ACTPol: On-Sky Performance and Characterization

ACTPol is the polarization-sensitive receiver on the Atacama Cosmology Telescope. ACTPol enables sensitive millimeter wavelength measurements of the temperature and polarization anisotropies of the Cosmic Microwave Background (CMB) at arcminute angular scales. These measurements are designed to explore the process of cosmic structure formation, constrain or determine the sum of the neutrino masses, probe dark energy, and provide a foundation for a host of other cosmological tests. We present an overview of the first season of ACTPol observations focusing on the optimization and calibration of the first detector array as well as detailing the on-sky performance.

Cosmic Microwave Background↗

Accelerator/Experiment Operations - FY 2013

The low-energy and high-energy neutrino beams, the SeaQuest beam, and the Test Beam in the Meson area were shutoff on May 1, 2012 to begin work on the accelerator upgrades for NOvA (ANU), and for overall accelerator system maintenance. The shutdown of the Main Injector ended July 30, 2013, with the startup of the Accelerator systems for commissioning. Vacuum issues in the Main Injector delayed Commissioning and neutrino running until September.

Dixon, R.↗

Proposal for an Accelerator R&D User Facility at Fermilab's Advanced Superconducting Test Accelerator (ASTA)

Fermilab is the nation’s particle physics laboratory, supported by the DOE Office of High Energy Physics (OHEP). Fermilab is a world leader in accelerators, with a demonstrated track-record— spanning four decades—of excellence in accelerator science and technology. We describe the significant opportunity to complete, in a highly leveraged manner, a unique accelerator research facility that supports the broad strategic goals in accelerator science and technology within the OHEP. While the US accelerator-based HEP program is oriented toward the Intensity Frontier, which requires modern superconducting linear accelerators and advanced highintensity storage rings, there are no accelerator test facilities that support the accelerator science of the Intensity Frontier. Further, nearly all proposed future accelerators for Discovery Science will rely on superconducting radiofrequency (SRF) acceleration, yet there are no dedicated test facilities to study SRF capabilities for beam acceleration and manipulation in prototypic conditions. Finally, there are a wide range of experiments and research programs beyond particle physics that require the unique beam parameters that will only be available at Fermilab’s Advanced Superconducting Test Accelerator (ASTA). To address these needs we submit this proposal for an Accelerator R&D User Facility at ASTA. The ASTA program is based on the capability provided by an SRF linac (which provides electron beams from 50 MeV to nearly 1 GeV) and a small storage ring (with the ability to store either electrons or protons) to enable a broad range of beam-based experiments to study fundamental limitations to beam intensity and to develop transformative approaches to particle-beam generation, acceleration and manipulation which cannot be done elsewhere. It will also establish a unique resource for R&D towards Energy Frontier facilities and a test-bed for SRF accelerators and high brightness beam applications in support of the OHEP mission of Accelerator Stewardship.

43 PARTICLE ACCELERATORS↗

Issues and R&D Required for the Intensity Frontier Accelerators

Operation, upgrade and development of accelerators for Intensity Frontier face formidable challenges in order to satisfy both the near-term and long-term Particle Physics program. Here we discuss key issues and R&D required for the Intensity Frontier accelerators.

43 PARTICLE ACCELERATORS↗

Accelerator/Experiment Operations - FY 2012

This Technical Memorandum (TM) summarizes the Fermilab accelerator and accelerator experiment operations for FY 2012. It is one of a series of annual publications intended to gather information in one place. In this case, the information concerns the FY 2012 MINOS and MINERνA experiments using the Main Injector Neutrino Beam (NuMI), the MiniBooNE experiment running in the Booster Neutrino Beam (BNB), and the Meson Test Beam (MTest) activities in the 120 GeV external Switchyard beam (SY120). Each section was prepared by the relevant authors, and was somewhat edited for inclusion in this summary.

43 PARTICLE ACCELERATORS↗

Accelerator/Experiment Operations - FY 2011

This Technical Memorandum (TM) summarizes the Fermilab accelerator and accelerator experiment operations for FY 2011. It is one of a series of annual publications intended to gather information in one place. In this case, the information concerns the FY 2011 Run II at the Tevatron Collider, the MINOS and MINERvA experiments using the Main Injector Neutrino Beam (NuMI), the MiniBooNE experiment running in the Booster Neutrino Beam (BNB), and the Meson Test Beam (MTest) activities in the 120 GeV external Switchyard beam (SY120).

