AAM for FAA/NASA Research Roundtable
The presentation gives an overview of the AAM Project and the UAM Mission Office.
Engineering topics
Publications and source records attributed to Hackenberg, Davis L..
The presentation gives an overview of the AAM Project and the UAM Mission Office.
This presentation briefs the UAM Framework and Barriers, UAM Grand Challenge, the UAM Maturity Levels (UMLs) in relation to the Grand Challenge, and showed the NASA Initial Grand Challenge (IGC) OV-1.
No abstract available
This is a quick presentation on the UAM Research Visions which include the Commerical Operating Environment and the Grand Challenge.
No abstract available
This presentation describes the need to calculate projections for the demands and benefits of operating commercial unmanned aircraft within the NAS.
For many years, the concept of routinely flying unmanned aircraft systems (UAS) within the national airspace system (NAS) has been a long-term goal with numerous known and unknown technology and policy obstacles. Just within the last few years, the efforts and advancements from government, industry, and academia-sponsored research and development have greatly shortened the distance to the goal. The National Aeronautics and Space Administration (NASA) Aeronautics Research Mission Directorate (ARMD) has recognized that it is uniquely positioned to play a lead role in addressing the remaining UAS airspace integration (AI) challenges. To fully understand the magnitude and scope of these challenges, NASA ARMD initiated a study in 2015 to identify what would be needed to enable full integration of UAS for civil/commercial operations within the NAS by 2025. The desired outcome was a comprehensive analysis framework that ARMD could use to develop a research portfolio focused on retiring the remaining gaps and challenges standing in the way of full UAS integration. This document is a comprehensive assessment of UAS integration research to date.
UAS demand slides discuss the purpose, scope, and assumptions of the UAS Demand Forecast Study. It discusses some operational environments and market research study, this information is broad knowledge in the UAS community.
These presentations discuss the UAS in the NAS Project and how it is designed to eliminate technical and regulatory barriers currently affecting civil UAS flying.
These posters are graphic representations of the UAS program and where it fits into the ARMD technology scale.
This presentation is an overview of future emerging aviation markets.
UAS Integration in the NAS Project has: a) Developed Technical Challenges that are crucial to UAS integration, aligned with NASA's Strategic Plan and Thrusts, and support FAA standards development. b) Demonstrated rigorous project management processes through the execution of previous phases. c) Defined Partnership Plans. d) Established path to KDP-C. Request approval of Technical Challenges, execution of partnerships and plans, and execution of near-term FY17 activities. There is an increasing need to fly UAS in the NAS to perform missions of vital importance to National Security and Defense, Emergency Management, and Science. There is also an emerging need to enable commercial applications such as cargo transport (e.g. FedEx). Unencumbered NAS Access for Civil/Commercial UAS. Provide research findings, utilizing simulation and flight tests, to support the development and validation of DAA and C2 technologies necessary for integrating Unmanned Aircraft Systems into the National Airspace System.
This briefing was presented during the Test Site Kick Off Meeting to discuss the contract awards for Task 1 and Task 2. This briefing covered a high level overview for contract deliverables, Task 1 - UAS Traffic Management and Task 2, Live Virtual Constructive Distributed Environment.
Description and Update of NASA UAS in the NAS Project
This paper discusses the ground and flight operations aspects to the Pad Abort 1 launch. The paper details the processes used to plan all operations. The paper then discussions the difficulties of integration and testing, while detailing some of the lessons learned throughout the entire launch campaign. Flight operational aspects of the launc~ are covered in order to provide the listener with the full suite of operational issues encountered in preparation for the first flight test of the Orion Launch Abort System.