The Console in A Briefcase: An Approach to Remote Space Operations

The CIAB (Console in a Briefcase) is conceived as an ISS (International Space Station) Payload Operations remote console that would run via an Internet connection, consisting of components (primarily a laptop PC) that fit into a briefcase, and intended for use from home in an 'on call' scenario. The primary purpose of the CIAB project is to verify that the technology and tools exist to support remote-access payload operations for the International Space Station (ISS) and to build, test, and demonstrate a prototype system. The project can potentially provide cost savings and increased morale to the space operations community by reducing demands on staff. Also, the CIAB project provides a vehicle for examining innovative concepts pertaining to Mission Planning software tools that have potential benefits beyond just the immediate needs of remote access. To date we have implemented and tested the basic capability. Current research is focused on reducing bandwidth demands via the adoption of innovative software solutions. Research into current Internet connectivity and bandwidth is also being pursued.

Heaton, Andy F.

Space Ops 2002: Bringing Space Operations into the 21st Century. Track 3: Operations, Mission Planning and Control. 2nd Generation Reusable Launch Vehicle-Concepts for Flight Operations

With the successful implementation of the International Space Station (ISS), the National Aeronautics and Space Administration (NASA) enters a new era of opportunity for scientific research. The ISS provides a working laboratory in space, with tremendous capabilities for scientific research. Utilization of these capabilities requires a launch system capable of routinely transporting crew and logistics to/from the ISS, as well as supporting ISS assembly and maintenance tasks. The Space Shuttle serves as NASA's launch system for performing these functions. The Space Shuttle also serves as NASA's launch system for supporting other science and servicing missions that require a human presence in space. The Space Shuttle provides proof that reusable launch vehicles are technically and physically implementable. However, a couple of problems faced by NASA are the prohibitive cost of operating and maintaining the Space Shuttle and its relative inability to support high launch rates. The 2nd Generation Reusable Launch Vehicle (2nd Gen RLV) is NASA's solution to this problem. The 2nd Gen RLV will provide a robust launch system with increased safety, improved reliability and performance, and less cost. The improved performance and reduced costs of the 2nd Gen RLV will free up resources currently spent on launch services. These resource savings can then be applied to scientific research, which in turn can be supported by the higher launch rate capability of the 2nd Gen RLV. The result is a win - win situation for science and NASA. While meeting NASA's needs, the 2nd Gen RLV also provides the United States aerospace industry with a commercially viable launch capability. One of the keys to achieving the goals of the 2nd Gen RLV is to develop and implement new technologies and processes in the area of flight operations. NASA's experience in operating the Space Shuttle and the ISS has brought to light several areas where automation can be used to augment or eliminate functions performed by crew and ground controllers. This experience has also identified the need for new approaches to staffing and training for both crew and ground controllers. This paper provides a brief overview of the mission capabilities provided by the 2nd Gen RLV, a description of NASA's approach to developing the 2nd Gen RLV, a discussion of operations concepts, and a list of challenges to implementing those concepts.

Hagopian, Jeff

A Hybrid Cadre Concept for International Space Station (ISS) Operations

The International Space Station (ISS) is a continuously operating on-orbit facility, with a ten to fifteen year lifetime. The staffing and rotation concepts defined and implemented for the ISS program must take into account the unique aspects associated with long duration mission operations. Innovative approaches to mission design and operations support must be developed and explored which address these unique aspects. Previous National Aeronautics and Space Administration (NASA) man-based space programs, with the exception of Skylab, dealt primarily with short duration missions with some amount of down time between missions; e.g., Shuttle, Spacelab, and Spacehab programs. The ISS Program on the other hand requires continuous support, with no down time between missions. ISS operations start with the first element launch and continue through the end of the program. It is this key difference between short and long duration missions that needs to be addressed by the participants in the ISS Program in effectively and efficiently staffing the positions responsible for mission design and operations. The primary drivers considered in the development of staffing and rotation concepts for the ISS Program are budget and responsiveness to change. However, the long duration aspects of the program necessitate that personal and social aspects also be considered when defining staffing concepts. To satisfy these needs, a Hybrid Cadre concept has been developed and implemented in the area of mission design and operations. The basic premise of the Hybrid Cadre concept is the definition of Increment-Independent and Increment-Dependent cadre personnel. This paper provides: definitions of the positions required to implement the concept, the rotation scheme that is applied to the individual positions, and a summary of the benefits and challenges associated with implementing the Hybrid Cadre concept.

