Addressing Human and Organizational Factors in Nuclear Industry Modernization: A Sociotechnically Based Strategic Framework

The modernization of nuclear power plants will require an advanced concept of operations, involving an integrated set of tightly coupled systems in which all stakeholders act in a coordinated manner. For this modernization effort to be enabled, we developed a human and organizational factors approach based on a broad sociotechnical framework. Starting from core human factors principles, we conducted a literature review of the methods and approaches relevant to the modernization problem. These included not only core disciplines such as cognitive systems engineering, systems theoretic accident modeling and processes, human systems integration, resilience engineering, and macroergonomics but also related topics of safety culture and organizational change. From this literature, we developed a conceptual framework centered around the work system with its four interacting components: people, technology, process, and governance. In an effective work system, these four components are jointly optimized according to three systems criteria: efficiency, effectiveness, and safety. System failure may result from excessive emphasis on any one criterion. The actual work of attaining joint optimization in a given work system can be accomplished by utilizing three high-level functions: knowledge elicitation, knowledge representation, and cross-functional integration. Finally, we illustrated the utility of this approach by applying it to practical problems and case studies.

21 SPECIFIC NUCLEAR REACTORS AND ASSOCIATED PLANTS↗

Regulatory Aspects of the Human Factors Engineering Process in Control Room Modernization

This report describes the basic aspects of control room modernization projects in the U.S. nuclear industry and the need for supplementary guidance on the integration of human factors considerations into the licensing and regulatory aspects of digital upgrades. The report pays specific attention to the integration of principles described in NUREG-0711 (Human Factors Engineering Program Review Model) and how supplementary guidance can help to raise general awareness in the industry regarding the complexities of control room modernization projects created by many interdependent regulations, standards and guidelines. The report also describes how human factors engineering principles and methods provided by various resources and international standards can help in navigating through the process of licensing digital upgrades. In particular, the integration of human factors engineering guidance and requirements into the process of licensing digital upgrades can help reduce uncertainty related to development of technical bases for digital upgrades that will avoid the introduction of new failure modes.

99 GENERAL AND MISCELLANEOUS↗

Human Factors Engineering Aspects of Modifications in Control Room Modernization

This report describes the basic aspects of control room modernization projects in the U.S. nuclear industry and the need for supplementary guidance on the integration of human factors considerations into the licensing and regulatory aspects of digital upgrades. The report pays specific attention to the integration of principles described in NUREG-0711 (Human Factors Engineering Program Review Model) and how supplementary guidance can help to raise general awareness in the industry regarding the complexities of control room modernization projects created by many interdependent regulations, standards and guidelines. The report also describes how human factors engineering principles and methods provided by various resources and international standards can help in navigating through the process of licensing digital upgrades. In particular, the integration of human factors engineering guidance and requirements into the process of licensing digital upgrades can help reduce uncertainty related to development of technical bases for digital upgrades that will avoid the introduction of new failure modes.

97 MATHEMATICS AND COMPUTING↗

Full Scale Evaluation of How Task-Based Overview Displays Impact Operator Workload and Situation Awareness When in Emergency Procedure Space

Control room modernization is critical to extending the life of the 99 operating commercial nuclear power plants (NPP) within the United States. However, due to the lack of evidence demonstrating the efficiency and effectiveness of recent candidate technologies, current NPP control rooms operate without the benefit of various newer technologies now available. As nuclear power plants begin to extend their licenses to continue operating for another 20 years, there is increased interest in modernizing the control room and supplementing the existing control boards with advanced technologies. As part of a series of studies investigating the benefits of advanced control room technologies, the researchers conducted an experimental study to observe the effect of Task-Based Overview Displays (TODs) on operator workload and situation awareness (SA) while completing typical operating scenarios. Researchers employed the Situation Awareness Rating Technique (SART) and the NASA Task Load Index (TLX) as construct measures.

46 INSTRUMENTATION RELATED TO NUCLEAR SCIENCE AND ↗

A Research Roadmap for Computation-Based Human Reliability Analysis

The United States (U.S.) Department of Energy (DOE) is sponsoring research through the Light Water Reactor Sustainability (LWRS) program to extend the life of the currently operating fleet of commercial nuclear power plants. The Risk Informed Safety Margin Characterization (RISMC) research pathway within LWRS looks at ways to maintain and improve the safety margins of these plants. The RISMC pathway includes significant developments in the area of thermalhydraulics code modeling and the development of tools to facilitate dynamic probabilistic risk assessment (PRA). PRA is primarily concerned with the risk of hardware systems at the plant; yet, hardware reliability is often secondary in overall risk significance to human errors that can trigger or compound undesirable events at the plant. This report highlights ongoing efforts to develop a computation-based approach to human reliability analysis (HRA). This computation-based approach differs from existing static and dynamic HRA approaches in that it: (i) interfaces with a dynamic computation engine that includes a full scope plant model, and (ii) interfaces with a PRA software toolset. The computation-based HRA approach presented in this report is called the Human Unimodels for Nuclear Technology to Enhance Reliability (HUNTER) and incorporates in a hybrid fashion elements of existing HRA methods to interface with new computational tools developed under the RISMC pathway. The goal of this research effort is to model human performance more accurately than existing approaches, thereby minimizing modeling uncertainty found in current plant risk models.

