Imken, Travis

Publications and source records attributed to Imken, Travis.

At least 19 records

Preparations for the Launch, Cruise, and Orbital Operations Phases of the Psyche Mission

“Psyche: Journey to a Metal World” was selected in 2017 as the 14th mission in NASA’s Discovery program. The mission uses an electric propulsion (EP) system to rendezvous with and orbit the large metal asteroid (16) Psyche. Spacecraft development is a hybrid approach with deep-space avionics provided by the Jet Propulsion Laboratory (JPL) and a solar electric propulsion chassis based on Maxar’s 1300-series GEO communications satellites. The payload suite is comprised of a magnetometer, multispectral imager, and gamma ray & neutron spectrometer science instruments and the Deep Space Optical Communications advanced technology demonstration.The spacecraft is currently in the final integration and test phase to support a planned launch period open in August 2022. With under a year until liftoff, final pre-liftoff preparations are underway for the mission’s major in-flight Phases. The Launch Phase is the mission’s only critical event as the vehicle autonomously deploys the solar arrays and delivers the spacecraft to a safe state. Following a planned 70-day Initial Checkout Phase, the spacecraft thrusts with the EP system through the majority of a 3.5-year Cruise Phase, which includes a Mars gravity assist, to rendezvous with (16) Psyche. The Approach Phase uses optical navigation while continuing to thrust with the EP engines to deliver the spacecraft into orbit. Orbital Operations are baselined for 20 months as the spacecraft steps through four progressively lower orbital altitudes to study the largest M-type asteroid in the solar system.

Hart, William

Psyche Project Implementation During the COVID Pandemic

In January 2017, “Psyche: Journey to a Metal World” was selected for implementation as part of NASA’s Discovery program. The Psyche mission will utilize electric propulsion with SPT-140 Hall thrusters to rendezvous and orbit the metal-rich asteroid (16) Psyche, in the main asteroid belt between Mars and Jupiter. The Psyche spacecraft requires no chemical propulsion and, when launched in 2022, will be the first mission to use Hall thrusters beyond lunar orbit. The Psyche spacecraft is a hybrid development with Jet Propulsion Laboratory (JPL)-provided deep-space avionics and communications equipment mounted on a high-heritage MAXAR (formerly Space Systems Loral) Solar-Electric Propulsion (SEP) Chassis, based on their 1300 series of GEO communications satellites. The spacecraft is equipped to support a suite of science instruments, as well as a demonstration of the Deep Space Optical Communications (DSOC) technology. The spacecraft has sufficient onboard resources, autonomy, redundancy, and operability to complete a 3.5-year cruise to 16 Psyche, followed by a 20-month campaign of science investigations while orbiting the asteroid.The mission’s early concept design and progress through Preliminary Design Review (PDR) has been described in previous work. The paper will cover the recent mission progress from the Critical Design Review (CDR) through the start of Spacecraft Environmental Testing, which took place during the COVID pandemic.The authors will highlight the successful remote collaboration between the major partners: ASU, JPL, MAXAR, and the Payload teams that led to the initiation of the Assembly, Test, Launch, Operations Phase (ATLO) in early March 2021. Emphasis will be placed on the effects that the COVID-19 pandemic had on the work environment over the last 16+ months, including challenges to delivery of flight hardware and test equipment. In addition to the COVID-19 challenges, other significant anomalies discovered during design and test will be described along with any impacts to the overall science capability of the mission.

Lord, Peter

Missed Thrust Requirements for Psyche Mission

The Psyche Mission, part of NASA’s Discovery Mission Program, will explore the metal asteroid (16) Psyche which orbits the sun at ~3 AU. The spacecraft uses solar electric propulsion (SEP) as its primary propulsion system during the ~3.5 year trajectory to (16) Psyche and 21 month orbital operations period around the asteroid. As the first NASA mission to use Hall thrusters for deep space exploration, unique challenges have been identified and resolved in how we plan to accommodate unplanned coast (missed thrust time) during the trajectory and orbital operations and still meet the mission objectives. This paper describes the projects missed thrust requirements in detail, along with the accompanying rationale and analysis plan for the Psyche mission.

