Project Mercury: the Program and Its Objectives

Project Mercury is reviewed in the light of experience gained thus far in the technical implementation of this Nation's initial program for manned orbital flight. Initial guidelines formulated for the Mercury program are reviewed, together with some of the technical considerations that have influenced the design of the capsule and the operational plan for the booster-capsule vehicle. The role of the astronaut in the Mercury program is discussed, and some observations are made concerning the impact of the Mercury program on future manned space ventures.

Donlan, C. J.

Progress Report on Project Mercury

Progress on Project Mercury, program for manned orbital space flight, is briefly reviewed. The original aims and concepts of the project are recounted. Various types of launch apparatus are mentioned along with safety factors.

Donlan, C. J.

The Space Shuttle System description, operations, and payload capabilities

General characteristics of the Space Shuttle System are presented with overall capabilities and operating characteristics detailed. Mission operations and performance baselines are presented. The relationships between orbital parameters and payload capabilities are highlighted. On-orbit scientific and applications operating modes are briefly reviewed and methods of achieving a versatile payloads program using standard payload carriers are discussed.

Heberlig, J. C.

The management approach to the NASA space station definition studies at the Manned Spacecraft Center

The overall management approach to the NASA Phase B definition studies for space stations, which were initiated in September 1969 and completed in July 1972, is reviewed with particular emphasis placed on the management approach used by the Manned Spacecraft Center. The internal working organizations of the Manned Spacecraft Center and its prime contractor, North American Rockwell, are delineated along with the interfacing techniques used for the joint Government and industry study. Working interfaces with other NASA centers, industry, and Government agencies are briefly highlighted. The controlling documentation for the study (such as guidelines and constraints, bibliography, and key personnel) is reviewed. The historical background and content of the experiment program prepared for use in this Phase B study are outlined and management concepts that may be considered for future programs are proposed.

Heberlig, J. C.

Space station design

Space station design, discussing existing technology base for earth orbital operations program implementation