21 SPECIFIC NUCLEAR REACTORS AND ASSOCIATED PLANTS↗

A Pilot Study Investigating the Effects of Advanced Nuclear Power Plant Control Room Technologies: Methods and Qualitative Results

Control room modernization is an important part of life extension for the existing light water reactor fleet. None of the 99 currently operating commercial nuclear power plants in the U.S. has completed a full-scale control room modernization to date. Nuclear power plant main control rooms for the existing commercial reactor fleet remain significantly analog, with only limited digital modernizations. Upgrades in the U.S. do not achieve the full potential of newer technologies that might otherwise enhance plant and operator performance. The goal of the control room upgrade benefits research is to identify previously overlooked benefits of modernization, identify candidate technologies that may facilitate such benefits, and demonstrate these technologies through human factors research. This report describes a pilot study to test upgrades to the Human Systems Simulation Laboratory at INL.

21 SPECIFIC NUCLEAR REACTORS AND ASSOCIATED PLANTS↗

Benefits of Advanced Control Room Technologies: Phase One Upgrades to the HSSL, Research Plan, and Performance Measures

Control Room modernization is an important part of life extension for the existing light water reactor fleet. None of the 99 currently operating commercial nuclear power plants in the U.S. has completed a full-scale control room modernization to date. A full-scale modernization might, for example, entail replacement of all analog panels with digital workstations. Such modernizations have been undertaken successfully in upgrades in Europe and Asia, but the U.S. has yet to undertake a control room upgrade of this magnitude. Instead, nuclear power plant main control rooms for the existing commercial reactor fleet remain significantly analog, with only limited digital modernizations. Previous research under the U.S. Department of Energy’s Light Water Reactor Sustainability Program has helped establish a systematic process for control room upgrades that support the transition to a hybrid control room. While the guidance developed to date helps streamline the process of modernization and reduce costs and uncertainty associated with introducing digital control technologies into an existing control room, these upgrades do not achieve the full potential of newer technologies that might otherwise enhance plant and operator performance. The aim of the control room benefits research is to identify previously overlooked benefits of modernization, identify candidate technologies that may facilitate such benefits, and demonstrate these technologies through human factors research. This report describes the initial upgrades to the HSSL and outlines the methodology for a pilot test of the HSSL configuration.

22 GENERAL STUDIES OF NUCLEAR REACTORS↗

A Research Framework for Demonstrating Benefits of Advanced Control Room Technologies

Control Room modernization is an important part of life extension for the existing light water reactor fleet. None of the 99 currently operating commercial nuclear power plants in the U.S. has completed a full-scale control room modernization to date. A full-scale modernization might, for example, entail replacement of all analog panels with digital workstations. Such modernizations have been undertaken successfully in upgrades in Europe and Asia, but the U.S. has yet to undertake a control room upgrade of this magnitude. Instead, nuclear power plant main control rooms for the existing commercial reactor fleet remain significantly analog, with only limited digital modernizations. Previous research under the U.S. Department of Energy’s Light Water Reactor Sustainability Program has helped establish a systematic process for control room upgrades that support the transition to a hybrid control. While the guidance developed to date helps streamline the process of modernization and reduce costs and uncertainty associated with introducing digital control technologies into an existing control room, these upgrades do not achieve the full potential of newer technologies that might otherwise enhance plant and operator performance. The aim of the control room benefits research presented here is to identify previously overlooked benefits of modernization, identify candidate technologies that may facilitate such benefits, and demonstrate these technologies through human factors research. This report serves as an outline for planned research on the benefits of greater modernization in the main control rooms of nuclear power plants.