43 PARTICLE ACCELERATORS↗

Accelerator and Target Technology for Accelerator Driven Transmutation and Energy Production

Since the early 1990’s, accelerator driven systems (ADS) – subcritical assemblies driven by high power proton accelerators through a spallation target which is neutronically coupled to the core – have been proposed for addressing certain missions in advanced nuclear fuel cycles. Institutes throughout the world have conducted numerous programs evaluating the role of ADS in nuclear waste transmutation and energy production. In 1995, the National Research Council (NRC) issued a report on transmutation technologies, which included an evaluation of one ADS concept that was under study at that time: a large-scale system that proposed using a ~100-MW accelerator to drive a thermal, molten salt subcritical core. The NRC recognized the numerous complexities associated with the system, including the fact that, at that time, much of the high-power accelerator technology required for that ADS system had yet to be demonstrated. Consequently, the NRC report did not look favorably upon ADS. In 1999 the US Congress directed the DOE to evaluate Accelerator Transmutation of Waste (ATW) concepts and prepare a “roadmap” to develop the technology. This roadmap identified the technical issues to be resolved, assessed the impact of ATW on high-level waste disposition, and estimated the scale and cost of deploying ATW to close the fuel cycle. It also recommended that Congress fund a $281M six-year program of trade studies and R&D on key technology issues that would support a future decision on technology demonstration. From 2000 to 2002, the DOE sponsored the Advanced Accelerator Applications (AAA) program to investigate the use of ADS in “closed” nuclear fuel cycles. In 2003 the AAA program transitioned into the Advanced Fuel Cycle Initiative, and DOE-sponsored ADS research ceased, except for the continuation on a few international collaborative efforts. A number of factors contributed to this decision, primarily the small expected growth in commercial nuclear power which “negated” the principal driver for ATW/AAA, i.e., destruction of transuranics and problematic fission products assuming that there would be essentially no new construction of commercial reactors. Outside of the USA, research into ADS for both transmutation and power generation has not only continued but accelerated. In 2001 the European Technical Working Group evaluated the state of ADS technologies and recommended the construction of an experimental ADS. In 2002 an expert group, convened by the Organization for Economic Cooperation and Development’s Nuclear Energy Agency (OECD/NEA), authored a comprehensive report entitled Accelerator Driven Systems (ADS) and Fast Reactors in Advanced Nuclear Fuel Cycles. In it, they conclude, “On the whole, the development status of accelerators is well advanced, and beam powers of up to 10 MW for cyclotrons and 100 MW for linacs now appear to be feasible. However, further development is required with respect to the beam losses and especially the beam trips to avoid fast temperature and mechanical stress transients in the reactor.” Technology demonstration is now gaining momentum with the Belgian government’s announcement of its intention to construct MYRRHA, an 85-MW prototype ADS at the Belgian Nuclear Research Centre, SCK•CEN. The government has committed to finance 40% of the construction cost, and is expending €60M over the next five years to advance the design in preparation for a construction start in 2015. In addition, there are recent indications the Chinese and Indian governments are considering construction of prototype ADS facilities of similar scale. ADS technology development programs exist in Europe, Japan, South Korea, India, China and Russia which are focused on both waste transmutation and power generation.

43 PARTICLE ACCELERATORS↗

Development of a 100 mJ, 5 Hz, flashlamp-pumped, Cr,Tm:YAG coherent lidar transmitter

A contract to develop a 100 mJ, 5 Hz, flashlamp-pumped Cr,Tm:YAG coherent lidar transmitter has been awarded to Coherent Technologies, Inc. (CTI). The lidar transmitter will operate at an eyesafe wavelength of 2.01 microns. The development complements work being performed under an SBIR Phase II with Electro-Optics Technology (EOT). EOT is developing continuous wave, low and medium power Tm:YAG oscillators of a unique design. One of the low power oscillators will be used as the injection seeder/local oscillator in the CIT lidar transmitter. The lidar transmitter will require the addition of a receiver section. Once completed, the lidar will be used in atmospheric performance studies, allowing comparison with that of the more mature CO2 lidar technology. The focus of current research and plans for next year are presented.