Engineering Papers⌕ Search

Engineering topics

Joseph O Ward

Publications and source records attributed to Joseph O Ward.

An Overview of Contamination Control for the James Webb Space Telescope Launch Campaign

The James Webb Space Telescope (JWST) is a large, infrared space telescope operating at Lagrange point 2. JWST is a joint effort between NASA, ESA, and CSA and was launched from the Centre Spatial Guyanais (CSG) on an Ariane 5 rocket in December 2021. The three-month launch campaign utilized enhanced contamination controls to meet JWST’s strict cleanliness requirements. Prior to launch, JWST was permitted to only be exposed to ISO Class 7 cleanrooms, whereas the processing facilities at CSG are ISO Class 8. NASA, ESA, Arianespace, and CNES implemented temporary upgrades to the nominal contamination control operations for the launch campaign unique to JWST, including the use of vetted, portable High Efficiency Particulate Air (HEPA) filter walls, pre-entrance cleanliness acceptance surveys of each facility and the intra-plant transporter, tightened cleanroom protocols, upgraded garmenting and laundering techniques, cleaning of Self-Contained Atmospheric Protection Ensemble (SCAPE) suits, increased maintenance, staffed pre-cleaning stations, adaptation of the house purge network, and a contamination control enclosure atop the Ariane 5 launcher prior to fairing encapsulation. The Ariane 5 fairing interior and Vehicle Equipment Bay membrane also received multiple cleanings, detailed inspections, and verification sampling to achieve necessary cleanliness levels. The fairing itself was specially sealed to protect the inner environment with just a small, door porthole accessible via diving board for final closeout of the purge interface. All of these enhancements together allowed JWST to meet its contamination requirements for launch, ensuring successful post-separation deployments and mission science.

Contamination Control↗

Precious Cargo: Transporting Contamination-Sensitive Instruments & Optics

The James Webb Space Telescope (JWST) is a multi-national program with instruments and hardware supplied by companies all over the world and numerous states in the United States. In order to transport larger assemblies, like the Optical Telescope Element / Integrated Science Instrument Module (OTIS), and ultimately JWST, the Space Telescope Transporter for Air, Road and Sea (STTARS) was designed and constructed. STTARS is a massive mobile cleanroom (longer than 2 semi-trailers) that provides an ISO class 7 payload environment while being transported by road, airborne and marine vehicles. Temperature, humidity, and particle counts are controlled and continuously tracked, with fallout and NVR witness samples placed in strategic locations for confirmation. Instruments or sensitive hardware were purged continuously during transport. STTARS has 5 main components: the upper tent frame, lower tent frame, pallet, strong back and lid. After transporting OTIS to Northrup Grumman (NG), STTARS was modified to increase its height to house the JWST Observatory on its voyage to French Guiana. This new configuration was designated Observatory STTARS (OSTTARS). OSTTARS was too tall to travel by C5 aircraft, so the trip to the launch site was made by ship. Through JWST’s land, air, and sea transports, STTARS and OSTTARS kept JWST hardware exceptionally clean and safe.

James Webb Space Telescope↗

Clean Air Shower Curtain for Protection of Contamination Sensitive Telescopes on the Ariane 5 Launcher

The launch of the James Webb Space Telescope (JWST) was successfully performed by Ariane 5 from French Guiana on December 25th 2021. The unique nature of the JWST mission led to various adaptations of the Ariane 5 launch system to fulfill stringent cleanliness and hygrometry requirements all along the launch preparation. JWST integration and test activities in the Final Assembly Building (BAF) had to be performed in ISO Class 7 equivalent conditions under Volatile Organic Compounds (VOC) protection and monitoring. For this purpose, a dedicated air supply system equipped with Airborne Molecular Contamination (AMC) filters was installed in the umbilical mast. The fairing itself was specially sealed to protect the inner environment, and to, guarantee ISO Class 7, the BAF Composite Hall (BAF-HC) facilities were upgraded with a removable “Air Shower Curtain” (AShC) containment enclosure between the mobile platforms around JWST. The preparation of these Ariane 5 launch system adaptations started several years before the launch campaign with close cooperation and coordination between Arianespace, ArianeGroup, the European Space Agency (ESA) and the National Aeronautics and Space Administration (NASA). This paper describes their specificities and addresses the challenges experienced to achieve the successful mission preparation.