21 SPECIFIC NUCLEAR REACTORS AND ASSOCIATED PLANTS↗

Status Report on the Development of Micro-Scheduling Software for the Advanced Outage Control Center Project

The long-term viability of existing nuclear power plants (NPPs) in the United States (U.S.) is dependent upon a number of factors, including maintaining high capacity factors, maintaining nuclear safety, and reducing operating costs, particularly those associated with refueling outages. Refueling outages typically take 20-30 days, and for existing light water NPPs in the U.S., the reactor cannot be in operation during the outage. Furthermore, given that many NPPs generate between $1-1.5 million/day in revenue when in operation, there is considerable interest in shortening the length of refueling outages. Yet, refueling outages are highly complex operations, involving multiple concurrent and dependent activities that are difficult to coordinate. Finding ways to improve refueling outage performance while maintaining nuclear safety has proven to be difficult. The Advanced Outage Control Center project is a research and development (R&D) demonstration activity under the Light Water Reactor Sustainability (LWRS) Program. LWRS is a R&D program which works with industry R&D programs to establish technical foundations for the licensing and managing of long-term, safe, and economical operation of current NPPs. The Advanced Outage Control Center project has the goal of improving the management of commercial NPP refueling outages. To accomplish this goal, this INL R&D project is developing an advanced outage control center (OCC) that is specifically designed to maximize the usefulness of communication and collaboration technologies for outage coordination and problem resolution activities. This report describes specific recent efforts to develop a capability called outage Micro-Scheduling. Micro-Scheduling is the ability to allocate and schedule outage support task resources on a sub-hour basis. Micro-Scheduling is the real-time fine-tuning of the outage schedule to react to the actual progress of the primary outage activities to ensure that support task resources are optimally deployed with the least amount of delay and unproductive use of resources. The remaining sections of this report describe in more detail the scheduling challenges that occur during outages, how a Micro-Scheduling capability helps address those challenges, and provides a status update on work accomplished to date and the path forward.

99 GENERAL AND MISCELLANEOUS↗

Baseline Human Factors and Ergonomics in Support of Control Room Modernization at Nuclear Power Plants

As part of control room modernization at a nuclear power plant, a utility should carefully follow the four phases prescribed by the U.S. Nuclear Regulatory Commission in NUREG-0711, Human Factors Engineering Program Review Model . These four phases include Planning and Analysis, Design, Verification and Validation, and Implementation and Operation. While NUREG-0711 is a useful guideline, it is written primarily from the perspective of regulatory review, and it therefore does not provide a nuanced account of many of the steps the utility might undertake as part of control room modernization. The guideline is largely summative—meant to catalog final products—rather than formative—meant to guide the overall modernization process. In this report, we highlight two crucial formative subelements of the Planning and Analysis phase specific to control room modernization that are not covered in NUREG-0711. These two subelements are the usability and ergonomics baseline evaluations. A baseline evaluation entails evaluating the system as-built and currently in use. The usability baseline evaluation provides key insights into operator performance using the control system currently in place. The ergonomic baseline evaluation identifies possible deficiencies in the physical configuration of the control system. Both baseline evaluations feed into the design of the replacement system and help ensure that control room modernization represents the successful evolution of the control system.

99 GENERAL AND MISCELLANEOUS↗

Light Water Reactor Sustainability Program Operator Performance Metrics for Control Room Modernization: A Practical Guide for Early Design Evaluation

As control rooms are modernized with new digital systems at nuclear power plants, it is necessary to evaluate the operator performance using these systems as part of a verification and validation process. There are no standard, predefined metrics available for assessing what is satisfactory operator interaction with new systems, especially during the early design stages of a new system. This report identifies the process and metrics for evaluating human system interfaces as part of control room modernization. The report includes background information on design and evaluation, a thorough discussion of human performance measures, and a practical example of how the process and metrics have been used as part of a turbine control system upgrade during the formative stages of design. The process and metrics are geared toward generalizability to other applications and serve as a template for utilities undertaking their own control room modernization activities.

99 GENERAL AND MISCELLANEOUS↗

Development of a Technical Basis and Guidance for Advanced SMR Function Allocation

This report presents the results from three key activities for FY13 that influence the definition of new concepts of operations for advanced Small Modular Reactors (AdvSMR: a) the development of a framework for the analysis of the functional environmental, and structural attributes, b) the effect that new technologies and operational concepts would have on the way functions are allocated to humans or machines or combinations of the two, and c) the relationship between new concepts of operations, new function allocations, and human performance requirements.

21 SPECIFIC NUCLEAR REACTORS AND ASSOCIATED PLANTS↗

Draft Function Allocation Framework and Preliminary Technical Basis for Advanced SMR Concepts of Operations

This report presents preliminary research results from the investigation into the development of new models and guidance for Concepts of Operations in advanced small modular reactor (AdvSMR) designs. AdvSMRs are nuclear power plants (NPPs), but unlike conventional large NPPs that are constructed on site, AdvSMRs systems and components will be fabricated in a factory and then assembled on site. AdvSMRs will also use advanced digital instrumentation and control systems, and make greater use of automation. Some AdvSMR designs also propose to be operated in a multi-unit configuration with a single central control room as a way to be more cost-competitive with existing NPPs. These differences from conventional NPPs not only pose technical and operational challenges, but they will undoubtedly also have regulatory compliance implications, especially with respect to staffing requirements and safety standards.

