Pulsed Power Supply for Magnet Quench Training [Poster]
Explore the source record for details and available documents.
Engineering topics
Publications and source records attributed to Jensen, C. C..
Explore the source record for details and available documents.
Explore the source record for details and available documents.
Two pulsed power systems have been upgraded for the g-2 experiment at Fermilab. The Pbar Lithium Lens supply previously ran with a half sine pulsed current of 75 kA peak, 400 us duration and a repetition rate of 0.45 pps. For the g-2 experiment, the peak current was reduced to 25 kA, but the repetition rate was increased to an average of 12 pps. Furthermore, the pulses come in a burst of 8 with 10 ms between each of 8 pulses and then a delay until the next burst. The charging rate has gone up by a factor of 20 due to the burst speed. A major challenge for the upgrade was to charge the capacitor bank while keeping the power line loading and charging supply cost to a reasonable level. Furthermore, this paper will discuss how those issues were solved and results from the operational system.
Fermilab Main Injector has been operating at high Beam Power levels since 2008 when multi-batch slip stacking became operational. In order to maintain and increase the beam power levels the localized beam loss due to beam left over in the injection kicker gap during slip stacking needs to be addressed. A set of gap clearing kickers that kick any beam left in the injection gap to the beam abort have been built. The kickers were installed in the summer of 2009 and became operational in November of 2010. The kicker performance and its effect on the beam losses will be described.
Explore the source record for details and available documents.