APS-U Bellows/BPM Assembly Test in NSLS-II
We report on beam studies performed at NSLS-II to test the performance of the APS-U Bellows/BPM assembly.
Engineering topics
Publications and source records attributed to Hetzel, C..
We report on beam studies performed at NSLS-II to test the performance of the APS-U Bellows/BPM assembly.
The ability to effectively clean optical surfaces of carbon to restore performance without damage is of great importance for soft x-ray beamlines. There is currently a good deal of focus on prevention and cleaning through the use of simple oxygen introduction in the presence of beam. This technique is being both studied and applied effectively at other synchrotron facilities. This investigation focused on testing techniques without the presence of beam, to be applied in-situ for carbon removal. This investigation included oxygen plasma and ozone cleaning (both ozone generated by UV light and ozone generator).
Explore the source record for details and available documents.
The first eight insertion devices (IDs) at the NSLS-II were commissioned during the fall run of 2014. In this paper we discuss commissioning of the synchrotron radiation protection (SRP) system and beamline frontends (FE) for the respective IDs. We describe the diagnostics utilized if FE commissioning and a procedure that was used for the alignment of the photon beam from insertion devices in the beamline frontends. Then we discuss the current status of the SRP system and operation of the commissioned frontends.
The NSLS-II accelerators finished commissioning in the fall of 2014, with beamline commissioning underway. Part of the design for the NSLS-II is to operate in top off mode. The Top Off Safety System (TOSS) is presently being installed. In this report we discuss the Top Off Safety System design and implementation, along with the necessary tracking results and radiological calculations.