Concrete Thermal Energy Storage Enabling Flexible Operation without Coal Plant Cycling

The work described in this report is responsive to the Office of Fossil Energy program “Energy Storage for Fossil Power Generation.” The pilot plant built as a result of this project demonstrated the feasibility and performance of a concrete thermal energy storage (CTES) system integrated with a supercritical coal power plant. The 10 MWh electrical (>25 MWh thermal) CTES unit, developed by Storworks Power, was designed to enable flexible operation of coal plants without cycling damage. The project's key technical achievements showcase a significant advancement in energy storage technology. A modular CTES system using 42 “Bolderblocs” units was successfully designed and constructed at Alabama Power’s Plant Gaston Unit 5, with each block containing embedded stainless-steel coils in specialized, cost-effective high-temperature concrete. The system interfaced seamlessly with the plant's 3500 psig (241 barg), 1000°F (538°C) supercritical steam, demonstrating operational flexibility. Over 86 full cycles, the CTES exhibited rapid charging and discharging capabilities, effectively mimicking steam turbine feed conditions and handling varying load profiles and storage durations. Performance validation confirmed the system's ability to consistently meet design target steam conditions of 75 bar-a and ~400°C for nominal baseline discharge. The concrete material withstood repeated thermal cycling without degradation, validating earlier lab-scale tests. Integration of balance of plant components, including a condensate management system with storage tank and air-cooled condenser, minimized plant interfaces and water consumption. A robust control scheme ensured safe, automated operation across various scenarios. Key learnings from the project were invaluable: 1. Initial concrete drying and commissioning procedures were refined for future deployments, enhancing efficiency in subsequent installations. 2. System flexibility exceeded expectations, with rapid response to changing conditions. 3. Design improvements were identified including optimized insulation and piping that will enhance overall system efficiency in future deployments 4. Full cycle thermal roundtrip efficiencies exceeded 88%. While the roundtrip electrical efficiency was somewhat limited by known challenges using input steam, such constraints may be mitigated by swapping steam for hot air as thermal input. 5. A summary of key performance parameters for the pilot test and predicted performance of a full scale commercial system with specified improvements determined from the pilot are shown in Section 8. The project faced challenges, including COVID-19 delays and host plant availability constraints. However, these were overcome through adaptive planning and execution. The successful management of these obstacles demonstrated the resilience and adaptability of the project team and the robustness of the CTES technology. This successful pilot demonstrates the potential for CTES to enhance coal plant flexibility, supporting grid stability as renewable penetration increases. The validated design and operational data provide a solid foundation for scaling up to utility-scale implementations, potentially transforming how thermal plants operate in evolving energy landscapes. The system's ability to rapidly respond to changing grid conditions while maintaining high efficiency makes it a promising solution for balancing intermittent renewable energy sources. Furthermore, the project highlighted the potential for even greater efficiencies in future iterations. The use of air as an input medium could potentially eliminate the limitations observed with steam input, opening new possibilities for energy storage applications beyond coal plant integration. In conclusion, this pilot project not only achieved its primary goals but also uncovered additional benefits and potential applications of the CTES technology. It represents a significant step forward in addressing the challenges of grid stability and flexibility in an increasingly renewable-driven energy landscape.