Snyder, John Steven

Preparation and Execution of the InSight Instrument Deployment Phase

The NASA InSight lander arrived at Mars on November 26, 2018 on a unique science mission to study the interior of the red planet. InSight’s instrument suite is investigating the geophysical characteristics of Mars, providing a glimpse into the formation and evolution of the planet and other similar Earth-like terrestrial bodies. Upon landing, the mission entered the Instrument Deployment Phase (IDP) to survey, deploy, and install the SEIS, WTS, and HP3 elements onto the Martian surface.

Imken, Travis

Insight Mission: early operations

This paper will describe the InSight mission and science objectives with a focus on the activities since the May 5, 2018 Launch including the InSight Mission Design, Navigation, and Cruise Phase Instrument check-out and the plans for the November Entry, Decent and Landing and Instrument Deployment Phases.

Imken, Travis

Modeling Spacecraft Safe Mode Events

Spacecraft enter a ‘safe mode’ to protect the vehicle when a potentially harmful anomaly occurs. This minimally functioning state isolates faults, establishes contact with Earth, and orients the vehicle into a power positive attitude until operators intervene. Though ‘safings’ are inherently unpredictable, mission teams build in time margin during operations to determine root causes and restore functionality. Planning and managing this margin is both critical and enabling on mission architectures dependent on near-continuous operability – such as a low-thrust electric propulsion mission. To better quantify the occurrences and severity of safe mode anomalies, the Jet Propulsion Laboratory (JPL) has assembled a database of safings from past and active missions. Currently nearly 240 records are captured from 21 beyond-Earth missions, stemming from a collaboration between teams at JPL, Ames Research Center, Goddard Space Flight Center, and the Johns Hopkins University Applied Physics Laboratory. This paper discusses the event database, explores a statistical approach in modeling the occurrences and severity of safing events, presents a simulation technique, and details recommendations and future work to benefit future concepts.

Nicholas, Austin

A Monte Carlo Approach to Measuring Trajectory Performance Subject to Missed Thrust

A spacecraft using solar electric propulsion (SEP) to reach its destination must operate its thrusters for very long periods of time compared to one using chemical propulsion. Some spacecraft may be required to thrust almost the entire duration of the transfer to reach their target. A side-effect of this characteristic of SEP missions is that a spacecraft could be subject to an anomaly or fault that forces it to stop thrusting when it should be, causing it to drift away from its nominal trajectory. A diagram of this situation is shownin Figure 1. Because these shut-down events (commonly referred to as safe mode or safing events), are not uncommon and can be caused by uncontrollable external factors (such as a cosmic ray striking an electronic component), the spacecraft and trajectory should be designed such that the spacecraft can continue on to its destination in a reasonable time and propellant expenditure once operations resume.

Laipert, Frank E.

RainCube, a Ka-band Precipitation Radar in a 6U CubeSat

RainCube (Radar in a CubeSat) is a 6U CubeSat mission between the Jet Propulsion Laboratory (JPL) and Tyvak Nano-Satellite Systems (Tyvak). The objective of the mission is to develop, launch, and operate a 35.75 GHz nadirpointing precipitation profiling radar payload to validate a new architecture for Ka-band radars and an ultra-compact deployable Ka-band antenna design in the space environment. RainCube will also demonstrate the feasibility of a radar payload on a CubeSat platform. The radar payload is the evolution of two previous JPL research and development technologies – the miniaturized Ka-band atmospheric radar (miniKaAR) and the 0.5m diameter Ka-band parabolic deployable antenna (KaPDA). JPL has contracted Tyvak to develop the spacecraft bus, integrate the payload, and operate the spacecraft. RainCube is currently in integration and test with an expected ready-for-delivery in September 2017.

Williams, Austin