scaling Factor in %}_{Year}. Linear programming is designated with "simple" label whereas mixed-integer linear programming is designated with "coal" label. For example, "Exp100_simple_1000_50_2019" folder contains inputs and outputs from 2019 model version with 100 nodes, linear programming, +1000 MW transmission line limit scaling factor, and +50% hurdle rate scaling factor. GO WEST GitHub repository hosts all raw datasets, processing scripts, and model scripts. Please refer to the README file for a detailed description of the included files.

Economics↗