Engineering PapersSearch

Engineering topics

Hastings, L.

Publications and source records attributed to Hastings, L..

Large-Scale Liquid Hydrogen Testing of Variable Density Multilayer Insulation with a Foam Substrate

The multipurpose hydrogen test bed (MHTB), with an 18-cu m liquid hydrogen tank, was used to evaluate a combination foam/multilayer combination insulation (MLI) concept. The foam element (Isofoam SS-1171) insulates during ground hold/ascent flight, and allowed a dry nitrogen purge as opposed to the more complex/heavy helium purge subsystem normally required. The 45-layer MLI was designed for an on-orbit storage period of 45 days. Unique WI features include a variable layer density, larger but fewer double-aluminized Mylar perforations for ascent to orbit venting, and a commercially established roll-wrap installation process that reduced assembly man-hours and resulted in a roust, virtually seamless MLI. Insulation performance was measured during three test series. The spray-on foam insulation (SOFI) successfully prevented purge gas liquefaction within the MLI and resulted in the expected ground hold heat leak of 63 W/sq m. The orbit hold tests resulted in heat leaks of 0.085 and 0.22 W/sq m with warm boundary temperatures of 164 and 305 K, respectively. Compared to the best previously measured performance with a traditional MLI system, a 41-percent heat leak reduction with 25 fewer MLI layers was achieved. The MHTB MLI heat leak is half that calculated for a constant layer density MLI.

Martin, J. J.

Terrestrial Applications of Zero Boil-Off Cryogen Storage

Storing cryogenic propellants with zero boil off (ZBO) using a combination of active (cryocoolers) and passive technologies has recently received a great deal of attention for applications such as future long-term space missions. This paper will examine a variety of potential near-term terrestrial applications for ZBO and, where appropriate, provide a rough order of magnitude cost benefit of implementing ZBO technology. NASA's Space Shuttle power system uses supercritical propellant tanks, which are filled several days before launch. If the launch does not occur within 48-96 hours, the tanks must be drained and refilled, further delaying the launch. By implementing ZBO, boil off could be eliminated and pad hold time extended. At the launch site, vented liquid hydrogen (LH2) storage dewars lose 1200-1600 gal/day through boiloff. Implementing ZBO would eliminate this, saving $300,000-$400,000 per year. Similarly, overland trucking of LH2 from the supplier to the launch site via roadable dewars results in a cryogen loss of ten percent per tanker (1500 gal/tanker). Providing a cryocooler on board the rig would prevent this loss. Previous work investigating variable density insulation found that a 50% reduction in evaporation from a 6000 gallon dewar would save $5000 per year. For a 20 year dewar lifetime, the payback period would be less than two years. Similar benefits could be realized at other storage facilities across the nation. Within the superconductivity community, there is skepticism about using coolers, based upon reliability concerns. By providing a cooler on the dewar, lifetime could be extended while retaining fail-safe capability. If the cooler failed, it would merely lower the storage life of the dewar.

Salerno, L. J.

OTV fluid mangement systems

Design, performance, and technology issues associated with reduced gravity propellant management for orbital transfer vehicles (OTV's) are reviewed. The in-space cryogenic management state-of-technology significantly affects the overall confidence level associated with a resupply mission and propulsion performance. Cryogen resupply sequences, timelines, controls, and associated crew involvement are all affected by the technology state. Additionally, OTV propellant tankage configurations, tankage thermodynamic conditions, acceleration environment, propulsion interfaces, and instrumentation are significant factors. Basic propellant transfer phases examined that drive orbital servicing requirements include: (1) tankage preconditioning; (2) tankage chilldown; and (3) propellant fill. Propellant management support of the OTV propulsion phases includes engine restart requirements and orbital coast between engine burns. Technology activities in support of identified technology issues are reviewed.

Hastings, L.