Engineering PapersSearch

Engineering topics

Kara Beaton

Publications and source records attributed to Kara Beaton.

Desert Research and Technology Studies (D-RATS) 2022 Test Report

The primary purpose of the 2022 Desert Research and Technology Studies (D-RATS 22) analog mission field test was to provide data and recommendations regarding how pressurized rover (PR) design, cabin configuration, driving modes, timeline constraints, and mission operations can be acceptably implemented to support future Artemis missions that include a PR. The goal of these evaluations was to provide first order feedback and data on design concepts currently being traded as options for future pressurized rover flight prototypes. The Japan Aerospace Exploration Agency (JAXA) may provide a PR for future Artemis missions. One of the primary objectives of D-RATS 2022 was to share with the JAXA PR team the processes and protocols by which NASA has learned to successfully evaluate rover concepts through integrated HITL evaluations over the past 20+ years, so that JAXA could apply any applicable lessons learned to their PR design, development, testing, and evaluation.

analog

Lunar Surface Cargo Offloading Concepts

A sustainable presence on the lunar surface will serve as a vital training ground and technology demonstration test site in preparation for future human missions to Mars. Robotic lunar surface campaigns will focus on the exploration of resources providing information on the availability and extraction of usable resources, such as oxygen and water, and prepare the surface for a sustained human presence. Landers, outfitted with sensor packages, will be used to conduct risk-reduction activities and aid in the development of technologies prior to the crewed lunar missions that drive the need to for a logistics supply chain that requires offloading. A series of landers will be required on other planetary surfaces to build up the capabilities, capitalizing on those resources, required for sustained human presence. In each of those landers will be cargo including ascent vehicles, habitats, supplies, science packages, spare parts, fluids commodities for fuel and life support, and others varying in volume and ranging from mass in hundreds of kilograms to an estimated 6-14 metric tons to support Human Landing Systems and surface logistics requirements. This paper will examine the challenge of offloading examples of these cargo elements from different categories of landers on the lunar surface using a variety of methodologies. Challenges on the lunar surface arise with the conditions present (thermal, lighting, communications, regolith consistency), the desire to minimize mass of all landed systems, the desire to perform much of the activities with limited to minimal human interaction, and the overall configuration of the landers that are responsible for landing the cargo.

Lunar

Lunar Surface Cargo Offloading Concepts

A sustainable presence on the lunar surface will serve as a vital training ground and technology demonstration test site in preparation for future human missions to Mars. Robotic lunar surface campaigns will focus on the exploration of resources providing information on the availability and extraction of usable resources, such as oxygen and water, and prepare the surface for a sustained human presence. Landers, outfitted with sensor packages, will be used to conduct risk-reduction activities and aid in the development of technologies prior to the crewed lunar missions that drive the need to for a logistics supply chain that requires offloading. A series of landers will be required on other planetary surfaces to build up the capabilities, capitalizing on those resources, required for sustained human presence. In each of those landers will be cargo including ascent vehicles, habitats, supplies, science packages, spare parts, fluids commodities for fuel and life support, and others varying in volume and ranging from mass in hundreds of kilograms to an estimated 6-14 metric tons to support Human Landing Systems and surface logistics requirements. This paper will examine the challenge of offloading examples of these cargo elements from different categories of landers on the lunar surface using a variety of methodologies. Challenges on the lunar surface arise with the conditions present (thermal, lighting, communications, regolith consistency), the desire to minimize mass of all landed systems, the desire to perform much of the activities with limited to minimal human interaction, and the overall configuration of the landers that are responsible for landing the cargo.

Lunar

Desert Research and Technology Studies (D-RATS) 2022 Quicklook Report

This report summarizes the Desert Research and Technology Studies (D-RATS) 2022 analog tests. BACKGROUND - Artemis Challenges – NASA’s concept of operations (ConOps) for the Artemis mission architecture brings new challenges for human exploration of the lunar surface, including: (1) Low-angle, natural lighting at lunar poles; and (2) Exploration sites that challenge communication with Earth. - International Partner Involvement – NASA is working with the Japan Aerospace Exploration Agency (JAXA) to scope mission & functional requirements for an Artemis Pressurized Rover (PR), which JAXA may provide. - Charter – HQ Exploration Systems Development Mission Directorate (ESDMD) Moon to Mars Architecture Development Office (M2MADO) Strategy and Architectures (SA) chartered the Human-in-the-Loop (HITL) test team to investigate Artemis architectural questions related to pressurized rover ConOps. - Rationale – to inform the NASA/JAXA pressurized rover study-agreement. PLAN - Objectives – Analog tests conducted in October 2022 by the D-RATS team addressed three high-level objectives: 1. Investigate pressurized rover (PR) ConOps and capabilities for Artemis exploration 2. Integrate with JAXA engineers & astronauts and incorporate JAXA PR design elements into testing. 3. Re-establish analog field-testing skills & capabilities with rovers to investigate Artemis architecture ConOps. - Secondary Objectives – Work with other groups to leverage D-RATS field test for additional objectives. 4. Work with the Public Affairs Office (PAO) to perform D-RATS public outreach activities. 5. Coordinate with the Human Physiology Performance Protection & Operations (H-3PO) team to facilitate in-field evaluation of human health and performance (HHP) objectives. 6. Share D-RATS field-site and assets with Lunar LTE Studies (Lunar LiTES) team, to aid their study of the use of 4G/LTE communication protocols and devices for astronauts and robotic nodes on the lunar surface. - Team – Fully integrated test team comprised of members from 5 NASA centers, JAXA, and the United States Geological Survey (USGS) - Location – Black Point Lava Flow, ~40 miles north of Flagstaff, AZ HIGH-LEVEL OBJECTIVES ACCOMPLISHED - Investigated Pressurized Rover ConOps & Capabilities for Artemis Exploration (Objective 1) - Completed testing with 4 crew pairs, each spending 3 days and 2 nights in the rover conducting Artemis PR dayin-the-life activities (2 JAXA astronauts, 2 JAXA engineers, 1 NASA astronaut, 3 NASA engineers). - Collected detailed objective & subjective data supporting 10 strategic questions related to Artemis PR operations. - Field geologists present in field observed rover operations & EVAs. - Science team in Houston MCC communicated directly with crew. - Demonstrated crew-led and MCC-led PR teleoperation use cases during EVAs. - Integrated with JAXA Engineers & Astronauts and Incorporated JAXA PR Design Elements into Testing (Objective 2) - NASA & JAXA engineers, flight controllers, scientists, roboticists, and astronauts directly participated in and/or observed testing both in field and in MCC-Houston. - Incorporated JAXA PR design elements into both integrated and standalone testing at JSC and in the field. - Re-established Analog Field-Testing Skills & Capabilities with Rovers to Investigate Artemis Architecture ConOps (Objective 3) - Multiple teams successfully worked to establish and manage field-test base camp, monitor and maintain the rover, and plan and execute 2 weeks of consecutive field-testing with little to no breaks between crews. TEST OUTCOMES - Results will inform Artemis architecture ConOps & capabilities related to pressurized rover operations (see sections 2 for more details) - Summary and team detailed reports will be posted on the D-RATS 2022 wiki

Analog