Engineering Papers⌕ Search

Engineering topics

Guirgis, Peggy

Publications and source records attributed to Guirgis, Peggy.

A Dual-Chamber Hybrid Inflatable Suitlock (DCIS) for Planetary Surfaces or Deep Space

The Habitat Demonstration Unit (HDU) Project in conjunction with the NASA Extravehicular Activity (EVA) team has identified a need for a hybrid inflatable and hard shell suitlock that can be used for planetary surface and deep space human exploration missions. Through ongoing analog studies at NASA Desert Research and Technologies Studies (D-RATS) and in NASA's Prototyping Testbed Facility, it has been determined that a compactly stowed, deployable suitlock unit is needed to accommodate advanced EVA egress and ingress operations for various environments with only minor modification.The Dual-Chamber Inflatable Suitlock (DCIS) consists of three hard in-line bulkheads, separating two cylindrical membrane-walled compartments. A dual-compartment suitlock will allow for dust and contaminant control, suit maintenance, and efficient egress / ingress; and the inflatable aspect of the design will allow the unit to stow in a compact package for transport. This paper describes the DCIS functionality, subsystems, and operational scenarios.The novel concepts included in the DCIS are the triple bulkhead, dual-chamber that has one compartment that is continuously pressurized (either at cabin pressure, or may be used for transitional pressure from high-pressure habitats), and a nominal unpressurized second compartment where the suits will be kept for normal operations. The advantages include quicker egress / ingress, capacity for 'shirt sleeve' suit maintenance, and portability of the entire unit.

habitat demonstration unit (HUD)↗

Deep Space Habitat Team: HEFT Phase 2 Effects

HEFT was a NASA-wide team that performed analyses of architectures for human exploration beyond LEO, evaluating technical, programmatic, and budgetary issues to support decisions at the highest level of the agency in HSF planning. HEFT Phase I (April - September, 2010) and Phase II (September - December, 2010) examined a broad set of Human Exploration of Near Earth Objects (NEOs) Design Reference Missions (DRMs), evaluating such factors as elements, performance, technologies, schedule, and cost. At end of HEFT Phase 1, an architecture concept known as DRM 4a represented the best available option for a full capability NEO mission. Within DRM4a, the habitation system was provided by Deep Space Habitat (DSH), Multi-Mission Space Exploration Vehicle (MMSEV), and Crew Transfer Vehicle (CTV) pressurized elements. HEFT Phase 2 extended DRM4a, resulting in DRM4b. Scrubbed element-level functionality assumptions and mission Concepts of Operations. Habitation Team developed more detailed concepts of the DSH and the DSH/MMSEV/CTV Conops, including functionality and accommodations, mass & volume estimates, technology requirements, and DDT&E costs. DRM 5 represented an effort to reduce cost by scaling back on technologies and eliminating the need for the development of an MMSEV.

Toups, Larry D.↗

The Evolution of Extravehicular Activity Operations to Lunar Exploration Based on Operational Lessons Learned During 2009 NASA Desert RATS Field Testing

This paper will present options to evolutionary changes in several philosophical areas of extravehicular activity (EVA) operations. These areas will include single person verses team EVAs; various loss of communications scenarios (with Mission Control, between suited crew, suited crew to rover crew, and rover crew A to rover crew B); EVA termination and abort time requirements; incapacitated crew ingress time requirements; autonomous crew operations during loss of signal periods including crew decisions on EVA execution (including decision for single verses team EVA). Additionally, suggestions as to the evolution of the make-up of the EVA flight control team from the current standard will be presented. With respect to the flight control team, the major areas of EVA flight control, EVA Systems and EVA Tasks, will be reviewed, and suggested evolutions of each will be presented. Currently both areas receive real-time information, and provide immediate feedback during EVAs as well as spacesuit (extravehicular mobility unit - EMU) maintenance and servicing periods. With respect to the tasks being performed, either EMU servicing and maintenance, or the specific EVA tasks, daily revising of plans will need to be able to be smoothly implemented to account for unforeseen situations and findings. Many of the presented ideas are a result of lessons learned by the NASA Johnson Space Center Mission Operations Directorate operations team support during the 2009 NASA Desert Research and Technology Studies (Desert RATS). It is important that the philosophy of both EVA crew operations and flight control be examined now, so that, where required, adjustments can be made to a next generation EMU and EVA equipment that will complement the anticipated needs of both the EVA flight control team and the crews.

Bell, Ernest R., Jr.↗