Engineering Papers⌕ Search

Engineering topics

Hill, Gerald

Publications and source records attributed to Hill, Gerald.

Establishing an Early CO 2 Storage Complex in Kemper County, Mississippi (ECO 2 S) (CarbonSAFE Phase II, Final Report)

The CarbonSAFE Phase II: Storage Complex Feasibility project, entitled “Establishing an Early CO 2 Storage Complex in Kemper County, Mississippi: Project ECO 2 S,” demonstrates that the subsurface adjacent to the Kemper County energy facility can safely and permanently store commercial-scale volumes of carbon dioxide (CO 2 ). Project ECO 2 S is led by the Southern States Energy Board (SSEB). Mississippi Power Company (MPC) serves as the site host. The project includes technical and field implementation support from Advanced Resources International (ARI) and obtains analytical support from two national laboratories (Los Alamos and Lawrence Berkeley), a host of universities, and other key participants. A 30,000-acre area of interest was established. Three new characterization wells were drilled to facilitate the detailed geologic analyses, characterization, and modeling of three prospective storage reservoirs. The results verify and validate that the subsurface reservoirs examined have gigatonne CO 2 storage potential. This final report documents the achievements of the project team in successfully attaining the goals and objectives set forth for the project and summarizes the results of the feasibility study.

01 COAL, LIGNITE, AND PEAT↗

CO 2 Storage Site Screening Platform Development and CO 2 Storage Resource Analysis in SECARB Offshore Reservoirs Using SAS Viya

A major goal of the SECARB Offshore Partnership (DE-FE0031557) is to screen deep saline aquifers and hydrocarbon reservoirs in the central Gulf of Mexico for CO 2 sequestration and CO 2 -enhanced oil and gas recovery (EOR/EGR) and estimate the corresponding CO 2 storage resources for select reservoirs. CO 2 storage potential associated with offshore CO 2 -EOR is considerable and likely represents “low hanging fruit” for near-term CO 2 storage given the in-place infrastructure in the region. It is for these reasons that this assessment focuses on oil and gas fields. To this end, three major objectives have been completed and include (1) managing geological data derived from different sources, (2) building a reservoir screening platform for CO 2 storage, and (3) ranking the reservoirs based on the estimated CO 2 storage resources. The SAS ® Viya platform was used for data management and analytics. The Viya platform is a cloud service platform that provides data integration, data management, quick analytics, data visualization, machine learning functions, and application programming interfaces (APIs) for multi-programming languages. Different sources of data containing geologic information, reservoir properties, and EOR/EGR information were collected, cleaned, formatted, and loaded into the SAS ® Viya platform for evaluation. The major geological characteristics of both shelf and deep-water areas of the central Gulf were examined and compared to define the appropriate reservoir screening criteria. Next, a CO 2 storage site screening system was built in the SAS ® Viya platform with the pre-defined criteria. Finally, the CO 2 storage resources of the screened reservoirs were calculated and reported at the BOEM field level to identify fields with the highest estimated CO 2 storage resource. The fields with the largest total estimated CO 2 storage resource are located in the Mississippi Canyon protraction area. Due to proximity to the Mississippi Delta (indicative of less infrastructure) and large estimated CO 2 storage resources, future development activities may wish to focus efforts in the Mississippi Canyon protraction area.

02 PETROLEUM↗

Factors Determining Commercially Optimal Development Strategies for CO 2 Storage With and Without CO 2 -EOR

This report is a draft white paper on the factors determining commercially optimal development strategies for CO 2 storage with and without CO 2 -EOR. The draft report provides a summary of accomplishments during the first budget period of the Southeast Offshore Storage Resource Assessment for the Gulf of Mexico (SECARB Offshore GOM) project. It also identifies “Next Steps” to be undertaken during Budget Period II. A final white paper will be prepared at the end of Budget Period II. The goal of this draft white paper is to expand the knowledge base required for commercially viable, secure, longterm, large-scale carbon dioxide (CO 2 ) subsea storage in the U.S. Gulf of Mexico (GOM), both with and without enhanced hydrocarbon recovery. This effort supports the U.S. Department of Energy’s (DOE) long-term objective of ensuring a comprehensive assessment of the potential for offshore CO 2 subsea storage in the GOM. The groundwork that has been completed in the draft white paper advanced by expanding the membership of the Southern States Energy Board’s (SSEB) existing Southeast Offshore Storage Resource Assessment (DE-FE0026082) GOM government-industry partnership during the next budget period. Further, the team plans to consult with U.S. federal and state agencies to develop recommendations to remove barriers and streamline the regulatory process to encourage subsea CO 2 storage with or without enhanced hydrocarbon recovery.

