Engineering PapersSearch

Engineering topics

Johnston, D. W.

Publications and source records attributed to Johnston, D. W..

Viking mission support

The final operations tests prior to Mars orbit insertion for Viking 1 are discussed together with the real-time operations support for the two months preceding this event. Several special operational strategies and procedures designed to optimize the DSN support during the critical planetary phases of the mission are described. The final phases of Network implementation for Viking and the support afforded to the radio science experiments and Mars radar observations are also included.

Mudgway, D. J.

Viking mission support

On April 26, 1976, the network operations control center was declared available for planetary operations in support of the Viking project. This final capability in the network configuration for Viking had been delayed since February with hardware and software problems both in the control center and at the Deep Space stations. The effect of these problems, particularly insofar as they affected production of intermediate data records, the resolution of the problems, and the current status of the network operations control center in the Viking environment, are given in this article. Also discussed are the operational verification tests performed to check out the new capabilities and associated procedures. The Viking project tests supported by the DSN and finally the DSN support of Viking cruise operations, along with some statistics on performance, are included.

Mudgway, D. J.