Engineering Papers⌕ Search

Engineering topics

Joseph, Nathan

Publications and source records attributed to Joseph, Nathan.

FRIB Beam Power Ramp-up: Status and Plans

After project completion on scope, on cost, and ahead of schedule, the Facility for Rare Isotope Beams began operations for scientific users in May of 2022. The ramp-up to a beam power of 400 kW is planned over a six-year period; 1 kW was delivered for initial user runs from in 2022, and 5 kW was delivered as of February 2023. Test runs with 10 kW 36Ar and 48Ca beams were conducted in July 2023. Upgrade plans include doubling the primary-beam energy to 400 MeV/nucleon for enhanced discovery potential (¿FRIB 400¿). This talk reports on the strategic plans towards high power operations emphasizing challenges and resolutions in beam-interception devices and targetry systems, radiation protection and controls, and legacy system renovation and integration.

43 PARTICLE ACCELERATORS↗

FRIB Transition to User Operations, Power Ramp Up, and Upgrade Perspectives

After project completion on scope, on cost, and ahead of schedule, the Facility for Rare Isotope Beams began operations for scientific users in May of 2022. During the first 12 months of user operations, the FRIB accelerator complex delivered 5250 beam hours, including 1528 hours to nine science experiments conducted with primary beams of 36Ar, 48Ca, 70Zn, 82Se, 124Xe, and 198Pt at beam energies >200 MeV/u; 2724 hours for beam developments, studies, and tuning; and 998 hours to industrial users and non-scientific programs using the FRIB Single Event Effect (FSEE) beam line. The ramp-up to a beam power of 400 kW is planned over a six-year period; 1 kW was delivered for initial user runs from in 2022, and 5 kW was delivered as of February 2023. Upgrade plans include doubling the primary-beam energy to 400 MeV/nucleon for enhanced discovery potential (¿FRIB 400¿). This talk reports on FRIB status and progress since SRF2021, emphasizing lessons learned during the transition from beam commissioning to machine operations, challenges and resolutions for the power ramp-up, progress with accelerator improvements, and R&D for the energy upgrade.

43 PARTICLE ACCELERATORS↗

Electro-optical measurement of intense electric field on a high energy pulsed power accelerator

We describe a direct electro-optical approach to measuring a strong 118 MV/m narrow pulse width (~ 33 ns) electric field in the magnetically insulated transmission line (MITL) of a pulsed power accelerator. To date, this is the highest direct external electric field measured electro-optically in a pulsed power accelerator, and it is between two to three orders of magnitude higher than values reported in comparable high energy scientific experiments. The MITL electric field is one of the most important operating parameters in an accelerator and is critical to understanding the properties of the radiation output. However, accurately measuring these high fields using conventional pulsed power diagnostics is difficult due to the strength of interfering particles and fields. Our approach uses a free-space laser beam with a dielectric crystal sensor that is highly immune to electromagnetic interference and does not require an external calibration. Here we focus on device theory, operating parameters, laboratory and pulsed power accelerator experiments as well as challenges that were overcome in the measurement environment.

71 CLASSICAL AND QUANTUM MECHANICS, GENERAL PHYSIC↗