Bidding Curve Design for Hybrid Power Plants with Uncertain Solar Forecast

This paper presents a novel bidding curve design algorithm tailored for hybrid power plants (HPPs) to participate in the wholesale electricity market. Utilizing forecasts for photovoltaic (PV) generation and available battery power, our algorithm strategically computes the bidding curve to maximize HPP profit while adeptly managing the inherent uncertainty associated with PV power generation. In addition, the introduction of the penalty cost in HPP bidding curves provides the system operator a tool to effectively manage the system-level uncertainty that caused by HPPs. Numerical analysis through Monte Carlo simulations confirms that our bidding curve methodology outperforms the benchmark across various scenarios.

bidding curve↗

Bidding Curve Design for Hybrid Power Plants with Uncertain Solar Forecast: Preprint

This paper presents a novel bidding curve design algorithm tailored for hybrid power plants (HPPs) to participate in the wholesale electricity market. Utilizing forecasts for photovoltaic (PV) generation and available battery power, our algorithm strategically computes the bidding curve to maximize HPP profit while adeptly managing the inherent uncertainty associated with PV power generation. In addition, the introduction of the penalty cost in HPP bidding curves provides the system operator a tool to effectively manage the system-level uncertainty that caused by HPPs. Numerical analysis through Monte Carlo simulations confirms that our bidding curve methodology outperforms the benchmark across various scenarios.

bidding curve↗

Transient Stability Enhancement via a Scalable RL Method with VSG Parameter Tuning

This paper presents a reinforcement learning (RL)-driven strategy to improve the transient stability of power systems via tuning parameters of multiple virtual synchronous generators (VSGs). We proposed a scalable method to support RL training convergence probability and speed, even when a large number of contingencies are considered. The proposed scalable RL framework first decomposes the large number of contingencies into multiple groups and then conducts parallel training for each group, decreasing the state space and complexity of each training. Additionally, we propose a contingency grouping algorithm to streamline the RL action space and facilitate the training. The proposed method is validated across various standard test systems.

Huang, Xiaoge↗

A Trade-Off Study Between the Primary and Transient Responses of Grid-Forming Inverters

The control parameters of the grid-forming (GFM) inverter-based resources (IBRs) directly impact power system dynamics. The primary control requires the GFM inverter to balance generation and load. It is also preferred that a GFM inverter maintain the terminal frequency after a power system fault. In this paper, we investigate the trade-off between the primary control objective and the transient response. To quantify the transient performance of the GFM inverter, we introduce a new real-time transient stability index (TSI). This index plays a crucial role in our investigation, as it allows us to compare the performance trade-offs of different sets of GFM control parameters.

Lin, Xuheng↗

Transient Stability Preventive Control via Tuning the Parameters of Virtual Synchronous Generators

This paper presents an optimal preventive control (OPC) method to improve the power system transient stability via tuning the transient parameter of virtual synchronous generators. The novelty of this work is that we formulate the preventive control as an optimization problem so that inverter parameters can be adjusted at the pre-contingency stage. A reinforcement learning (RL)-driven method is proposed to solve the OPC problem with the fault energy-based reward function. An ANDES-based RL environment is also developed. Versatile functions included in the proposed environment have been presented in this paper. The proposed OPC formulation, the RLdriven method, and the fault energy-based reward function are verified on several standard test systems.

Inverter-based resources, virtual synchronous gene↗

Arbitrage and Capacity Firming in Coordination with Day-Ahead Bidding of a Hybrid PV Plant

A hybrid PV plant (HPP) combines a photovoltaic (PV) plant with a battery energy storage system (BESS), which is considered a promising step towards the future of renewable power plants by the U.S. Department of Energy. When the renewable penetration reaches a significant level, a hybrid PV plant can bid in as a controllable thermal plant in the future electricity market. In this study, a bidding and BESS scheduling model is proposed for the HPP. The robust optimization (RO) technique has been utilized to identify the worst-case scenario of uncertainties during the bidding process. To address the overly conservative issue of the single-stage RO, we have decoupled the BESS schedule for arbitrage and PV capacity firming by a two-stage RO formulation. By comparing the output of single-stage RO and two-stage RO, the two-stage RO bids and schedules in a more aggressive manner, which increases the income of HPP. Also, the penalty of under-generation is considered in our model so that the day-ahead bidding decision and arbitrage schedules can be adjusted based on the potential UNDER-GENERATION penalty. Because the proposed model is non-convex and contains multi-stages, the Column-and-Constraint Generation (C&CG) algorithm is applied to the model as the solution. The proposed model has shown better economic performance compared to a state-of-art single-stage bidding method in case studies.

BESS scheduling↗

Arbitrage and Capacity Firming in Coordination with Day-Ahead Bidding of a Hybrid PV Plant: Preprint

A hybrid PV plant (HPP) combines a photovoltaic (PV) plant with a battery energy storage system (BESS), which is considered a promising step towards the future of renewable power plants by the U.S. Department of Energy. When the renewable penetration reaches a significant level, a hybrid PV plant can bid in as a controllable thermal plant in the future electricity market. In this study, a bidding and BESS scheduling model is proposed for the HPP. The robust optimization (RO) technique has been utilized to identify the worst-case scenario of uncertainties during the bidding process. To address the overly conservative issue of the single-stage RO, we have decoupled the BESS schedule for arbitrage and PV capacity firming by a two-stage RO formulation. By comparing the output of single-stage RO and two-stage RO, the two-stage RO bids and schedules in a more aggressive manner, which increases the income of HPP. Also, the penalty of under-generation is considered in our model so that the day-ahead bidding decision and arbitrage schedules can be adjusted based on the potential UNDER-GENERATION penalty. Because the proposed model is non-convex and contains multi-stages, the Column-and-Constraint Generation (C&CG) algorithm is applied to the model as the solution. The proposed model has shown better economic performance compared to a state-of-art single-stage bidding method in case studies.

BESS scheduling↗

Day-Ahead Bidding and Scheduling Method of a PV + Storage Plant

A Hybrid PV plant refers to the paradigm combining a PV farm with a battery energy storage system (BESS). Our study aims to answer the following questions. a) when the renewable penetration reaches 70%, a hybrid PV plant should bid as a thermal plant in the future electricity market. How should a hybrid PV plant bid in this market? b) the BESS can be used for arbitrage and/or capacity firming. How to schedule the BESS's operation in coordination with the bid decision?