Engineering PapersSearch

Engineering topics

Holladay, Jon

Publications and source records attributed to Holladay, Jon.

Model-Based Systems Engineering Pathfinder: Informing the Next Steps

In 2016, the NASA Engineering and Safety Center established a model-based systems engineering (MBSE) Pathfinder. The primary motivations for establishing the MBSE Pathfinder were to advance the Agency's applications of MBSE and capture lessons-learned to inform the next steps. The MBSE Pathfinder had four teams working in parallel for eight months on different topics of interest to NASA. The teams were encouraged to learn, and use creativity and innovation in their system modeling. The results were captured via reports, webinars, and a knowledge capture meeting. The approach taken for the MBSE Pathfinder was very successful in providing a number of lessons-learned for NASA and for other organizations considering MBSE or pathfinder efforts, and in building a very strong and collaborative user community.

Weiland, Karen J.

Space Launch System Upper Stage Technology Assessment

The Space Launch System (SLS) is envisioned as a heavy-lift vehicle that will provide the foundation for future beyond low-Earth orbit (LEO) exploration missions. Previous studies have been performed to determine the optimal configuration for the SLS and the applicability of commercial off-the-shelf in-space stages for Earth departure. Currently NASA is analyzing the concept of a Dual Use Upper Stage (DUUS) that will provide LEO insertion and Earth departure burns. This paper will explore candidate in-space stages based on the DUUS design for a wide range of beyond LEO missions. Mission payloads will range from small robotic systems up to human systems with deep space habitats and landers. Mission destinations will include cislunar space, Mars, Jupiter, and Saturn. Given these wide-ranging mission objectives, a vehicle-sizing tool has been developed to determine the size of an Earth departure stage based on the mission objectives. The tool calculates masses for all the major subsystems of the vehicle including propellant loads, avionics, power, engines, main propulsion system components, tanks, pressurization system and gases, primary structural elements, and secondary structural elements. The tool uses an iterative sizing algorithm to determine the resulting mass of the stage. Any input into one of the subsystem sizing routines or the mission parameters can be treated as a parametric sweep or as a distribution for use in Monte Carlo analysis. Taking these factors together allows for multi-variable, coupled analysis runs. To increase confidence in the tool, the results have been verified against two point-of-departure designs of the DUUS. The tool has also been verified against Apollo moon mission elements and other manned space systems. This paper will focus on trading key propulsion technologies including chemical, Nuclear Thermal Propulsion (NTP), and Solar Electric Propulsion (SEP). All of the key performance inputs and relationships will be presented and discussed in light of the various missions. For each mission there are several trajectory options and each will be discussed in terms of delta-v required and transit duration. Each propulsion system will be modeled, sized, and judged based on their applicability to the whole range of beyond LEO missions. Criteria for scoring will include the resulting dry mass of the stage, resulting propellant required, time to destination, and an assessment of key enabling technologies. In addition to the larger metrics, this paper will present the results of several coupled sensitivity studies. The ultimate goals of these tools and studies are to provide NASA with the most mass-, technology-, and cost-effective in-space stage for its future exploration missions.

Holladay, Jon

SLS Dual Use Upper Stage (DUUS) Opportunities

Objective: Provide an overview of SLS DUUS type capability requirements to provide context for possible International Partner collaboration. Addition of a DUUS would greatly increase exploration mission capture and performance margin for cis-Lunar and Near Earth System exploration campaigns.

