Engineering Papers⌕ Search

Engineering topics

Kazakov, Sergey

Publications and source records attributed to Kazakov, Sergey.

33 records · Page 2

Status of PIP-II 650 MHz Prototype Dressed Cavity Qualification

Low-beta and high-beta sections of PIP-II linac will use nine low-beta cryomodules with four cavities each and four high-beta cryomodules with six cavities each. These cavities will be produced and qualified in collaboration between Fermilab and the international partner labs. Prior to their installation into prototype cryomodules, several dressed cavities, which include jacketed cavities, high power couplers, and tuners, will be qualified in STC horizontal test bed at Fermilab. After qualification of bare β = 0.9 cavities at Fermilab, several pre-production β = 0.92 and β = 0.61 cavities have been and are being fabricated and qualified. Procurements have also been started for high power couplers and tuners. In this contribution we present the current status of prototype dressed cavity qualification for PIP-II.

43 PARTICLE ACCELERATORS↗

Superconducting RF Gun with High Current and the Capability to Generate Polarized Electron Beams

High-current low-emittance CW electron beams are indispensable for nuclear and high-energy physics fixed target and collider experiments, cooling high energy hadron beams, generating CW beams of monoenergetic X-rays (in FELs) and gamma-rays (in Compton sources). Polarization of electrons in these beams provides extra value by opening a new set of observables and frequently improving the data quality. We report on the upgrade of the unique and fully functional CW SRF 1.25 MeV SRF gun, built as part of the Coherent electron Cooling (CeC) project, which has demonstrated sustained CW operation with CsK2Sb photocathodes generating electron bunches with record-low transverse emittances and record-high bunch charge exceeding 10 nC. We propose to extend the capabilities of this system to high average current of 100 milliampere in two steps: increasing the current 30-fold at each step with the goal to demonstrate reliable long-term operation of the high-current low-emittance CW SRF guns. We also propose to test polarized GaAs photocathodes in the ultra-high vacuum (UHV) environment of the SRF gun, which has never been successfully demonstrated in RF accelerators.

43 PARTICLE ACCELERATORS↗

Superconducting cavity coupler

A cavity coupler comprising of an outer coupler body, at least one shield formed inside the outer coupler body wherein the relationship between the shield and the outer coupler body form at least one chamber, an antenna configured to provide a radio frequency signal, and a flange for connecting the cavity coupler to a superconducting cavity. In an embodiment, the outer coupler body is formed of stainless steel. In an embodiment, the at least one shield is formed of copper.

36 MATERIALS SCIENCE↗

Latest Progress in Designs and Testings of PIP-II Power Couplers

Proton Improvement Plan – II (PIP-II) project is under go in Fermi National Laboratory. Main part of the project is 800 MeV proton superconducting accelerator which includes 116 superconducting cavities of 5 different types and three 162.5, 325 and 650 MHz frequencies. Key elements of accelerator which determine a reliable operation are main couplers for superconducting cavities. This paper describes the latest progress in design and testing of main couplers for PIP-II projects.

43 PARTICLE ACCELERATORS↗

Characterization of SSR1 Cavities for PIP-II Linac

A cryomodule of 325 MHz Single Spoke Resonator type 1 (SSR1) superconducting RF cavities is being built at Fermilab for the PIP-II project. Twelve SSR1 cavities were manufactured in industry in USA (10 cavities) and India (2 cavities) and delivered to Fermilab. In this paper we present results of characterization of fully integrated jacketed cavities with high power coupler and tuner at the Fermilab Spoke Test Cryostat (STC).

43 PARTICLE ACCELERATORS↗

A Ferroelectric Fast Reactive Tuner for Superconducting Cavities

A prototype FerroElectric Fast Reactive Tuner (FE-FRT) for superconducting cavities has been developed, which allows the frequency to be controlled by application of a potential difference across a ferroelectric residing within the tuner. This technique has now become practically feasible due to the recent development of a new extremely low loss ferroelectric material. In a world first, CERN has tested the prototype FE-FRT with a superconducting cavity, and frequency tuning has been successfully demonstrated. This is a significant first step in the development of an entirely new class of tuner. These will allow electronic control of cavity frequencies, by a device operating at room temperature, within timescales that will allow active compensation of microphonics. For many applications this could eliminate the need to use over-coupled fundamental power couplers, thus significantly reducing RF amplifier power.

43 PARTICLE ACCELERATORS↗

Build and test a novel low heat leak fundamental power coupler

Fermi National Accelerator Laboratory and Euclid Techlabs propose to build and test prototypes of a new RF power coupler. The prototype solves reliability problems associated with present power couplers, which may lead to increased up-time of national laboratory accelerators for scientific users, as well as encourage development of industrial, medical, and security accelerator applications. The goal of the proposed project is to build and test a prototype of a proprietary coupler developed by Fermilab. The prototype will permit evaluation of reliability and low cryogenic heat leak in subsequent testing under a follow-on to this pilot program. The prototype design will be fabricated at Euclid Techlabs and tested at Fermilab using existing 1.3 GHz RF infrastructure.

