Enhancement of Industry Legacy Probabilistic Risk Assessment Methods and Tools

Probabilistic risk assessments (PRAs) are integral to nuclear power plant (NPP) operations, having tremendously benefitted the safety of the U.S. reactor fleet for decades. Insights obtained from the models have provided perspectives on a variety of applications, both at the plant and for the regulator. While these models are very useful, they are now being asked to represent and analyze aspects of the plant that were never envisioned by the initial PRA practitioners. Furthermore, heightened demands on the PRA models have led to increased computing power requirements. Additionally, as the complexity of the PRA models increased, the difficulty experienced by non-PRA experts in trying to understand these models, grasp the insights they provide, and effectively use that information has become problematic. The need for research to address key issues regarding PRA tools and methods has never been greater. Although the nuclear power industry has largely been well-served by these tools and methods, the underlying science is dated, remaining mostly unchanged for over two decades. Three areas were identified as most beneficial to address to maintain and improve the usefulness of the current practice legacy PRA tools: improvement in quantification speed, increased ability to efficiently model multi-hazard models, and improvement in modeling human action dependency in PRA. This report provides the outcomes from the FY2021 research into these three areas, identifying potential technical gaps and solutions, and charting the next steps forward to address current PRA challenges.

42 ENGINEERING↗

Probabilistic Risk Assessment Research Needs and Activities

Probabilistic risk assessments (PRAs) have benefitted the safe operation of the U.S. reactor fleet over many decades. Risk insights from these PRAs have provided information from many different perspectives, from what is most important to maintain at a facility to a better understanding of how to address new information regarding safety issues. The methods and tools that have supported the creation and enhancement of PRA models were established through multiple decades of research, from the 1970s starting with the WASH-1400 Reactor Safety Study through comprehensive plant-specific models in use today. Because PRA models are being used to support such a diverse array of plant decisions, they are now being applied to analyze an increasing number and diverse set of aspects of the plant, which are well beyond the initial efforts envisioned in the 1970s. These demands on PRA methods and tools have led to challenges in terms of further expansion of the use of PRA and raised the potential for future research into how to address these challenges to ensure continued nuclear safety. In addition to the PRA needs, the domain of computer science has led to advances in computational approaches that may serve to help nuclear power plant PRA applications. These newer technologies have great potential to improve the effectiveness and economics of PRA and are being considered for exploration of potential benefits to the PRA and nuclear-power communities.

97 MATHEMATICS AND COMPUTING↗

STOCHASTIC OPTIMIZATION FOR LONG TERM CAPITAL STRUCTURES, SYSTEMS, AND COMPONENTS REFURBISHMENT AND REPLACEMENT

As commercial nuclear power plants (NPPs) pursue extended plant operations in the form of Second License Renewals (SLRs), opportunities exist for these plants to provide capital investments to ensure long-term, safe, and economic performance. Several utilities have already announced their intention to pursue extended operations for one or more of their NPPs via SLR2. The goal of this research is to develop a riskinformed approach to evaluate and prioritize plant capital investments made in preparation for, and during the period of, extended plant operations to support decisions in NPP operations. In order to prioritize project selection via a riskinformed approach we developed a single decision-making tool that integrates safety/reliability, cost, and stochastic optimization models to provide users with data analysis capabilities to more cost effectively manage plant assets. Both stochastic analysis methods—such as Monte Carlo-based sampling strategies—and multi-stage stochastic optimization strategies are employed to provide priority lists to decisionmakers in support of risk-informed decisions. We applied the proposed method to a trial application of projected replacement/refurbishment expenditures for plant capital assets (i.e., Structures, Systems, and Components [SSCs]). The objective is to optimize the SSC replacement/refurbishment schedule in terms of economic constraints, data uncertainties, and SSC reliability data, as well to generate a priority list for maximizing returns on investment.

42 ENGINEERING↗

Stochastic Analysis for Long Term Capital Structures, Systems, and Components Refurbishment and Replacement

As commercial Nuclear Power Plants (NPPs) pursue extended plant operation in the form of Second License Renewal (SLR), opportunities exist for these plants to provide capital investments to ensure long-term safe and economic performance. At the current time, several utilities have announced an intention to pursue extended operation for one or more of their NPPs via SLR . The goal of this research is to develop a risk-informed approach to evaluate and prioritize plant capital investments made in preparation for, and during the period of, extended plant operations to support decisions for NPP operations. Since the capital investments are influenced by various factors, such as markets, safety and regulatory, the decision-making process of NPP operations should take into account relevant factors for balancing risks, costs and profits. The traditional method of capital budgeting is based on the priority list of candidate projects using economic measures such as benefit-investment ratio, net present value (NPV) and internal rate of return. In the literatures, the problem of capital budgeting or the variant can be represented by an appropriate knapsack problem. The knapsack approach to capital budgeting takes as input as investment, along with the cost and profit of each project. The objective of capital budgeting is to find the combination of the binary decisions for every investment such that the overall profit is as large as possible. The output is a collection of projects to be carried out, and we refer this selected collection of projects as a project portfolio. One limitation of traditional optimization models for capital budgeting is that they do not account for risk/uncertainty in profit and cost streams associated with individual projects, they do not account for risk in resource availability in future years [1,2,3]. Projects can incur cost over-runs, especially when projects are large, performed infrequently, and when there is risk regarding technical viability, external contractors, and/or suppliers of requisite parts and materials. Occasionally, projects are performed ahead of schedule and with cost savings. Planned budgets for capital improvements can be cut and key personnel may be lost. Or, there may be surprise windfalls in budgets for maintenance activities due to decreased costs for “unplanned” maintenance. In these cases, how should we resolve capital budgeting when we have risk forecasts for costs, profits and budgets? One approach we proposed in this summary is to re-solve the optimization models based on assumed statistical distributions of given parameters. If these distributions were not available, a two-stage stochastic optimization approach can be used to provide priority lists to decision-makers to support better risk-informed decisions [4, 5]. In this summary, we will only focus on the first approach.

42 ENGINEERING↗