Engineering Papers⌕ Search

Engineering topics

Kazimi, R.

Publications and source records attributed to Kazimi, R..

Horizontal Splitter Design For FFA@CEBAF Energy Upgrade: Current Status

Thomas Jefferson National Accelerator Facility (Jefferson Lab) is currently studying the feasibility of an energy upgrade based upon Fixed-Field Alternating Gradient (FFA) permanent magnet technology. The current plan is to replace the highest-energy recirculation arcs with FFA arcs, increasing the total number of beam recirculations, thus the energy. In order to accommodate multiple passes in the FFA arcs, horizontal splitters are being designed to control the beam parameters entering the FFA arcs, as well as the time of flight and R_56. In the current design, six passes will recirculate through the FFA arcs, necessitating the design of six independent beamlines to control the optics and beam dynamics matching into the arcs. These beamlines must fit into the current CEBAF tunnel, while allowing for personnel and equipment access. They must also be flexible enough to accommodate the beam under realistic operational conditions and fluctuations. The constraints on the system are highly restrictive, complicating the design. This document will describe the current state of the design, and indicate the work remaining for a complete conceptual design.

Benesch, Jay↗

RESONANT MATCHING SECTION FOR CEBAF ENERGY UPGRADE

Thomas Jefferson National Accelerator Facility (Jeffer- son Lab) currently studies the feasibility of upgrading its energy to 22 GeV. It considers addition of six more linac passes. The highest energy passes will share two new arcs designed using the Fixed-Field Alternating Gradient (FFA) technology. The FFA arcs are built using permanent combined-function magnets. They will be connected to the linacs through transition sections that will match the optics of all six passes to the linacs. With the high number of con- straints and the limited space available, we are investigating a parametric resonance technique to match the optics quasi- independently at each energy. A resonance is excited at each individual energy to selectively control its optics. The reso- nant dipole and quadrupole kick harmonics are imposed for all energies simultaneously using Panofsky corrector mag- nets placed throughout the FFA arcs. This paper presents the current progress on that transition section design

Deitrick, K.↗

Positron beams at Ce+BAF

Positron beams would provide a new and meaningful probe for the experimental program at the Thomas Jefferson National Accelerator Facility (JLab). The JLab Positron Working Group, formed in 2018 and now with over 250 members from 75 institutions, continues to develop an experimental program with high duty-cycle positron beams including but not limited to future hadronic physics and dark matter experiments. Critical requirements involve generating positron beams with a high degree of spin polarization, sufficient intensity and a continuous-wave (CW) bunch train compatible with acceleration to 12 GeV at the Continuous Electron Beam Accelerator Facility (CEBAF). In this presentation we describe a start-to-end layout for positron beams at 12 GeV CEBAF utilizing the Low Energy Research Facility (LERF) at Jefferson Lab to build two new injectors. A GaAs dc high voltage photo-gun first generates >1 mA of polarized electrons which are then accelerated to 80-150 MeV and directed to a high-power spinning W target for polarized bremsstrahlung and positron pair creation. A second injector then collects, bunches and accelerates the positrons to 123 MeV. The positron beams are transported by a new beam line and injected into the CEBAF acceptance for acceleration to the end stations with energies up to 12 GeV. The layout is optimized to provide Users with positron spin polarization >60% and intensity greater than >100 nA, and with higher intensities when polarization is not required.

Benesch, J.↗

CEBAF 22 GeV FFA energy upgrade

Extending the energy reach of CEBAF by increasing the number of recirculations, while using the existing linacs is explored. This energy upgrade is based on the multi-pass acceleration of electrons in a single non-scaling Fixed Field Alternating Gradient (FFA) beam line, using Halbach-style permanent magnets. Encouraged by the recent successful demonstration of CBETA, a proposal was formulated to nearly double the energy of CEBAF from 12 to 22~GeV by replacing the highest energy arcs with FFA transport. The new FFA arcs would support simultaneous transport of an additional 6 passes spanning roughly a factor of two in energy. One of the challenges of the multi-pass (11) linac optics is to assure uniform focusing over a wide range of energies. Here, we propose a triplet lattice that provides a stable periodic solution covering an energy ratio of 1:33. The current CEBAF injection at 123 MeV, makes optical matching in the first linac impossible due to the extremely high energy ratio (1:175). Replacement of the current injector with a 650 MeV recirculating injector will alleviate this issue. Orbital and optical matching from the FFA arcs to the linacs is implemented as a compact non-adiabatic insert. The design presented here is anticipated to deliver a 22 GeV beam with normalized emittance of 76 mm·mrad and a relative energy spread of 1×10\textsuperscript{-3}. Further recirculation beyond 22 GeV is limited by the large (974 MeV per electron) energy loss due to synchrotron radiation.

Benesch, J.↗

Polarized electron injector for positron production at CEBAF

As a part of the effort to expand the capabilities of CE-BAF 12 GeV (Continuous Electron Beam Accelerator Facility) at Jefferson Lab, the addition of a polarized positron source is considered. This capability would provide acceleration of high duty-cycle polarized posi-trons, with spin >60% polarization, through the same main CEBAF accelerator machine with appropriate mag-net field reversals and linac phasing to the four CEBAF experimental halls. To produce this positron beam, a high average current (3-10 mA) highly polarized electron beam with energy of 100 ? 150 MeV is required at the positron source target. The focus of this paper is the de-sign of that polarized electron beam injector. We will describe the production and delivery of a >3 mA highly polarized electron beam. We will discuss different aspects of the design, the photocathode gun, beam dynamics simulation results, spin manipulation, bunching and accelerating process and final electron beam parameters.

Kazimi, R.↗

Modeling for the phased injector upgrade for 12 GeV CEBAF

The upcoming Jefferson Lab K-Long experiment at Hall D will require unique beam conditions with a much lower bunch repetition rate and atypically high bunch charge. To optimize the Continuous Electron Beam Accelerator Facility (CEBAF) injector for this experiment, we performed Multi-Objective Genetic Optimization (MGO) using General Particle Tracer (GPT) to determine the magnetic elements and RF settings necessary for the K-long bunch charge (0.64 pC) at 200 kV. We also investigated the transmission and beam characteristics of low to high charge per bunch electron beams through the injector for simultaneous operations of all four CEBAF Halls and characterized the transmission as a function of the photocathode laser spot size and pulse length. Our findings provide valuable insights into optimizing the CEBAF injector for the Jefferson Lab K-Long experiment, as well as for other experiments with similar beam conditions

Kazimi, R.↗

Modeling for the phased injector upgrade for 12 GeV CEBAF

As a follow on to the 12 GeV upgrade to the Continuous Electron Beam Accelerator Facility, the front end of the DC photo-gun-based injector has gone through a phased upgrade. The first phase focused on the beamline between the gun and the RF chopper system, and the second phase addresses the beamline after the RF chopper system including replacing the capture section and quarter cryomodule with a new booster module containing a 2-cell and 7-cell cavity string. Throughout the design process, we maintained and developed three models, one for the existing injector and one for each of the upgrade phases. With these models, we evaluated proposed hardware upgrades, evaluated and determined optimized beamline element positions, developed buncher voltage requirements, and settings for optimal injector running. In this paper, we will describe the models and results from these various studies and provide a brief summary of Phase 1 commissioning.

Kazimi, R.↗