Engineering Papers⌕ Search

Engineering topics

Johnstone, John

Publications and source records attributed to Johnstone, John.

Dynamic Aperture of the PIP-II Accumulator Ring (PAR)

The Proton Improvement Plan-II (PIP-II) will include a superconducting linear accelerator which will accelerate H- ions to 800MeV, at an intensity never seen before. A proposed PIP-II Accumulator Ring (PAR) can reduce the injection losses to the booster, enhance the ramp up of the Long Baseline Neutrino Facility (LBNF) and support experiments in Dark Sector Physics. When the beam is circulating in PAR at its full intensity, it will then be transferred to the Booster via single turn injection. Strong PAR focusing results in larger phase advances, shorter focal lengths and higher machine tunes, which creates robust beam envelope control. Particles will be able to survive modest excursions from the elliptical phase-space trajectories of linear optics, and any loss of particles would be due to reduced dynamic aperture. The values for tunes and chromaticities are flexible and will continue to evolve as the lattice matures. Since there will be non-linear terms impacting the particles’ trajectories, tracking will include realistic magnetic field errors and installation alignment errors to determine the dynamic aperture as a function of the machine tunes. This will allow us to determine the optimum operating point in phase-space.

72 PHYSICS OF ELEMENTARY PARTICLES AND FIELDS↗

FNAL PIP-II Accumulator Ring

The FNAL accelerator complex is poised to reach MW neutrino beams on target for the exploration of the dark sector physics and rare physics program spaces. Future operations of the complex will include CW linac operations at beam intensities that have not been seen before \cite{PIP2,RCS_LOI}. The ambitious beam program relies on multi-turn H$^{-}$ injection into the FNAL Booster and then extracted into delivery rings or the Booster Neutrino Beam (BNB) 8 GeV HEP program. A new rapid-cycling synchrotron (RCS) will be required to reach the LBNF goal of 2.4 MW because of intense space-charge limitations. There are many accelerator engineering challenges that are already known and many that will be discovered. This proposal calls for an intermediate step that will both facilitate the operation of Booster in the PIP-II era and gain operational experience associated with high power injection rings. This step includes the design, construction and installation of a 0.8 GeV accumulator ring (upgradeable to 1+ GeV) to be located in the PIP-II Booster Transfer Line (BTL). The PIP-II accumulator ring (PAR) may be primarily designed around permanent magnets or use standard iron core magnet technology with an aperture selected to accommodate the desired high intensity protons at 0.8 GeV.

43 PARTICLE ACCELERATORS↗