Engineering PapersSearch

Engineering topics

Hall, C. F.

Publications and source records attributed to Hall, C. F..

At least 19 records

The Pioneer Venus Missions

Two spacecraft with scientific instruments, a Multiprobe and an Orbiter, were sent to Venus by the USA in 1978 and successfully performed a series of measurements of the Venusian environment, in situ from the probes and remotely from the Orbiter. The paper discusses the scientific objectives of the missions, describes the spacecraft and trajectories, presents the performance of the spacecraft and instruments, and summarizes the scientific findings. The results indicate an excess of primordial argon at Venus; four distinct cloud layers were observed; four widely separated sites in both daylight and night time show almost no differences in atmospheric temperature and pressure below about 50 km altitude; winds up to 200 m/sec were observed at high altitudes; large plateaus were identified on the surface.

Hall, C. F.

The Pioneer Venus program

Mission timetables, spacecraft, scientific objectives, and payloads of the two mission, Orbiter and Multiprobe, planned for launch and encounter with Venus during the 1978 Venus mission opportunity are described. Basically, the Orbiter mission has the goal of global mapping of the clouds, atmosphere and ionosphere of Venus by remote sensing and radio occultation, global studies by in situ measurements of the upper atmosphere and ionosphere and solar wind-ionosphere interaction region, and determination of gravitational field harmonics from perturbations of the spacecraft orbit. The Multiprobe mission will study the nature and composition of the clouds, the structure of the atmosphere, the circulation pattern, and the characteristics of the planetary environmental interaction with the solar wind.

Colin, L.

The journey to Jupiter

The Pioneer missions to Jupiter are reviewed, and the observations made by the two probes are discussed. The spacecraft are described along with their launches, instrument packages, and trajectories. The major results of the micrometeorite, plasma, magnetic-field, and charged-particle experiments are summarized. The structure of Jupiter's magnetosphere is illustrated, spectroscopic and photometric observations by the Pioneers are discussed, and measurements of the Jovian atmosphere and gravitational field are examined. The measured masses and densities of the Galilean satellites are given, and future prospects for the Pioneer spacecraft are noted, including the possibility that Pioneer 10 may still be in contact with earth when it crosses the boundary between the solar system and interstellar space.

Hall, C. F.

The pioneer projects: Economical exploration of the solar system

The interplanetary Pioneer missions are reviewed in terms of management implications and cost control. The responsibilities, organizational structure, and management practices of the Pioneer Projects are presented. The lines of authority and areas of responsibility of the principal organizational elements supporting the Pioneer missions are identified, and the methods employed for maintaining effective and timely interactions among these elements are indicated. The technical and administrative functions of the various organizational elements of the Pioneer Project Office at Ames Research Center are described in terms of their management responsibilities and interactions with other elements of the Project Office and with external organizations having Pioneer Project responsibilities. The management and control of activities prior to and during the hardware procurement phase are described to indicate the basis for obtaining visibility of the technical progress, utilization of resources, and cost performance of the contractors and other institutions supporting the Pioneer projects.

Spahr, J. R.

The Pioneer Projects - Economical exploration of the solar system

The interplanetary Pioneer missions are reviewed in terms of management implications and cost control. The responsibilities, organizational structure, and management practices of the Pioneer Projects are presented. The lines of authority and areas of responsibility of the principal organizational elements supporting the Pioneer missions are identified, and the methods employed for maintaining effective and timely interactions among these elements are indicated. The technical and administrative functions of various organizational elements of the project are described. The management and control of activities prior to and during the hardware procurement phase are described to indicate the basis for obtaining visibility of the technical progress, utilization of resources, and cost performance of the contractors and other institutions supporting the Pioneer projects.

Spahr, J. R.

Pioneer 10 and Pioneer 11

On December 3, 1974, Pioneer 11 passed the planet Jupiter at a distance of 42,000 km. The spacecraft is now headed for an encounter with the planet Saturn in September 1979. The prime scientific objectives of the Pioneer 10 and Pioneer 11 missions are discussed along with the spacecraft payload, aspects of spacecraft design, the spacecraft power supply, and details regarding the spacecraft trajectory during the approach to Jupiter.

Hall, C. F.

Pioneer missions to Jupiter

The Pioneer 10 mission to Jupiter is described. Included are a discussion of the scientific objectives of the mission and a summary of the scientific findings related to the Asteroid Belt and Jupiter. The spacecraft and instruments are described and the effects of the Jupiter environment on their performance is discussed. The Pioneer 10 trajectory is described as well as the post-Jupiter trajectory for Pioneer 11.

Hall, C. F.

Pioneer 10/11 spacecraft and missions to Jupiter

The Pioneer 10/11 spacecraft and scientific instruments are described. The Pioneer 10/11 trajectories are described, mission objectives are discussed, and a summary of scientific findings is presented. Results obtained during the traverse of the Asteroid Belt show that the particle concentration is less than had been expected and does not present an appreciable hazard to spacecraft passing through the Belt. The results from six scientific instruments that measured the particle and field phenomena within the Jupiter radiation belt present a consistent picture which, in general, is an environment more severe than normal previous predictions based on earth observations.

Hall, C. F.

Pioneer 10

On Dec. 4, 1973, after 21 months in flight, Pioneer 10 passed by Jupiter at a distance within 130,000 km of its cloud tops. During the month before and after, instrumentation on the spacecraft made a number of scientific measurements of the Jupiter environment, thus completing one of three scientific objectives of the mission. Previously, Pioneer 10 had explored the asteroid belt and had completed the second scientific objective by determining that the belt did not present a hazard to spacecraft passing through it. The third objective, the exploration of interplanetary phenomena, started with the launch of Pioneer 10 and will not be completed until 1977 when the spacecraft nears the orbit of Uranus and the signal from the spacecraft becomes too weak to be heard at ground receivers.

Hall, C. F.

Pioneer missions to Jupiter

The Pioneer 10 mission to Jupiter is described. Included are a discussion of the scientific objectives of the mission and a summary of the scientific findings related to the Asteroid Belt and Jupiter. The spacecraft and instruments are described and the effects of the Jupiter environment on their performance is discussed. The Pioneer 10 trajectory is described as well as the post-Jupiter trajectory for Pioneer 11.

Hall, C. F.

Pioneer project - 1965-1970

Pioneer spacecraft flight missions, discussing interplanetary, solar-earth and deep space observations

Dickerson, L. W.

The Pioneer mission to Jupiter.

Pioneer F/G mission to Jupiter by NASA for exploring interplanetary medium, asteroid belt, planet and environment

Hall, C. F.