Engineering PapersSearch

Engineering topics

Jackson, Lorna G.

Publications and source records attributed to Jackson, Lorna G..

Life testing of secondary silver-zinc cells for the orbiting maneuvering vehicle

Over the past 5 years, extensive testing has been performed at the Marshall Space Flight Center (MSFC) on a variety of secondary (rechargeable) silver-zinc (Ag-Zn) cells for the Orbital Maneuvering Vehicle (OMV). The first tests performed were to determine the feasibility of using such a cell in a long-life (18-month), low-Earth-orbit (LEO) application. Results from these tests were promising, so testing continued with a 250-Ah cell that was specifically designed for this type of application. Once again, results from the tests were promising. Following a review of the data from these previous tests, slight modifications to the 250-Ah design were necessary to alleviate problem areas. Currently, MSFC is testing a 350-Ah design that has incorporated these changes and is the baseline design for the OMV. This test began in mid-November, 1989, and will be complete in the spring of 1991, barring any substantial offline time. A report is presented on the preliminary results from the first few months of this test and they are compared to results obtained in previous tests done at MFSC.

Brewer, Jeffrey C.

Hubble Space Telescope six-battery nickel-cadmium mission simulation test

A simulation test of the six-battery nickel-cadmium mission to determine battery life and electrical power system (EPS) performance characteristics for the Hubble Space Telescope (HST) program, is described. The basic HST power system requirements are to provide power generation, energy storage, and EPS control and distribution for 2.5 years with the nickel-cadmium (NiCd) batteries at an end of life solar array of 2 years. Mission simulation life testing begain in April of 1986, and the batteries have completed their 2.5 year mission requirement. Conditions as close as practical to the actual predicted mission profiles were used. These included solar array degradation, load variations, beta angle changes, temperature changes (with excursions to 10 C), battery reconditioning, safemode simulations, and off-normal roll activities. Discounting system cycling interruptions caused by hardware, software, human error, and periodic updates and revisions, the HST EPS breadboard hardware operated continuously for 30 months and demonstrated the power system's ability to meet the HST requirement.

Jackson, Lorna G.

Hubble Space Telescope electrical power system simulation breadboard

The components and operation of the Hubble Space Telescope (HST) electrical power system (EPS) breadboard are described. The HST EPS breadboard consists of: (1) the power distribution breadboard, (2) the batteries, (3) the solar array simulators, (4) the load banks, (5) the charge current control hardware, and (6) a control computer; the functions of each of these elements are discussed. The HST EPS has been used to simulate changes in charge level, charge control schemes, and beta angle, failed cells, batteries, solar panel assemblies (SPAs), beginning of life SPAs, and end of life SPAs, and temperature differences. The test data reveal that the HST EPS is capable of operating over a wide range of conditions.

Bush, John R., Jr.