Engineering Papers⌕ Search

Engineering topics

Hyde, Jeffrey Paul

Publications and source records attributed to Hyde, Jeffrey Paul.

Robotic Staffing Augmentation

The Robotic Augmentation & Novel Applications team at Los Alamos National Laboratory is working to produce autonomous systems to augment staffing for tasks that are tedious, dangerous, or require high precision. This is intended to reduce risks to staff, programs and facilities while also freeing up personnel resources to better support laboratory missions, particularly pit manufacturing. The primary focus of this effort is to utilize cutting edge automation to augment long duration radiation surveys, allowing RCTs to work on critical production activities.

42 ENGINEERING↗

FY23 Drone RFID (Final Report)

The Drone RFID project successfully completed proof-of-concept testing to demonstrate the potential of a drone-based inventory system for high value remote materials at Los Alamos National Laboratory. Multiple drone platforms were procured, flight authorizations were received, and the vehicles were flown demonstrating what was initially perceived as the most difficult part of the project, successfully flying drones at the lab. Three commercial RFID inventory systems were also purchased, and ground testing performed to determine their suitability. Ultimately, one system was chosen for flight testing and successfully demonstrated the drone's ability to execute inventory with great potential for a relatively low-cost implementation.

42 ENGINEERING↗

Spot Robot Staffing Augmentation in Process Modeling and Analysis (E-2) [Slides]

In September 2021 E-2 obtained its first Spot robot from Boston Dynamics to evaluate their suitability for work in and around laboratory facilities. Spot is a highly mobile quadruped robot capable of up to 90 minutes of operation. They can be outfitted with payloads up to 30 pounds and support Boston Dynamics-developed equipment, third party payloads, or custom-developed payloads. The platform showed immediate promise resulting in the procurement of a total of four units by the end of FY22 (Trinity, Gadget, Crossroads, and Sandstone).

42 ENGINEERING↗