01 COAL, LIGNITE, AND PEAT↗

Liquid Salt Combined-Cycle Pilot Plant Design

The work described in this report is responsive to the Office of Fossil Energy program ‘Energy Storage for Fossil Power Generation.’ This Phase I report has been prepared by Pintail Power LLC, with support from Nexant ECA, Electric Power Research Institute (EPRI) and Southern Company Services as a deliverable for the U.S. Department of Energy for NETL Award DE-FE-00320016. The Liquid Salt Combined Cycle™ (LSCC™) technology provides large-scale energy storage integrated with Fossil Electric Generating Units (FEGUs) to meet critical needs in the energy transition by providing: • the lowest cost large-scale storage for time-shifting of renewable energy, • superior fuel efficiency to reduce GHGs from dispatchable resources, • flexible capacity and ramping to balance variability of wind and solar resources, • essential grid stability services to assure reliability of a low-carbon grid. The LSCC approach: • employs equipment that has already been proven in utility service, • uses safe, non-toxic, non-degrading, perpetual-life storage medium, • leverages and repurposes existing FEGU assets, • expands the value stack of energy storage to reduce market, financing, and commodity risks. Pintail Power has developed the LSCC technology to meet the need for reliable, efficient, and cost-effective integration of Variable Renewable Energy (VRE) into a low-carbon electric grid by coupling proven thermal energy storage with proven gas turbines, steam turbines, and heat transfer equipment. This novel approach is intended to address the key issues facing the grid and operators of renewable and fossil generating units including: • Overgeneration and curtailment of renewables, • Need for fast ramping dispatchable resources, • Improved efficiency and flexibility of fossil units, • Additional peaking capacity to support electrification of transportation and heating, • Provision of reliability services to support high penetration of VRE, especially synchronous inertia and fast frequency response. A Technology Readiness assessment by EPRI confirmed that LSCC technology consists of commercially proven hardware used in industrial and utility applications. Although the novel LSCC approach has not yet been demonstrated as a complete system, interfaces between major components have been conservatively specified. A Phase III pilot is planned to demonstrate equipment integration and operation. The patented innovation is removal of the evaporator section from the exhaust heat recovery system, with the evaporation performed by stored energy in a separate steam generator. This arrangement couples renewable and fossil power generation via long-duration energy storage to deliver cost, performance, and operational synergies, including superior charging and discharging flexibility, reduced fuel consumption and lower CO 2 emissions compared to conventional Combined Cycle Power Plants, and low-cost, large-scale energy storage. The LSCC technology is composed of proven equipment integrated with gas turbine exhaust heat in a novel system. During charging, electric heaters raise the salt temperature as it flows from the Cold Salt Tank to the Hot Salt Tank. During discharging, hot salt produces steam from feedwater that is heated with gas turbine exhaust, which also superheats steam to drive a steam turbine. LSCC technology can be added to any combustion-turbine to integrate renewable energy, provide needed grid services, and increase the value of fossil electric generating units based on the technology’s following attributes: • Long-duration storage enables time-shifting of VRE to avoid curtailment and impairment of renewable assets. • Long storage duration combined with fast-charging capability increases arbitrage opportunities by storing more energy when the price is low and discharging more hours when the price is high. • Long storage duration allows resource adequacy to be supplied across multiple days to increase reliability and reduce risk. • The stored energy reduces fuel heat rate and GHG emissions, and increases merit, so the LSCC dispatches earlier and longer to increase the plant’s capacity factor and asset value. • The stored energy enables pre-heating and startup of the steam cycle, without operating the gas turbine, to enable fast startup and ramping when dispatched for discharge. • The steam turbine can operate without the gas turbine so it can provide valuable synchronous inertia during charging without consuming fuel. • Fast frequency response and regulation services can be provided during charging using solid-state heater and pump controls to vary the charge power input in response to grid signals. • The LSCC system can be configured for resilience including black start, islanded/micro-grid operation, and even self-recharging of storage using either gas turbine power or gas turbine exhaust heat. The commercialization plan is to add LSCC technology to existing simple cycle gas turbine power plants with the 50MW GE LM6000 aero-derivative gas turbine as the reference design basis. A Techno-economic assessment of the reference design evaluated the benefits (Levelized Avoided Cost of Energy) and costs (Levelized Cost of Energy). The plant definition included all major systems and budgetary vendor quotes. Pintail Power and NexantECA developed the overall cost estimate for the LSCC plant up to the total plant cost level, following the DOE-NETL cost estimate guidelines at AACE Class 3 (-20%/+30%). This includes the equipment cost, bulk material, direct and indirect labor costs to arrive at the bare erected cost. Engineering costs are factored from the BEC and added to it to arrive at the EPC cost. Process and project contingencies were then factored from the EPC cost and rolled-up to yield the total plant cost of $\$$184 million for 1746 MWh of discharge electricity. • At $\$$105/kWh, the reference plant costs less than any of the Energy Storage Systems evaluated by PNNL in 2020 for the Energy Storage Grand Challenge. Operations and Maintenance cost estimates were scaled from combined cycle practice, assuming that the LSCC unit was co-located with and sharing some labor expense with other units, to arrive at $\$$2.2 million per year. Plant economics were evaluated using prices from the ERCOT Day-Ahead Market for calendar year 2019 (excluding the market disruptions from the COVID pandemic and the February 2020 deep freeze event). Assuming economic dispatch in the ERCOT Day-Ahead market, the reference plant capacity factor would have discharged for 2777 hours at 91.9 MW, a 31.66% capacity factor, with a marginal cost of $\$$25.59/MWh, and a LACE of $\$$82.41/MWh. Fixed charges were calculated according to EIA guidelines to arrive at an LCOE of $\$$83.48. The benefit-to-cost ratio of 0.99 suggests that the reference plant would have been cost-effective and competitive in the market. EPRI interviewed selected utilities to gauge the need for, applicability of and interest in the LSCC system. Several utilities are currently managing increased load growth along with the inclusion of increasing levels of renewable generation, putting pressure on conventional generation by requiring increased turndown requirements and ultimately lower capacity factors. All of the utilities interviewed have CO 2 reduction targets in the 2030-2050 timeframe that will severely limit the participation of fossil generation and require better utilization of carbon free generation. While there is limited opportunity for storage in the current markets, the utilities interviewed stated that there will be a substantial need for long duration energy storage in the future given the expected trends. Utilizing an energy storage system will generally be preferred over new gas capacity in some cases, with the capabilities of the LSCC system being a potential option for retrofit to existing simple cycle gas turbine units, allowing them to deliver greater participation in the market with lower carbon intensity. A technology gap assessment and technology maturation plan identified a pilot-scale demonstration as the final step before commercialization. Key gaps to be addressed during the Phase II FEED (Front-End Engineering Design) are component selection and design, commissioning procedures, and operational procedures and the control system for LSCC charging and discharging. The project team has been expanded to include Wood Group PLC as EPC. The proposed Phase II work leads to a pilot-scale engineering demonstration (TRL 6) to be conducted at Southern Company’s Plant Rowan, where the prototype system will perform “all the functions that will be required of the operational system.” The proposed pilot will facilitate commercialization (TRL-9) by scale-up to utility-scale systems integrated with peaking GTs or directly to facility scale systems using industrial GTs. The conceptual design for the pilot plant focuses on the novel integration aspects of LSCC technology. A slipstream of gas turbine exhaust will feed a waste heat recovery unit coupled to a molten salt steam generator heated by stored energy. The pilot is intended to demonstrate all key operating modes of the LSCC technology during charging, discharging and standby. The pilot equipment will be approximately one-seventh scale of the LM6000 commercial target and is expected to have commercial off-ramp potential for facility-scale applications.

