Engineering Papers⌕ Search

Engineering topics

Ke, Xinda

Publications and source records attributed to Ke, Xinda.

43 records · Page 3

Hybrid Cascading Outage Analysis of Extreme Events with Optimized Corrective Actions

Power system are vulnerable to extreme contingencies (like an outage of a major generating substation) that can cause significant generation and load loss and can lead to further cascading outages of other transmission facilities and generators in the system. Some cascading outages are seen within minutes following a major contingency, which may not be captured exclusively using the dynamic simulation of the power system. The utilities plan for contingencies either based on dynamic or steady state analysis separately which may not accurately capture the impact of one process on the other. We address this gap in cascading outage analysis by developing Dynamic Contingency Analysis Tool (DCAT) that can analyze hybrid dynamic and steady state behavior of the power system, including protection system models in dynamic simulations, and simulating corrective actions in post-transient steady state conditions. One of the important implemented steady state processes is to mimic operator corrective actions to mitigate aggravated states caused by dynamic cascading. This paper presents an Optimal Power Flow (OPF) based formulation for selecting corrective actions that utility operators can take during major contingency and thus automate the hybrid dynamic-steady state cascading outage process. The improved DCAT framework with OPF based corrective actions is demonstrated on IEEE 300 bus test system.

Cascading outage↗

Literature Survey on Operational Voltage Control and Reactive Power Management on Transmission and Sub-Transmission Networks

Voltage and reactive power system control is generally performed following usual patterns of loads, based on off-line studies for daily and seasonal operations. This practice is currently challenged by the inclusion of distributed renewable generation, such as solar. There has been focus on resolving this problem at the distribution level; however, the transmission and sub-transmission levels have received less attention. This paper provides a literature review of proposed methods and solution approaches to coordinate and optimize voltage control and reactive power management, with an emphasis on applications at transmission and sub-transmission level. The conclusion drawn from the survey is that additional research is needed in the areas of optimizing switch shunt actions and coordinating all available resources to deal with uncertain patterns from increasing distributed renewable generation in the operational time frame. These topics are not deeply explored in the literature.

capacitors↗

A Three-Stage Enhanced Reactive Power and Voltage Optimization Method for High Penetration of Solar

This paper presents a three-stage enhanced volt/var optimization method to stabilize voltage fluctuations in transmission networks by optimizing the usage of reactive power control devices. In contrast with existing volt/var optimization algorithms, the proposed method optimizes the voltage profiles of the system, while keeping the voltage and real power output of the generators as close to the original scheduling values as possible. This allows the method to accommodate realistic power system operation and market scenarios, in which the original generation dispatch schedule will not be affected. The proposed method was tested and validated on a modified IEEE 118-bus system with photovoltaic data.

photovoltaic, Volt/Var Control, indexes, simulatio↗

A Real-Time Greedy-Index Dispatching Policy for using PEVs to Provide Frequency Regulation Service

This article presents a real-time greedy-index dispatching policy (GIDP) for using plug-in electric vehicles (PEVs) to provide frequency regulation services. A new service cost allocation mechanism is proposed to award PEVs based on the amount of service they provided, while considering compensations for delayed-charging and reduction of battery lifetime due to participation of the service. The GIDP transforms the optimal dispatch problem from a high-dimensional space into a one-dimensional space while preserving the solution optimality. When solving the transformed problem in real-time, the global optimality of the GIDP solution can be guaranteed by mathematically proved “indexability”. Because the GIDP index can be calculated upon the PEV’s arrival and used for the entire decision making process till its departure, the computational burden is minimized and the complexity of the aggregator dispatch process is significantly reduced. Finally, simulation results are used to evaluate the proposed GIDP, and to demonstrate the potential profitability from providing frequency regulation service by using PEVs.

29 ENERGY PLANNING, POLICY, AND ECONOMY↗

Quantifying impacts of heat waves on power grid operation

Climate change is projected to cause an increase in the severity and frequency of extreme weather events such as heat waves and droughts. Such changes present planning and operating challenges and risks to many economic sectors. In the electricity sector, statistics of extreme events in the past have been used to help plan for future peak loads, determine associated infrastructure requirements, and evaluate operational risks, but industry-standard planning tools have yet to be coupled with or informed by temperature models to explore the impacts of the "new normal" on planning studies. For example, high ambient temperatures during heat waves reduce the output capacity and efficiency of gas fired combustion turbines just when they are needed most to meet peak demands. This paper describes the development and application of a production cost and unit commitment model coupled to high resolution, hourly temperature data and a temperature dependent load model. The coupled system has the ability to represent the impacts of hourly temperatures on load conditions and available capacity and efficiency of combustion turbines, and therefore capture the potential impacts on system reliability and production cost. Ongoing work expands this capability to address the impacts of water availability and temperature on power grid operation.

Climate change↗

A modified priority list-based MILP method for solving large-scale unit commitment problems

This paper studies the typical pattern of unit commitment (UC) results in terms of generator’s cost and capacity. A method is then proposed to combine a modified priority list technique with mixed integer linear programming (MILP) for UC problem. The proposed method consists of two steps. At the first step, a portion of generators are predetermined to be online or offline within a look-ahead period (e.g., a week), based on the demand curve and generator priority order. For the generators whose on/off status is predetermined, at the second step, the corresponding binary variables are removed from the UC MILP problem over the operational planning horizon (e.g., 24 hours). With a number of binary variables removed, the resulted problem can be solved much faster using the off-the-shelf MILP solvers, based on the branch-and-bound algorithm. In the modified priority list method, scale factors are designed to adjust the tradeoff between solution speed and level of optimality. It is found that the proposed method can significantly speed up the UC problem with minor compromise in optimality by selecting appropriate scale factors.

Ke, Xinda↗

Control and Size Energy Storage for Managing Energy balance of Variable Generation Resources

This paper presents control algorithms and sizing strategies for using energy storage to manage energy balance for variable generation resources. The control objective is to minimize the hourly generation imbalance between the actual and the scheduled generation of the wind farm. Three control algorithms are compared: tracking power imbalance, post-compensation, and pre-compensation. Measurement data from a wind farm located in South-central Washington State are used in the study. The results show that tracking power imbalance yields the best performance by keeping the hourly energy imbalances zero. However, the energy storage system (ESS) will be significantly oversized. Post-compensation reduces power rating of the ESS but the hourly imbalance may not be kept as zero when large and long-lasting energy imbalances occur. A linear regression forecasting algorithm is developed for the pre-compensation algorithm to pre-charge or pre-discharge the ESS based on predicted energy imbalances. The performance comparison shows that the pre-compensation method significantly reduces the size of the ESS while maintaining satisfactory performance.

ENERGY MANAGEMENT↗