Two criteria for the selection of assembly plans - Maximizing the flexibility of sequencing the assembly tasks and minimizing the assembly time through parallel execution of assembly tasks

The authors introduce two criteria for the evaluation and selection of assembly plans. The first criterion is to maximize the number of different sequences in which the assembly tasks can be executed. The second criterion is to minimize the total assembly time through simultaneous execution of assembly tasks. An algorithm that performs a heuristic search for the best assembly plan over the AND/OR graph representation of assembly plans is discussed. Admissible heuristics for each of the two criteria introduced are presented. Some implementation issues that affect the computational efficiency are addressed.

Homem De Mello, Luiz S.↗

Representations of mechanical assembly sequences

Five types of representations for assembly sequences are reviewed: the directed graph of feasible assembly sequences, the AND/OR graph of feasible assembly sequences, the set of establishment conditions, and two types of sets of precedence relationships. (precedence relationships between the establishment of one connection between parts and the establishment of another connection, and precedence relationships between the establishment of one connection and states of the assembly process). The mappings of one representation into the others are established. The correctness and completeness of these representations are established. The results presented are needed in the proof of correctness and completeness of algorithms for the generation of mechanical assembly sequences.

Homem De Mello, Luiz S.↗

AND/OR graph representation of assembly plans

A compact representation of all possible assembly plans of a product using AND/OR graphs is presented as a basis for efficient planning algorithms that allow an intelligent robot to pick a course of action according to instantaneous conditions. The AND/OR graph is equivalent to a state transition graph but requires fewer nodes and simplifies the search for feasible plans. Three applications are discussed: (1) the preselection of the best assembly plan, (2) the recovery from execution errors, and (3) the opportunistic scheduling of tasks. An example of an assembly with four parts illustrates the use of the AND/OR graph representation in assembly-plan preselection, based on the weighting of operations according to complexity of manipulation and stability of subassemblies. A hypothetical error situation is discussed to show how a bottom-up search of the AND/OR graph leads to an efficient recovery.