01 COAL, LIGNITE, AND PEAT↗

CTES Pilot Plant Detailed Design Report

Energy storage is becoming an increasingly important component on modern power grids to ensure sufficient balancing capability for intermittent renewable power generations is available to maintain system reliability. Although energy storage has traditionally been provided by pumped storage hydroelectric systems, it is not possible to install these at every location and they can be expensive to construct. Lithium Ion batteries are increasingly being used to carry out energy storage grid services, however these can be expensive when specified over a few hours of capacity. An alternative way to store substantial energy is to use thermal energy storage (TES). This has been deployed on concentrated solar units using molten nitrate salts as a storage media. Again, the cost of the material can be prohibitive, thus lower cost alternative materials are being actively sought, such as sand, rocks and concrete. This project investigates the potential for Concrete Thermal Energy Storage (CTES) when used to directly store thermal energy from a thermal plant source. This report represents the Detailed Design phase deliverables comprising of the process, mechanical, electrical, piping along with control and instrumentation documents. Civil and structural deliverables are included on a preliminary basis due to outstanding site investigation activities. CTES block transportation testing results and the pilot plant testing plan is also included in this report.

25 ENERGY STORAGE↗

Front End Engineering Design Report

Energy storage is becoming an increasingly important component on modern power grids to ensure sufficient balancing capability for intermittent renewable power generations is available to maintain system reliability. Although energy storage has traditionally been provided by pumped storage hydroelectric systems, it is not possible to install these at every location and they can be expensive to construct. Lithium Ion batteries are increasingly being used to carry out energy storage grid services, however these can be expensive when specified over a few hours of capacity. An alternative way to store substantial energy is to use thermal energy storage (TES). This has been deployed on concentrated solar units using molten nitrate salts as a storage media. Again, the cost of the material can be prohibitive, thus lower cost alternative materials are being actively sought, such as sand, rocks and concrete. This project investigates the potential for Concrete Thermal Energy Storage (CTES) when used to directly store thermal energy from a thermal plant source. This report represents the initial Front-End Engineering Design (FEED) deliverables that are submitted for the Hazard and Operability (HAZOP) safety review for process validation.

