Operational and Performance Monitoring of East Tennessee Technology Park Ponds - 2024 Results
Performance and operational monitoring are regulatory requirements associated with a non–time-critical removal action for three surface water bodies at the East Tennessee Technology Park (ETTP) in Oak Ridge, Tennessee (Figure 1): the K-1007-P1 Pond, the K-901-A Pond, and the K-720 Slough. This progress report summarizes the monitoring activities and results from FY 2024. The goal of ecological enhancement of the K-1007-P1 and K-901-A Ponds is to reduce risk from polychlorinated biphenyl (PCB) contamination in fish to humans and wildlife. Lowering PCB concentrations in the water column and in the food that fish eat is expected to decrease PCB bioaccumulation in fish. Performance monitoring of the K-1007-P1 Pond focuses on annual PCB trends in water, clams, and fish. PCBs in fish also are sampled annually at the K-720 Slough.