43 PARTICLE ACCELERATORS↗

Commissioning And First Results From The Fermilab Cryomodule Test Stand

A new test stand dedicated to Superconducting Radiofrequency (SRF) cryomodule testing, CMTS1, has been commissioned and is now in operation at Fermilab. The first device to be cooled down and powered in this facility is the prototype 1.3 GHz cryomodule assembled at Fermilab for LCLS-II. We describe the demonstrated capabilities of CMTS1, report on steps taken during commissioning, provide an overview of first test results, and survey future plans.

43 PARTICLE ACCELERATORS↗

CW Room Temperature Re-buncher for the PIP-II Linac Front End

At Fermilab there is a plan for improvements to the Fermilab accelerator complex aimed at providing a beam power capability of at least 1 MW on target. The essential element of the plan (the Proton Improvement Plan II – PIP-II) is a new 800 MeV superconducting linac. The PIP-II linac includes a room temperature front-end and high energy part based on five types of superconducting cavities used to cover the entire velocity range required for beam acceleration. The room temperature front end is composed of an ion source, low energy beam transport line (LEBT), radio frequency quadrupole (RFQ), and a medium energy beam transport line (MEBT). The paper reports RF design of the re-buncher for MEBT along with thermal analysis of the cavity.

43 PARTICLE ACCELERATORS↗

CW Room Temperature Re-Buncher for the Project X Front End

At Fermilab there is a plan to construct the Project X Injector Experiment (PXIE) facility - a prototype of the front end of the Project X, a multi-MW proton source based on superconducting linac. The construction and successful operations of this facility will validate the concept for the Project X front end, thereby minimizing the primary technical risk element within the Project. The room temperature front end of the linac contains an ion source, an RFQ accelerator and a Medium Energy Beam Transport (MEBT) section comprising a high bandwidth bunch selective chopper. The MEBT length is about 10 m, so three re-bunching CW cavities are used to support the beam longitudinal dynamics. The paper reports a RF design of the re-bunchers along with preliminary beam dynamic and thermal analysis of the cavities.

43 PARTICLE ACCELERATORS↗

Three-cell traveling wave superconducting test structure

Use of a superconducting traveling wave accelerating (STWA) structure with a small phase advance per cell rather than a standing wave structure may provide a significant increase of the accelerating gradient in the ILC linac. For the same surface electric and magnetic fields the STWA achieves an accelerating gradient 1.2 larger than TESLA-like standing wave cavities. The STWA allows also longer acceleration cavities, reducing the number of gaps between them. However, the STWA structure requires a SC feedback waveguide to return the few hundreds of MW of circulating RF power from the structure output to the structure input. A test single-cell cavity with feedback was designed, manufactured and successfully tested demonstrating the possibility of a proper processing to achieve a high accelerating gradient. These results open way to take the next step of the TW SC cavity development: to build and test a travelingwave three-cell cavity with a feedback waveguide. The latest results of the single-cell cavity tests are discussed as well as the design of the test 3-cell TW cavity.

43 PARTICLE ACCELERATORS↗

Observation of an Anomalous Tuning Range of a Doped BST Ferroelectric Material Developed for Accelerator Applications

The BST based ferroelectric-oxide compounds have been found as suitable materials for a fast electricallycontrolled RF switches and phase shifters that are under development for accelerator applications in X, Ka and L - frequency bands. The BST(M) material (BST ferroelectric with Mg-based additives) allows fast switching and tuning in vacuum and in air both; switching time of material samples < 10 ns has been demonstrated [1-2]. One of the problems related to accelerator application of BST ferroelectric is its high dielectric constant. Decreasing the permittivity however is usually strongly correlated with a decrease in the tunability (k(E)=ε(0)/ε(E)) of ferroelectrics. The use of linear dielectric inclusions in BST ceramics could result in significant suppression of the mentioned k(E) dependence, with the best case being that the tunability vs. ε decrease could be unchanged. On the basis of our measurements we report here two unusual phenomena observed [3]: (i) the increase both the dc and the dynamic tunability with a decrease of the dielectric constant; (ii) the dynamic tunability was observed to exceed the static tunability at specific magnitudes of the applied field.

43 PARTICLE ACCELERATORS↗

The Concept Design of the CW Linac of the Project X

The concept design of the 3 GeV superconducting CW linac of the Project X is discussed. The linac structure and break points for different cavity families are described. The results of the RF system optimization are presented as well as the lattice design and beam dynamics analysis.

43 PARTICLE ACCELERATORS↗