Creech, Steve

Affordability Approaches for Human Space Exploration

The design and development of historical NASA Programs (Apollo, Shuttle and International Space Station), have been based on pre-agreed missions which included specific pre-defined destinations (e.g., the Moon and low Earth orbit). Due to more constrained budget profiles, and the desire to have a more flexible architecture for Mission capture as it is affordable, NASA is working toward a set of Programs that are capability based, rather than mission and/or destination specific. This means designing for a performance capability that can be applied to a specific human exploration mission/destination later (sometime years later). This approach does support developing systems to flatter budgets over time, however, it also poses the challenge of how to accomplish this effectively while maintaining a trained workforce, extensive manufacturing, test and launch facilities, and ensuring mission success ranging from Low Earth Orbit to asteroid destinations. NASA Marshall Space Flight Center (MSFC) in support of Exploration Systems Directorate (ESD) in Washington, DC has been developing approaches to track affordability across multiple Programs. The first step is to ensure a common definition of affordability: the discipline to bear cost in meeting a budget with margin over the life of the program. The second step is to infuse responsibility and accountability for affordability into all levels of the implementing organization since affordability is no single person s job; it is everyone s job. The third step is to use existing data to identify common affordability elements organized by configuration (vehicle/facility), cost, schedule, and risk. The fourth step is to analyze and trend this affordability data using an affordability dashboard to provide status, measures, and trends for ESD and Program level of affordability tracking. This paper will provide examples of how regular application of this approach supports affordable and therefore sustainable human space exploration architecture.

Holladay, Jon

Space Launch System Mission Flexibility Assessment

The Space Launch System (SLS) is envisioned as a heavy lift vehicle that will provide the foundation for future beyond low Earth orbit (LEO) missions. While multiple assessments have been performed to determine the optimal configuration for the SLS, this effort was undertaken to evaluate the flexibility of various concepts for the range of missions that may be required of this system. These mission scenarios include single launch crew and/or cargo delivery to LEO, single launch cargo delivery missions to LEO in support of multi-launch mission campaigns, and single launch beyond LEO missions. Specifically, we assessed options for the single launch beyond LEO mission scenario using a variety of in-space stages and vehicle staging criteria. This was performed to determine the most flexible (and perhaps optimal) method of designing this particular type of mission. A specific mission opportunity to the Jovian system was further assessed to determine potential solutions that may meet currently envisioned mission objectives. This application sought to significantly reduce mission cost by allowing for a direct, faster transfer from Earth to Jupiter and to determine the order-of-magnitude mass margin that would be made available from utilization of the SLS. In general, smaller, existing stages provided comparable performance to larger, new stage developments when the mission scenario allowed for optimal LEO dropoff orbits (e.g. highly elliptical staging orbits). Initial results using this method with early SLS configurations and existing Upper Stages showed the potential of capturing Lunar flyby missions as well as providing significant mass delivery to a Jupiter transfer orbit.

Monk, Timothy

Cargo-Positioning System for Next-Generation Spacecraft

A report discusses a proposed system for mounting loaded pallets in the cargo bay of a next-generation space-shuttle-like spacecraft, such that the center of mass of the cargo would lie within a 1-in. (2.54-cm) cube that would also contain the center of mass of the spacecraft. The system would include (1) an algorithm for planning the locations of the pallets, given the geometric and weight properties of the pallets, and the geometric restrictions of the cargo bay; (2) quick-connect/quick-disconnect mounting mechanisms similar to those now used on air hoses; (3) other mounting mechanisms, comprising mostly spring-loaded pins, in a locking subsystem that would prevent shifting of the pallets under load; and (4) mechanisms for performing fine position adjustments to satisfy the center-of-mass requirement. The position- adjusting mechanisms would be motor-driven lead-screw mechanisms in groups of three - one for positioning each pin of the locking subsystem along each of three mutually perpendicular coordinate axes. The system also would include a triple-threaded screw that would provide compensation for thermal expansion or contraction of the spacecraft.

Holladay, Jon

Guidelines for Developing Spacecraft Structural Requirements: A Thermal and Environmental Perspective

Spacecraft are typically designed with a primary focus on weight in order to meet launch vehicle performance parameters. However, for pressurized and/or man-rated spacecraft, it is also necessary to have an understanding of the vehicle operating environments to properly size the pressure vessel. Proper sizing of the pressure vessel requires an understanding of the space vehicle's life cycle and compares the physical design optimization (weight and launch "cost") to downstream operational complexity and total life cycle cost. This paper will provide an overview of some major environmental design drivers and provide examples for calculating the optimal design pressure versus a selected set of design parameters related to thermal and environmental perspectives. In addition, this paper will provide a generic set of cracking pressures for both positive and negative pressure relief valves that encompasses worst case environmental effects for a variety of launch / landing sites. Finally, several examples are included to highlight pressure relief set points and vehicle weight impacts for a selected set of orbital missions.

