Engineering Papers⌕ Search

Engineering topics

Johnson, Megan

Publications and source records attributed to Johnson, Megan.

The 2024 National Hydropower Map

A visualization of the geospatial distribution and characteristics of operational hydropower plants in the United States in 2024.

13 HYDRO ENERGY↗

CARA Status and Upcoming Enhancements

CAS 8.4.3 was deployed to operations on 13 June 2017. Discrepancies Between 3D Pc Estimates and advanced Monte Carlo Equinoctial-Sampling Pc Estimates discovered and discussed at 23 May 2017 Useras (Registered Trademark) Forum. The patch created the Reporting Pc, which is the greater value between the calculated 2D and 3D Pc values This changed the Pc reported in the CDMs to the Reporting Pc This changed the Pc reported on the Summary Report to the Reporting Pc This changed the Pc reported on Maneuver Screening Analysis (MSA) Report to the Reporting Pc. Both the 2D and 3D Pc added to the Summary Report details section The patch also updated the 3D Pc algorithm to eliminate velocity covariance from the Pc calculation This will bring 2D and 3D Pc into close alignment for vast majority of events, particularly for the events in which the 2D/3D discrepancy was found.

conjunction assessmen↗

Maintaining Aura's Orbit Requirements Under New Maneuver Operations

The Earth Observing System (EOS) Afternoon Constellation consists of five member missions (GCOM-W1, Aqua, CALIPSO, CloudSat, and Aura), each of which maintain a frozen, sun-synchronous orbit with a 16-day repeating ground track that follows the Worldwide Reference System-2 (WRS-2). Under nominal science operations for Aura, the propulsion system is oriented such that the resultant thrust vector is aligned 13.493 degrees away from the velocity vector along the yaw axis. When performing orbit maintenance maneuvers, the spacecraft performs a yaw slew to align the thrust vector in the appropriate direction. A new Drag Make Up (DMU) maneuver operations scheme has been implemented for Aura alleviating the need for the 13.493 degree yaw slew. The focus of this investigation is to assess the impact that no-slew DMU maneuver operations will have on Auras Mean Local Time (MLT) which drives the required along track separation between Aura and the constellation members, as well as Auras frozen orbit properties, eccentricity and argument of perigee. Seven maneuver strategies were analyzed to determine the best operational approach. A mirror pole strategy, with maneuvers alternating at the North and South poles, was implemented operationally to minimize impact to the MLT. Additional analysis determined that the mirror pole strategy could be further modified to include frozen orbit maneuvers and thus maintain both MLT and the frozen orbit properties under no-slew operations

aura↗