02 PETROLEUM↗

Characterization of Offshore Storage Resource Potential in the Central Planning Area of the Gulf of Mexico

This report contains a brief overview of the several studies that provide the basis for this work and details the reservoir characterization efforts that have been completed to date. Briefly, geological characterization data suggests that the deep-water reservoirs are the result of the interplay between turbidite depositional systems and salt tectonics. Project Partners have estimated the CO 2 storage capacity associated with saline reservoirs and that associated with CO 2 -Enhanced Oil Recovery (EOR) in the state waters of Louisiana. In addition, Project Partners have conducted a detailed analysis of CO 2 storage potential associated with CO 2 -EOR in the central planning area of the GOM. This work estimates that 3,140 million metric tonnes of CO 2 can be stored in optimal reservoirs of the shallow- and deep-water central GOM. A reduced order modeling and machine learning approach is introduced that will be used to evaluate CO 2 storage capacity and plume dynamics for down-selected, reservoir-specific, saline characterization. Last, a brief discussion establishes how the data presented in this report will support future work.

02 PETROLEUM↗

Parametric Study to Assess Technical Prospect Feasibility for Offshore CO 2 Storage

This report is a white paper on the parametric study to assess technical prospect feasibility for CO 2 storage with and without CO 2 -EOR. The SECARB Offshore GOM team reviewed key parameters that previous modeling experience suggests have the largest impact on CO 2 plume size and CO 2 -EOR performance (SSEB, 2019) These parameters include tectonic impacts (reservoir dip and fault block size), reservoir properties (permeability) and development strategies (well field payout, waterflood, and CO 2 flooding strategies). These parameters are further evaluated in this study in order to identify upper and lower boundary conditions for the parametric values. The boundary conditions are needed to set constraints for key parameters when performing modeling assessments. Understanding the key parametric values for the GOM will facilitate locating successful offshore carbon capture utilization and storage (CCUS) projects in terms of plume size, CO 2 stored and, in the case of EOR, oil recovery. Importantly, this white paper focuses on both technical factors (geologic and engineering), but does not address economic, commercial, or stakeholder considerations. The report is organized into four sections and includes a review of the datasets used to define the parameter ranges, the results of a full-physics reservoir simulation, a summary of a reduced order modeling approach to evaluate the impact of the study parameters, and, finally, a discussion of the work that will occur during the next phase of the project.

02 PETROLEUM↗

SECARB-USA: A Sub-Basin Framework for Future CO 2 Infrastructure Development

Task 4 of the SECARB-USA Project is designed to evaluate the regional needs and challenges for the development of a safe and environmentally sound CO 2 transport infrastructure. This infrastructure would transport CO 2 capture from power generating plants and/or industrial sources and distribute it to oil fields for associated storage in EOR operations, saline storage, and/or other suitable storage sites. The objective of this report on Sub-Basin Prospective Areas (Deliverable 4.1.a), is to provide the framework for understanding how regional infrastructure development could occur. The sub-basin prospective areas, in conjunction with the locations of CO 2 sources and pipeline infrastructure (for source-sink matching networks), form the basis for the analysis that will be performed in the Techno-Economic Analysis of Infrastructure Buildout Scenarios (Deliverable 4.1.b).