Holladay, Jon

An Integrated Approach to Thermal Management of International Space Station Logistics Flights, Improving the Efficiency

The efficiency of re-useable aerospace systems requires a focus on the total operations process rather than just orbital performance. For the Multi-Purpose Logistics Module this activity included special attention to terrestrial conditions both pre-launch and post-landing and how they inter-relate to the mission profile. Several of the efficiencies implemented for the MPLM Mission Engineering were NASA firsts and all served to improve the overall operations activities. This paper will provide an explanation of how various issues were addressed and the resulting solutions. Topics range from statistical analysis of over 30 years of atmospheric data at the launch and landing site to a new approach for operations with the Shuttle Carrier Aircraft. In each situation the goal was to "tune" the thermal management of the overall flight system for minimizing requirement risk while optimizing power and energy performance.

Holladay, Jon

The International Space Station's Multi-Purpose Logistics Module, Thermal Performance of the First Five Flights

The Multi-Purpose Logistics Module is the primary carrier for transport of pressurized payload to the International Space Station. Performing five missions within a thirteen month span provided a unique opportunity to gather a great deal of information toward understanding and verifying the orbital performance of the vehicle. This paper will provide a brief overview of the hardware history and design capabilities followed by a summary of the missions flown, resource requirements and possibilities for the future.

Holladay, Jon

Mission Engineering of a Rapid Cycle Spacecraft Logistics Fleet

The requirement for logistics re-supply of the International Space Station has provided a unique opportunity for engineering the implementation of NASA's first dedicated pressurized logistics carrier fleet. The NASA fleet is comprised of three Multi-Purpose Logistics Modules (MPLM) provided to NASA by the Italian Space Agency in return for operations time aboard the International Space Station. Marshall Space Flight Center was responsible for oversight of the hardware development from preliminary design through acceptance of the third flight unit, and currently manages the flight hardware sustaining engineering and mission engineering activities. The actual MPLM Mission began prior to NASA acceptance of the first flight unit in 1999 and will continue until the de-commission of the International Space Station that is planned for 20xx. Mission engineering of the MPLM program requires a broad focus on three distinct yet inter-related operations processes: pre-flight, flight operations, and post-flight turn-around. Within each primary area exist several complex subsets of distinct and inter-related activities. Pre-flight processing includes the evaluation of carrier hardware readiness for space flight. This includes integration of payload into the carrier, integration of the carrier into the launch vehicle, and integration of the carrier onto the orbital platform. Flight operations include the actual carrier operations during flight and any required real-time ground support. Post-flight processing includes de-integration of the carrier hardware from the launch vehicle, de-integration of the payload, and preparation for returning the carrier to pre-flight staging. Typical space operations are engineered around the requirements and objectives of a dedicated mission on a dedicated operational platform (i.e. Launch or Orbiting Vehicle). The MPLM, however, has expanded this envelope by requiring operations with both vehicles during flight as well as pre-launch and post-landing operations. These unique requirements combined with a success-oriented schedule of four flights within a ten-month period have provided numerous opportunities for understanding and improving operations processes. Furthermore, it has increased the knowledge base of future Payload Carrier and Launch Vehicle hardware and requirement developments. Discussion of the process flows and target areas for process improvement are provided in the subject paper. Special emphasis is also placed on supplying guidelines for hardware development. The combination of process knowledge and hardware development knowledge will provide a comprehensive overview for future vehicle developments as related to integration and transportation of payloads.

Holladay, Jon