Engineering Papers⌕ Search

Engineering topics

Hayne, George S.

Publications and source records attributed to Hayne, George S..

TOPEX Radar Altimeter Engineering Assessment Report Final Update-Side B Turn-On to End-of-Mission on October 9, 2005

This is the thirteenth and final report in a series of TOPEX Radar Altimeter Engineering Assessment Reports. The initial TOPEX Radar Altimeter Engineering Assessment Report, in February 1994, presented performance results for the NASA Radar Altimeter on the TOPEX/POSEIDON spacecraft, from its launch in August 1992 to February 1994. Since the time of that initial report and prior to this report, there have been eleven interim supplemental Engineering Assessment Reports, issued in March 1995, May 1996, March 1997, June 1998, August 1999, September 2000, June 2001, March 2002, May 2003, April 2004 and September 2005. The sixth supplement in September 2000 was the first assessment report that addressed Side B performance, and presented the altimeter performance from Side B turn-on until the end of calendar year 1999. This report extends the performance assessment of Side B to the final collection of data on October 9, 2005, and includes the performance assessment of Jason-1, the TOPEX follow-on mission, launched on December 7, 2001. This report provides some comparisons of Side A and Side B performance.

Lockwood, Dennis W.↗

TOPEX NASA Altimeter Operations Handbook, September 1992

This operations handbook identifies the commands for the NASA radar altimeter for the TOPEX/Poseidon spacecraft, defines the functions of these commands, and provides supplemental reference material for use by the altimeter operations personnel. The main emphasis of this document is placed on command types, command definitions, command sequences, and operational constraints. Additional document sections describe uploadable altimeter operating parameters, the telemetry stream data contents (for both the science and the engineering data), the Missions Operations System displays, and the spacecraft and altimeter health monitors.

Hancock, David W., III↗

GFO Altimeter Engineering Assessment Report

The U.S. Navy's Geosat Follow-On (GFO) Mission, launched on February 20, 1998, is one of a series of altimetric satellites which include Seasat, Geosat, ERS-1, and TOPEX/POSEIDON (T/P). The purpose of this report is to document the GFO altimeter performance determined from the analyses and results performed by NASA's GSFC and Wallops altimeter, calibration team. It is the second of an anticipated series of NASA's GSFC and Wallops GFO performance documents, each of which will update assessment results. This report covers the performance from instrument acceptance by the Navy on November 29, 2000, to the end of Cycle 20 on November 21, 2001. Data derived from GFO will lead to improvements in the knowledge of ocean circulation, ice sheet topography, and climate change. In order to capture the maximum amount of information from the GFO data, accurate altimeter calibrations are required for the civilian data set which NOAA will produce. Wallops Flight Facility has provided similar products for the Geosat and T/P missions and is doing the same for GFO.

Lockwood, Dennis W.↗

GEOSAT Follow-on (GFO) Altimeter Document Series: GFO Altimeter Engineering Assessment Report, Version 1 - Volume 3

The U.S. Navy's Geosat Follow-On (GFO) Mission, launched on February 20, 1998, is one of a series of altimetric satellites which include Seasat, Geosat, ERS-1, and TOPEX/POSEIDON (T/P). The purpose of this report is to document the GFO altimeter performance determined from the analyses and results performed by NASA's GSFC and Wallops altimeter, calibration team. It is the second of an anticipated series of NASA's GSFC and Wallops GFO performance documents, each of which will update assessment results. This report covers the performance from instrument acceptance by the Navy on November 29, 2000, to the end of Cycle 20 on November 21, 2001. Data derived from GFO will lead to improvements in the knowledge of ocean circulation, ice sheet topography, and climate change. In order to capture the maximum amount of information from the GFO data, accurate altimeter calibrations are required for the civilian data set which NOAA will produce. Wallops Flight Facility has provided similar products for the Geosat and T/P missions and is doing the same for GFO.

Hancock, David W., III↗

GEOSAT Follow-on (GFO) Altimeter Document Series: GFO Altimeter Engineering Assessment Report: From Launch to Acceptance, 10 February 1998 to 29 November 2000 - Volume 1

The US Navy's Geosat Follow-On (GFO) Mission, launched on February 10, 1998, is the latest in a series of altimetric satellites which include Seasat, Geosat, ERS-1, and TOPEX/POSEIDON (T/P). The purpose of this report is to document the GFO altimeter performance determined from the analyses and results performed by the NASA/GSFC/Wallops altimeter calibration team. It is the first of an anticipated series of NASA/GSFC/Wallops' GFO performance documents, each of which will update assessment results. This report covers the performance from launch to instrument acceptance by the Navy on November 29, 2000. Data derived from GFO will lead to improvements in the knowledge of ocean circulation, ice sheet topography, and climate change. In order to capture the maximum amount of information from the GFO data, accurate altimeter calibrations are required for the civilian data set which NOAA will produce. Wallops Flight Facility has provided similar products for the Geosat and T/P missions and is doing the same for GFO.

Hancock, David W., III↗

Prelaunch performance of the NASA altimeter for the TOPEX/POSEIDON project

Validation of in-orbit performance has demonstrated the ability of satellite radar altimetry to measure mesoscale absolute dynamic sea surface topography and to measure the variation in the general circulation on the largest spatial scales. Measurements of basin scale mean circulation, however, have been corrupted by system inaccuracies. The TOPEX/POSEIDON radar altimeter satellite applies recent advances in remote sensing instrumentation to reduce long wavelength measurement errors to dramatically lower levels. The TOPEX altimeter measures the range to the ocean surface with 2-cm precision and accuracy through the use of both Ku- and C-band radars, a high pulse repetition frequency, an agile tracker, and absolute internal height calibration. Dual pulse bandwidths for both frequencies make it possible to quickly acquire the surface and begin tracking after crossing the land/ocean boundary. This paper presents the altimeter requirements and the elements of the altimeter design that have resulted in meeting these requirements. Prelaunch test data, based on the use of a Radar Altimeter System Evaluator to simulate the backscatter from the ocean surface, are presented to demonstrate that the TOPEX altimeter will meet these requirements and provide the data necessary to the understanding of basin scale mean circulation.

Marth, Paul C.↗

NASA radar altimeter for the Topex/Poseidon Project

The Topex/Poseidon Project is a joint U.S. and French mission to develop and operate an earth-orbiting satellite with sensors capable of making accurate measurements of sea level. The NASA Radar Altimeter (NRA), a fifth-generation U.S. altimeter, will provide the primary measurement for the Topex/Poseidon altimetric mission. This paper presents the requirements, altimeter fundamentals, design description, integration and test program, primary elements of ground processing, and assessment for the dual-frequency NRA.

Zieger, Alfred R.↗

Waveform analysis for Geosat day 96

A detailed model waveform function has been least-squares-fitted to 10-second averages of waveform sampler data from selected over-ocean portions of day 96 of the Geosat mission. The results confirm that the height corrections already applied in the routine Geosat data processing are generally good to well within 10 centimeters. Additional height corrections are provided that can refine height estimates to within the several-centimeter level.

Hayne, George S.↗