Engineering Papers⌕ Search

Engineering topics

Jones, Joe

Publications and source records attributed to Jones, Joe.

Technical Bases for Consequence Analyses Using MACCS (MELCOR Accident Consequence Code System)

The use of MELCOR Accident Consequence Code System (MACCS) in regulatory applications requires that input parameters used in MACCS models have a defensible and transparent technical basis. The existing technical basis for MACCS parameters was identified and updates were developed based on current data and information. The transparent way these updates are documented provides a technical basis for updating MACCS parameters with consistent application among the MACCS user community.

22 GENERAL STUDIES OF NUCLEAR REACTORS↗

SkyMine Carbon Mineralization Pilot Project

This Topical Report addresses accomplishments achieved during Phase 1 of the SkyMine{reg_sign} Carbon Mineralization Pilot Project. The primary objectives of this project are to design, construct, and operate a system to capture CO{sub 2} from a slipstream of flue gas from a commercial coal-fired cement kiln, convert that CO{sub 2} to products having commercial value (i.e., beneficial use), show the economic viability of the CO{sub 2} capture and conversion process, and thereby advance the technology to a point of readiness for commercial scale demonstration and proliferation. The project will also substantiate market opportunities for the technology by sales of chemicals into existing markets, and identify opportunities to improve technology performance and reduce costs at commercial scale. The primary objectives of Phase 1 of the project were to elaborate proven SkyMine{reg_sign} process chemistry to commercial pilot-scale operation and complete the preliminary design ('Reference Plant Design') for the pilot plant to be built and operated in Phase 2. Additionally, during Phase 1, information necessary to inform a DOE determination regarding NEPA requirements for the project was developed, and a comprehensive carbon lifecycle analysis was completed. These items were included in the formal application for funding under Phase 2. All Phase 1 objectives were successfully met on schedule and within budget.

32 ENERGY CONSERVATION, CONSUMPTION, AND UTILIZATI↗