25 ENERGY STORAGE↗

Enabling Staged Pressurized Oxy-Combustion: Improving Flexibility and Performance at Reduced Cost

Introduction: The staged pressurized oxy-combustion (SPOC) process, developed by Washington University in St. Louis (WUSTL), is an oxy-combustion carbon capture technology that employs a steam power cycle to generate electricity. As with atmospheric-pressure oxy-combustion processes, carbon dioxide (CO 2 ) capture rates of 90% or higher can be achieved. The staged-combustion approach of the SPOC process, when operated at elevated gas pressure, allows for near elimination of flue gas recycle (FGR) and leads to significant improvements in efficiency and reduced costs. The primary goal of this project was to investigate the potential for SPOC for flexible operation beyond the capabilities of conventional coal-fired power plants, particularly those employing carbon capture and storage (CCS). Oxy-combustion differs from conventional coal combustion in that the combustion of coal is carried out using oxygen as opposed to air. The resultant flue gas is a mixture of primarily CO 2 and water, greatly simplifying CO 2 capture. As SPOC does the oxy-combustion process under pressure, it is higher efficiency and lower cost than atmospheric oxy-combustion. The project was led by the Electric Power Research Institute, Inc., with the assistance of WUSTL, Doosan Babcock (DBL – boiler plant original equipment manufacturer), and Air Liquide (AL – air separation experts). The specific objectives of the project were to: (1) Evaluate the SPOC concept and develop a risk-based approach to the heating surface layout ensuring that performance (gas and steam side), manufacturing, transportation, and plant erection considerations were fully accounted for in the system design. (2) Improve the technology to ensure its performance and cost potential are substantially better than today’s baseline pulverized coal power plant with post-combustion capture (PCC) or atmospheric oxy-combustion, and show progress toward performance commensurate with projected commercial operation, including 90% or more CO 2 capture. (3) Address critical technology gaps and improving overall system performance for the technology. (4) Perform combustion tests at scale under commensurate pressure to the commercial operating system validate combustor and advance the SPOC combustion modeling tools that will facilitate full-scale design. Combustion Testing: Testing was initially carried out at atmospheric pressure with methane to ensure that all systems were correctly operating. Following this, the testing then proceeded to moderate pressure operation at 4 bara, where different stoichiometric conditions were used across an extended heat input range, showing that a stable flame could be maintained. Testing then proceeded at 10 and 15 bara where it was shown that the ignition system needed to be replaced at these operating conditions. When testing recommenced, a similar stable flame shape was achieved, without any methane support, and the full 100 kWth coal oxy-combustion was demonstrated. Heat flux measurements showed 400 kW/m 2 (0.126 MMBtu/hr-ft 2 ) from the flame, within the 450 kW/m 2 (0.142 MMBtu/hr-ft 2 ) preferred limit defined by DBL for the full-scale design case. Carbon monoxide and carbon-in-ash measurements showed that complete combustion was possible with ultra-low excess oxygen at 1 vol % in the product flue gas. This allowed the full-scale models to be calculated based on this level of excess oxygen, improving the performance of the system as lower feed oxygen is produced in the air separation unit (ASU), saving auxiliary power. Full-Scale Design: The full-scale design is sized to deliver 550 MWe net electrical power output to allow direct comparison with the National Energy Technology Laboratory (NETL) baseline cases using the same Montana Powder River Basin (PRB) fuel. The cases used for direct comparison are: Case S12A (supercritical [SC] coal without CO 2 capture), Case S12B (SC coal with PCC at 90% CO 2 capture, and Case S12F (atmospheric oxy-combustion SC coal with 90% CO 2 capture). The SPOC stages were configured to be identical arrangements, allowing for a more straightforward design, construction, and control strategy. Each stage consists of two PVs, the first being the combustor PV module and the second being the convective PV module. The combustor module is the tallest vessel, with local coal feeding equipment and the burner FGR and oxygen plenums at the top and ash management at the bottom. The combustor module is effectively an open cross section with membrane tubes around the circumference – this unobstructed slender profile ensures that the relatively slower burnout mechanism needed for the low-speed turbulent mixing burner can proceed unimpeded and that molten ash will not attach to any surfaces at an angle to the predominant flue gas flow. The steam turbine used in the SPOC design is essentially the same unit utilized in the atmospheric oxy-combustion case except the degree of heat recovery possible allows the low-pressure (LP) feedwater heater train to be eliminated. This is a result of being able to capture the latent heat of evaporation of the moisture produced in the combustion (normally lost to the stack). The SPOC system outperforms the NETL atmospheric oxy-combustion baseline case by 3.3% points and the PCC case by 7.5% points. This performance increase is mainly a result of the improved heat recovery possible from the product flue gas and from the reduced auxiliary power consumption from the ASU and the CO 2 compression and purification unit over the atmospheric equivalent. The combined improvement in boiler efficiency and reduction in the steam turbine heat rate resulted in a net improvement in the overall plant efficiency by 0.61%, to 35.6% on a HHV basis. This relatively small improvement in plant