Engineering Papers⌕ Search

Engineering topics

Hofle, W

Publications and source records attributed to Hofle, W.

LHC Abort Gap Cleaning Studies During Luminosity Operation

The presence of significant intensities of un-bunched beam is a potentially serious issue in the LHC. Procedures using damper kickers for cleaning both the Abort Gap (AG) and the buckets targeted for injection, are currently in operation at flat bottom. Recent observations of relatively high population of the AG during physics runs brought up the need for AG cleaning during luminosity operation. In this paper the results of experimental studies performed in October 2011 are presented.

43 PARTICLE ACCELERATORS↗

SIMULATION OF E-CLOUD DRIVEN INSTABILITY AND ITS ATTENUATION USING A FEEDBACK SYSTEM IN THE CERN SPS

Electron clouds have been shown to trigger fast growing instabilities on proton beams circulating in the SPS [1], and a feedback system to control the instabilities is under active development [2]. We present the latest improvements to the Warp-Posinst simulation framework and feedback model, and its application to the self-consistent simulations of two consecutive bunches interacting with an electron cloud in the SPS.

70 PLASMA PHYSICS AND FUSION TECHNOLOGY↗

SPS ECLOUD INSTABILITIES - ANALYSIS OF MACHINE STUDIES AND IMPLICATIONS FOR ECLOUD FEEDBACK

The SPS at high intensities exhibits transverse single-bunch instabilities with signatures consistent with an Ecloud driven instability. They present recent MD data from the SPS, details of the instrument technique and spectral analysis methods which help reveal complex vertical motion that develops within a subset of the injected bunch trains. The beam motion is detected via wideband exponential taper striplines and delta-sigma hybrids. The raw sum and difference data is sampled at 50 GHz with 1.8 GHz bandwidth. sliding window FFT techniques and RMS motion techniques show the development of large vertical tune shifts on portions of the bunch of nearly 0.025 from the base tune of 0.185. Results are presented via spectrograms and bunch slice trajectories to illustrate development of the unstable beam and time scale of development along the injected bunch train. The study shows that the growing unstable motion occupies a very broad frequency band of 1.2 GHz. These measurements are compared to numerical simulation results, and the system parameter implications for an Ecloud feedback system are outlined.

60 APPLIED LIFE SCIENCES↗

Performance of exponential coupler in the SPS with LHC type beam for transverse broadband instability analysis

We present the performance and limitations of the SPS exponential coupler [1] for transverse instability measurements with LHC type beam. Data were acquired in 2008 in the SPS in the time domain with a bandwidth of up to 2.5 GHz. The data were filtered to extract the time evolution of transverse oscillations within the less than 5 ns long LHC type bunches. We describe the data filtering techniques and show the limitations of the pick-up due to propagating modes.

43 PARTICLE ACCELERATORS↗

Feedback Techniques and Ecloud Instabilites - Design Estimates

The SPS at high intensities exhibits transverse single-bunch instabilities with signatures consistent with an Ecloud driven instability. While the SPS has a coupled-bunch transverse feedback system, control of Ecloud-driven motion requires a much wider control bandwidth capable of sensing and controlling motion within each bunched beam. This paper draws beam dynamics data from the measurements and simulations of this SPS instability, and estimates system requirements for a feedback system with 2-4 GS/sec. sampling rates to damp Ecloud-driven transverse motion in the SPS at intensities desired for high-current LHC operation.

43 PARTICLE ACCELERATORS↗

Ringing in the pulse response of long and wideband coaxial transmission lines due to group delay dispersion

In particle accelerators coaxial cables are commonly used to transmit wideband beam signals covering many decades of frequencies over long distances. Those transmission lines often have a corrugated outer and/or inner conductor. This particular construction exhibits a significant amount of frequency dependent group delay variation. A comparison of simulations based on theoretical models, numerical simulations and S{sub 21} network analyzer measurements up to 2.5 GHz is presented. It is shown how the non-linear phase response and varying group delay leads to ringing in the pulse response and subsequent distortion of signal s transmitted through such coaxial transmission lines.

24 POWER TRANSMISSION AND DISTRIBUTION↗

Analysis of the transverse SPS beam coupling impedance with short and long bunches

The upgrade of the CERN Large Hadron Collider (LHC) would require a four- to five-fold increase of the single bunch intensity presently obtained in the Super Proton Synchrotron (SPS). Operating at such high single bunch intensities requires a detailed knowledge of the sources of SPS beam coupling impedance, so that longitudinal and transverse impedance reduction campaigns can be planned and performed effectively if needed. In this paper, the transverse impedance of the SPS is studied by injecting a single long bunch into the SPS, and observing its decay without RF. Longer bunches allow for higher frequency resolution of the longitudinal and transverse bunch spectra acquired with strip line couplers connected to a fast data acquisition. It also gives access to the frequency content of the transverse impedance. Results from measurements with short and long bunches in the SPS performed in 2008 are compared with simulations.

43 PARTICLE ACCELERATORS↗

Feedback techniques and SPS Ecloud instabilities - design estimates

The SPS at high intensities exhibits transverse single-bunch instabilities with signatures consistent with an Ecloud driven instability. While the SPS has a coupled-bunch transverse feedback system, control of Ecloud driven motion requires a much wider control bandwidth capable of sensing and controlling motion within each bunched beam. This paper draws beam dynamics data from the measurements and simulations of this SPS instability, and estimates system requirements for a feedback system with 2-4 GS/sec. sampling rates to damp Ecloud-driven transverse motion in the SPS at intensities desired for high-current LHC operation.

43 PARTICLE ACCELERATORS↗