Hagopian, Jeff

NASA/Mir Phase 1: A Lesson Learned in Long Duration Mission Planning and Operations

The NASA/Mir Phase I Program is a precursor to the assembly and operations of the International Space Station (ISS). The Phase I Program covers a four-year period and encompasses over ten shuttle flights to the Mir, culminating with the flight of STS-91 in June 1998. The Mir-Orbiting Station (Mir-OS) provides an excellent environment, both onboard and on the ground, for learning and studying the characteristics associated with crew-tended operations on long duration missions. By the end of the Phase I program, NASA astronauts will have accumulated over two years of continuous operations experience working and living onboard the Mir-OS. Ground controllers, working in Russia and at remote sites in the United States, will have gained valuable experience in the generation, maintenance, and coordination of the information and products required to support the long duration crew members onboard the Mir-OS. The experience gained by the crew and ground support personnel in the area of long duration mission operations has resulted in a number of factors that need to be considered in the definition and implementation of the processes and products for the ISS. While there are many areas in which experience has been gained, this paper focuses on the lessons learned regarding the level of detail and flexibility of crew timelines. Provided in this paper is an overview of the characteristics associated with long duration mission timeline development and execution, a summary of applicable lessons learned identified and documented through participation in the NASA/Mir Phase I Program, a detailed discussion of "Gross Timelines" as implementation which addresses the lessons learned. Also discussed are the challenges that must be overcome in getting the ISS program to recognize, evaluate, and learn from the crew and ground controller experience gained through participation in the NASA/Mir Phase I Program.

Hagopian, Jeff

Explicit and Implicit Resources: A Simplified Approach to User Requirements Modeling

The International Space Station (ISS) program is dependent on the concept of distributed planning, which places a large responsibility in the hands of the science users. The users assume the responsibility in submitting the operations scheduling requirements in the format required by the scheduling software. The concept of explicit and implicit resources, developed to facilitate the operations scheduling of ISS by non-scheduling experts, is presented. The proposed concepts are defined and examples of scheduling requirements, implemented using explicit and implicit resources, are described together with the requirements modeling and scheduler formatting functions. The software developed to support the implicit and explicit resources concept is discussed.

Hagopian, Jeff

Planning in the Continuous Operations Environment of the International Space Station

The continuous operation planning approach developed for the operations planning of the International Space Station (ISS) is reported on. The approach was designed to be a robust and cost-effective method. It separates ISS planning into two planning functions: long-range planning for a fixed length planning horizon which continually moves forward as ISS operations progress, and short-range planning which takes a small segment of the long-range plan and develops a detailed operations schedule. The continuous approach is compared with the incremental approach, the short and long-range planning functions are described, and the benefits and challenges of implementing a continuous operations planning approach for the ISS are summarized.

Maxwell, Theresa

Architecture for Payload Planning System (PPS) Software Distribution

The complex and diverse nature of the pay load operations to be performed on the Space Station requires a robust and flexible planning approach, and the proper software tools which tools to support that approach. To date, the planning software for most manned operations in space has been utilized in a centralized planning environment. Centralized planning is characterized by the following: performed by a small team of people, performed at a single location, and performed using single-user planning systems. This approach, while valid for short duration flights, is not conducive to the long duration and highly distributed payload operations environment of the Space Station. The Payload Planning System (PPS) is being designed specifically to support the planning needs of the large number of geographically distributed users of the Space Station. This paper problem provides a general description of the distributed planning architecture that PPS must support and describes the concepts proposed for making PPS available to the Space Station payload user community.

Howell, Eric

A distributed planning concept for Space Station payload operations

The complex and diverse nature of the payload operations to be performed on the Space Station requires a robust and flexible planning approach. The planning approach for Space Station payload operations must support the phased development of the Space Station, as well as the geographically distributed users of the Space Station. To date, the planning approach for manned operations in space has been one of centralized planning to the n-th degree of detail. This approach, while valid for short duration flights, incurs high operations costs and is not conducive to long duration Space Station operations. The Space Station payload operations planning concept must reduce operations costs, accommodate phased station development, support distributed users, and provide flexibility. One way to meet these objectives is to distribute the planning functions across a hierarchy of payload planning organizations based on their particular needs and expertise. This paper presents a planning concept which satisfies all phases of the development of the Space Station (manned Shuttle flights, unmanned Station operations, and permanent manned operations), and the migration from centralized to distributed planning functions. Identified in this paper are the payload planning functions which can be distributed and the process by which these functions are performed.

Hagopian, Jeff