Contamination Control, James Webb Space Telescope,↗

Molecular Accumulation during JWST’s Optical Telescope Cryogenic Thermal Vacuum Testing

Maintaining molecular cleanliness during the JWST’s Optical Telescope/Instrument Module (OTIS) Cryogenic Thermal Vacuum (TV) test campaign was critical to the success of its optical mission on orbit. In the thermal vacuum tests leading up to the final cryogenic test to validate the OTIS flight hardware, NASA Johnson Space Center’s (JSC’s) TV Chamber A was fully characterized for molecular contamination. It was found to contain common volatile condensable materials (VCM), including hydrocarbons, plasticizers, and silicones, all of which absorb in JWST’s infrared wavelength region. Due to the risks involved, cleaning molecular contamination from the OTIS mirrors was not an option and heating the Primary Mirror (PM) segments would have also been a risky and expensive endeavor. As a result, a monitoring process was developed and implemented during four different Pathfinder or risk reduction tests that were scheduled to occur prior to the flight hardware test. The goal was to quantify and assess the risk of molecular contamination depositing on the PM resulting from relatively warm chamber shrouds “leading” colder PM mirrors during warmup, by a margin of 10-50 Kelvin (K). This was accomplished using Cryogenic Quartz Crystal Microbalances (CQCMs), held at temperatures slightly cooler than the segments to signal the onset of contamination events. Per the JWST Contamination Control Plan (CCP)1, the total Primary Mirror molecular allocation requirement was 50 angstroms. In all tests, the results showed an average accumulated molecular contamination of <10 angstroms.

optics↗

Overview of Contamination Control for the James Webb Space Telescope Launch Campaign

The James Webb Space Telescope (JWST) is a large, infrared space telescope operating at Lagrange point 2. JWST is a joint effort between NASA, ESA, and CSA and was launched from the Centre Spatial Guyanais (CSG) on an Ariane 5 rocket in December 2021. The three-month launch campaign utilized enhanced contamination controls to meet JWST’s strict cleanliness requirements. Prior to launch, JWST was permitted to only be exposed to ISO Class 7 cleanrooms, whereas the processing facilities at CSG are ISO Class 8. NASA, ESA, Arianespace, and CNES implemented temporary upgrades to the nominal contamination control operations for the launch campaign unique to JWST, including the use of vetted, portable High Efficiency Particulate Air (HEPA) filter walls, pre-entrance cleanliness acceptance surveys of each facility and the intra-plant transporter, tightened cleanroom protocols, upgraded garmenting and laundering techniques, cleaning of Self-Contained Atmospheric Protection Ensemble (SCAPE) suits, increased maintenance, staffed pre-cleaning stations, adaptation of the house purge network, and a contamination control enclosure atop the Ariane 5 launcher prior to fairing encapsulation. The Ariane 5 fairing interior and Vehicle Equipment Bay membrane also received multiple cleanings, detailed inspections, and verification sampling to achieve necessary cleanliness levels. The fairing itself was specially sealed to protect the inner environment with just a small, doored porthole accessible via diving board for final closeout of the purge interface. All these enhancements together allowed JWST to meet its contamination requirements for launch, ensuring successful post-separation deployments and mission science.

James Webb Space Telescope↗

Obtaining cryogenic molecular transport data for analysis

The James Webb Space Telescope (JWST) has a primary mirror, made of 18 segments, and a secondary mirror (SM) that are used to direct the light of desired targets. While on orbit, the secondary mirror assembly (SMA) was stowed for approximately 10 days and was subject to molecular contamination outgassing from the cavity of the secondary mirror support structure (SMSS) in-board hinge (IBH) which contains cables, motors, resolvers, and coatings. The main concern during this period before SMA deployment is the accumulation of ice due to the lack of a heater on the SMA. The temperature differentials between the IBH surfaces and SMA could cause redistribution of contaminants. To address this concern, single layer insulation (SLI) was used to create adequate venting and path redirection of outgassing from the IBH. Two separate thermal vacuum tests were performed to quantify this contamination: one Z307 ASTM E 1559 materials test of the radiator paint used on the motor of the IBH and a separate test on a primary mirror backplane assembly (PMBA) qualification engineering test unit (ETU) of the IBH. These tests approximately followed the predicted SMA pre-deployment thermal environment. To quantify source rates in case of a leak, the motor and resolver sides were separated and quartz crystal microbalances (QCM) were used to measure the deposition of water. The SLI redesign and implementation and outgassing measurements to understand leak effects from the IBH were essential to mitigate the deposition of contamination on the SMA.

James Webb Space Telescope, contamination, cleanro↗