efficiency between sub-bituminous and bituminous coals shows the value of useful moisture latent heat recovery offered by the SPOC system when using low rank fuels. Flexibility and Turndown: The SPOC system has inherent high turndown capabilities because of a demonstrated high range of combustion stability and the ability to bypass stages, thereby reducing steam generation rates proportionally without altering firing rates in operating stages. ASU units do not generally offer significant turndown opportunities as they are limited by the performance of the compression plant. The baseline SPOC design has a 2-train ASU configuration, needed to be able to meet the 10,500 tonnes per day duty, that can deliver efficient turndown points between 85–100% load with both trains operating, and at 45–50% load with a single train operating. Outside these operating points, the flexibility and efficiency are limited and may be uncompetitive at loads below 45% as the ASU systems are unable to turndown beyond 85% for the base case and 70% for the flexible case. The ASU cold box for the flexible case was designed to operate at loads between 40-100%, below this operating range the purity of the produced oxygen cannot be guaranteed, resulting in additional load for the CPU equipment. The additional power consumption of these cases yields an uneconomic operating condition with poor efficiency when operating at low loads such as 25% and 12%. To address this flexibility constraint, AL evaluated how the ASU configuration could be altered to deliver efficient oxygen supply over the load range. This involved integrating the compressor duties across both ASU trains into a shared duty arrangement with multiple compressors, strategically sized to deliver the duty required across all load ranges between 40–100% by enabling different combinations of the main air compressors and the booster air compressors. The oxygen purity cannot be guaranteed below 40% load for each train – the power consumption at 25% and 12% loads were estimated based on the multi-compressor configuration at maximum turndown as these load cases were not considered in the flexible ASU design. With a different cold box configuration, i.e. number of trains, the entire load range could be delivered within oxygen purity specifications. Although there is a small efficiency reduction at full load, there are significant improvements in overall plant performance during low-load operation. The exact ASU configuration needed will therefore be dependent on the expected operating profile of the unit. Economic Analysis: Cost estimates for the baseline and the flexible cases were developed using NETL baseline case data for common BOP items and an Association for the Advancement of Cost Engineering International Class 5 (conceptual/screening study) assessment of key components unique to the SPOC system. The capital, operating, and maintenance costs were assessed along with the first-year power cost, levelized cost of electricity, and CO 2 captured and avoided cost for the SPOC cases were compared against the relevant NETL baseline cases in January 2019 dollars. Both SPOC cases achieve a lower cost that the alternative NETL baseline cases (with the flexible SPOC case being slightly higher than the baseline SPOC case due to the compounded impact of higher capital costs and lower efficiency at full load). The SPOC cases deliver a lower cost of CO 2 avoided than the NETL baseline cases due to greater efficiency in generating low-carbon power. However, the cost of CO 2 captured is higher because the higher efficiency of the SPOC process generates less CO 2 , hence less needs to be captured, resulting in a high capital cost being shared over a reduced CO 2 quantity. The flexible ASU adds 1.6% overall to the plant cost in comparison to the baseline case, but the efficiency improvements at loads below 50% are significant. Subsequently, depending on the plant load-profile expectation, the flexible ASU would be beneficial if the plant spends a significant portion of its operating life below 50% load. This kind of operating profile is likely to be required for all fossil plants when more renewable electricity generators are installed on the local grid, particularly solar power that can be predicted ahead of time, allowing for appropriate pricing signals to be incorporated into the diurnal cycle. R&D Recommendations: SPOC, while a promising technology, is a relatively recent concept and, as such, operability issues of combustor design and steam-side integration for such systems at a scale relevant to commercial deployment have not been evaluated. WUSTL has conducted extensive small pilot-scale (100 kWth) research to understand and advance pressurized oxy-combustion processes, including investigation of combustion and flame characteristics, radiative heat flux, burner operability, turn down, char burnout, ash characteristics, water-wash column operation, etc. for pressurized oxy-combustion systems. Nonetheless, at this stage in the development of the SPOC process, what is needed is a large-scale pilot plant that can serve to study pressurized oxy-combustion systems and components at a scale commensurate with the maturity of the technology. A scale of 10 MWth, which includes steam-side integration and two stages would yield essential information with respect to heat transfer characteristics both in the radiative and convective sections of the pressure vessels, and the ability to operate the fuel staging process. In addition, while modeling results indicate that combustion and flame characteristics improve with scale, direct studies of the combustor at this scale will ensure that the models can be relied upon for scale up to commercial scale. Furthermore, a detailed analysis must be performed to understand the scaling aspects of key components and systems.

20 FOSSIL-FUELED POWER PLANTS↗