46 INSTRUMENTATION RELATED TO NUCLEAR SCIENCE AND ↗

PVMapper: Report on the Second Public Opinion Survey

This report has been developed as an integral part of the PVMapper project, funded by the U.S. Department of Energy’s Office of Energy Efficiency and Renewable Energy’s SunShot program. The objective of the SunShot program is to reduce the total costs of solar energy systems. The scope of PVMapper is to develop a geographic information system (GIS) based project planning tool to identify optimal utility-scale solar facility sites. The specific objectives of the project are to 1) develop the software on an open-source platform; 2) integrate the appropriate data sets and GIS layers; 3) include a measure of social risk and public acceptance; 4) enable customization of variable weights; 5) provide a free and accessible platform for software download; and 6) provide a sustainability plan to ensure future relevance of the software. When completed, PVMapper is intended to be used by solar developers, Authorities Having Jurisdiction (AHJs), and other interested parties. This project supports SunShot’s objective by reducing the non-hardware balance of system costs (“soft costs”) for utility-scale solar project development. In order to accomplish the third project objective – including a measure of social risk and public acceptance within PVMapper – the project team has developed a time-series public opinion survey, administered yearly over the course of the three-year project. This report highlights the results and preliminary analyses from the second survey in this series. While the results of this survey are valuable to both PVMapper and future utility-scale solar development, the time-series design is extremely important. The completion of the series enables the extension of the dataset to much richer information. For example, the research team altered this iteration to sharpen the focus on specific topics (those posing potentially higher risks) and target specific locations in the oversample (such as communities near existing facilities). Using similar approaches for each iteration leads to an increasingly greater amount of detail regarding siting risks. The need for this extended dataset to aid in siting utility-scale solar projects is evident, as developers continue to scale back initial plans due to unidentified or incorrectly quantified social risks. It should be noted that this report provides the complete dataset from the survey, encompassing the wide-ranging responses from all of the survey questions. Although the methods used to integrate these data into PVMapper’s siting algorithms is not the purpose of this report, allusions to integration can be found in the discussions surrounding the design of questions and types of data to be used.

14 SOLAR ENERGY↗

Draft Function Allocation Framework and Preliminary Technical Basis for Advanced SMR Concepts of Operations

This report presents preliminary research results from the investigation in to the development of new models and guidance for concepts of operations (ConOps) in advanced small modular reactor (aSMR) designs. In support of this objective, three important research areas were included: operating principles of multi-modular plants, functional allocation models and strategies that would affect the development of new, non-traditional concept of operations, and the requirements for human performance, based upon work domain analysis and current regulatory requirements. As part of the approach for this report, we outline potential functions, including the theoretical and operational foundations for the development of a new functional allocation model and the identification of specific regulatory requirements that will influence the development of future concept of operations. The report also highlights changes in research strategy prompted by confirmation of the importance of applying the work domain analysis methodology to a reference aSMR design. It is described how this methodology will enrich the findings from this phase of the project in the subsequent phases and help in identification of metrics and focused studies for the determination of human performance criteria that can be used to support the design process.

46 INSTRUMENTATION RELATED TO NUCLEAR SCIENCE AND ↗

Human System Simulation in Support of Human Performance Technical Basis at NPPs

This paper focuses on strategies and progress toward establishing the Idaho National Laboratory’s (INL’s) Human Systems Simulator Laboratory at the Center for Advanced Energy Studies (CAES), a consortium of Idaho State Universities. The INL is one of the National Laboratories of the US Department of Energy. One of the first planned applications for the Human Systems Simulator Laboratory is implementation of a dynamic nuclear power plant simulation (NPP) where studies of operator workload, situation awareness, performance and preference will be carried out in simulated control rooms including nuclear power plant control rooms. Simulation offers a means by which to review operational concepts, improve design practices and provide a technical basis for licensing decisions. In preparation for the next generation power plant and current government and industry efforts in support of light water reactor sustainability, human operators will be attached to a suite of physiological measurement instruments and, in combination with traditional Human Factors Measurement techniques, carry out control room tasks in simulated advanced digital and hybrid analog/digital control rooms. The current focus of the Human Systems Simulator Laboratory is building core competence in quantitative and qualitative measurements of situation awareness and workload. Of particular interest is whether introduction of digital systems including automated procedures has the potential to reduce workload and enhance safety while improving situation awareness or whether workload is merely shifted and situation awareness is modified in yet to be determined ways. Data analysis is carried out by engineers and scientists and includes measures of the physical and neurological correlates of human performance. The current approach supports a user-centered design philosophy (see ISO 13407 “Human Centered Design Process for Interactive Systems, 1999) wherein the context for task performance along with the requirements of the end-user are taken into account during the design process and the validity of design is determined through testing of real end users

22 GENERAL STUDIES OF NUCLEAR REACTORS↗