54 ENVIRONMENTAL SCIENCES↗

Southeast Regional CO 2 Utilization and Storage Acceleration Partnership (SECARB-USA): A Sub-Basin Framework for Future CO 2 Infrastructure Development (Task 4.1.a)

The “Southeast Regional CO 2 Utilization and Storage Acceleration Partnership” (SECARB-USA) project supports the U.S. Department of Energy (DOE) Office of Fossil Energy's (FE) mission to help the United States meet its need for secure, affordable, and environmentally sound fossil energy supplies by utilizing the advancements made since 2003 by the Regional Carbon Sequestration Partnership (RCSP) Initiative to continue to identify and address knowledge gaps. The SECARB-USA regional initiative encompasses the states of Alabama, Arkansas, Florida, Georgia, Louisiana, Mississippi, North Carolina, South Carolina, Tennessee, Virginia, and portions of Kentucky, Missouri, Oklahoma, Texas, and West Virginia as noted in Figure 1.1. The primary objective of the project is to identify and address regional onshore storage and transport challenges facing commercial deployment of carbon dioxide (CO 2 ) capture, utilization, and storage (CCUS) technologies.

42 ENGINEERING↗

SECARB-USA: Initial Inventory of Non-Technical Challenges to CCUS Deployment

The "Southeast Regional CO 2 Utilization and Storage Acceleration Partnership" (SECARB-USA) project supports the U.S. Department of Energy (DOE) Office of Fossil Energy's (FE) mission to help the United States meet its need for secure, affordable, and environmentally sound fossil energy supplies by utilizing the advancements made by the current Regional Carbon Sequestration Partnerships (RCSP) Initiative to continue to identify and address knowledge gaps.

54 ENVIRONMENTAL SCIENCES↗

Southeast Regional CO 2 Utilization and Storage Acceleration Partnership (SECARB-USA): Initial Inventory of Non-Technical Challenges to CCUS Deployment

The “Southeast Regional CO 2 Utilization and Storage Acceleration Partnership” (SECARBUSA) project supports the U.S. Department of Energy (DOE) Office of Fossil Energy's (FE) mission to help the United States meet its need for secure, affordable, and environmentally sound fossil energy supplies by utilizing the advancements made by the current Regional Carbon Sequestration Partnership (RCSP) Initiative to continue to identify and address knowledge gaps. The primary project objective is to identify and address regional onshore storage and transport challenges facing commercial deployment of carbon dioxide (CO 2 ) capture, utilization, and storage (CCUS) technologies. The Research Partners and a selected industry network of experienced CCUS project developers and operators will coordinate their capabilities to accelerate CCUS deployment by achieving four primary research objectives: 1) address key technical challenges; 2) facilitate data collection, sharing and analysis; 3) assess transportation and distribution infrastructure; and 4) promote regional technology transfer and dissemination of knowledge. The SECARB-USA Region includes the states of Alabama, Arkansas, Florida, Georgia, Louisiana, Mississippi, North Carolina, South Carolina, Tennessee, and Virginia and portions of Kentucky, Missouri, Oklahoma, Texas, and West Virginia. Under subtask 5.2: Non-Technical Challenges to CCUS Deployment, the Southern States Energy Board (SSEB) will define and identify An Inventory of Non-Technical Challenges to CCUS Deployment. As an initial step, SSEB organized an Industry and Non-Governmental Organization (NGO) Working Group comprised of knowledgeable market participants to assist in the development of an initial list of non-technical challenges to CCUS development.

42 ENGINEERING↗

SECARB Semi-Annual Field Review Reports - Early Test

The Southern States Energy Board (SSEB) managed the overall Southeast Regional Carbon Sequestration Partnership (SECARB) Phase III project and The Bureau of Economic Geology (BEG), at the University of Texas at Austin, managed all activities associated with the Early Test field site near Cranfield, Mississippi (the Early Test or Cranfield Project). BEG was assisted in the management of site activities by Sandia Technologies (Sandia). BEG and Sandia implemented reporting procedures that included monthly and quarterly technical progress reports, as well as periodic reporting on key field activities. Subsequent sections of this report catalog the field activities and are organized in a semiannual chronology. The Cranfield Project was located approximately 12 miles east of Natchez, Mississippi. Denbury Onshore, LLC, began operating a commercial CO 2 flood of the field (using the subsurface injection of CO 2 for EOR) in June 2008. Carbon dioxide from the Jackson Dome, a natural source near Jackson, Mississippi, was delivered to the Cranfield oilfield via pipeline. Beginning in October 2008, the SECARB Early Test team characterized the surface and subsurface of the Cranfield site. During the field test CO 2 was injected into the lower Tuscaloosa Formation, a regionally extensive saline formation with the potential to hold millions of tons of CO 2 emissions. By January 2015, the team injected more than 11 million metric tons of CO 2 and monitored a total stored CO 2 mass of 5,326,975 metric tons. SECARB’s study operations occurred in four integrated research program areas within Cranfield field: (1) the High Volume Injection Test area (HiVIT); (2) the Detailed Area of Study (DAS); (3) the Geomechanical area; and (4) the near-surface observatory, also called the “P-site.” Carbon dioxide injection activities were conducted at the HiVIT and the DAS. Figure 1.1-1 provides a depiction of the DAS.

01 COAL, LIGNITE, AND PEAT↗

SECARB 2020 Semi-Annual Field Review Reports - Anthropogenic Test

The Southern States Energy Board (SSEB) managed the overall Southeast Regional Carbon Sequestration Partnership (SECARB) Phase III project and the Electric Power Research Institute (EPRI) managed all activities associated with the Anthropogenic Test site. Advanced Resources International, Inc. (ARI) assisted EPRI with the management of site activities. EPRI and ARI followed reporting procedures that included monthly and quarterly technical progress reports, as well as periodic reporting on key field activities. Subsequent sections of this report catalog the field activities and are organized in a semi-annual chronology. The SECARB Anthropogenic Test was the largest demonstration of a fully integrated, pulverized coal-fueled carbon capture and storage (CCS) project in the United States as of 2012 and supports a commercial prototype of CO 2 capture; transportation; subsurface storage; and monitoring, verification, and accounting (MVA); and assessment. The demonstration-scale, post-combustion CO 2 capture facility at Alabama Power Company’s Plant Barry diverted flue gas (25MW equivalent) from its Unit #5 coal burning facility and captured the CO 2 using Mitsubishi Heavy Industries (MHI) KM-CDRTM advanced amine technology. The captured CO2 was compressed at Plant Barry and transported by pipeline to the injection location southeast of Citronelle, Alabama. The Citronelle Project’s geologic storage and MVA sites were located on the flanks of the Citronelle Dome, approximately three miles southeast of the city of Citronelle. The injection zone, the Paluxy Formation, a saline formation that occurs at approximately 9,400 feet and overlies the oil production horizon of the Citronelle oilfield, presents a favorable injection reservoir in terms of areal extent and petrophysical characteristics. The confining zone, the basal shale of the overlying Washita-Fredericksburg Formation, is persistent throughout the Citronelle area and possesses the appropriate criteria to act as an effective CO 2 seal.

01 COAL, LIGNITE, AND PEAT↗

Trace gas exchanges and convective transports over the Amazonian rain forest

The NASA Amazon Boundary Layer Experiment (ABLE 2A) based in Manaus, Brazil, in July and August 1985, is used to examine meteorological processes responsible for the vertical and horizontal transport of biogenic and anthropogenic trace gases generated over the Amazon basin. Direct sampling of the surrounding environment of deep convective clouds shows marked changes in the vertical distribution of the lower and midtroposphere concentration of O3 and such surface-derived species as CO, CO2, and NO. Thermodynamic observations, together with two-dimensional cloud model simulations, confirm vertical transports within the convection and provide a basis for an estimation of the magnitude and efficiency of cloud upward and downward exchanges. A distinction is drawn between local changes due to convective updrafts and downdrafts and convective overturning as a net result of the storm processes. Marked variability is seen in trace gas concentrations along horizontal flight paths in the vicinity of the convection. Interpretation of simultaneously measured thermodynamic quantities and trace gas concentrations provide the information to infer the presence and direction of atmospheric transports and/or the presence of anthropogenic influences.

Garstang, Michael↗