Understanding the Challenges of Financing Modular Construction: A Case Study for Prospective Multifamily Units

Compared to traditional site build, modular construction can significantly shorten construction schedules and speed income generation. Modular construction may also reduce construction costs. Yet access to commercial financing remains one of the most significant barriers to modular construction. Materials must be purchased, and production lines reconfigured for each project months ahead of fabrication. Materials alone can be 60% or more of the total cost of production. As a result, manufacturers require large upfront deposits—often 30% or more of the off-site contract. In addition, the capital-intensive nature of modular construction requires frequent progress payments for manufacturers to maintain cash flow. For those lenders willing to fund modular projects, many require the developer to share more of the risk. This may include the developer paying for line reservation fees and material deposits 3–6 months prior to production. Because these are unsecured loans, interest rates may be higher and loan amounts lower. As suppliers, modular manufacturers discourage retainage. Together, these and other factors may contribute to higher equity requirements for the developer—particularly at the beginning of the project.

29 ENERGY PLANNING, POLICY, AND ECONOMY↗

Multifamily Air Leakage Evaluation: A Modular Case Study

The purpose of this case study is to compare the air leakage rates of modular and site-built multifamily dwelling units. The methods, materials, and equipment were observed to be very similar in the modular and site-constructed units in this case study. The installation quality of building envelope measures such as insulation and air barrier appeared to be better for modular construction, because they were installed in a controlled, factory setting. Through field observations, we identified cosmetic damage to the envelope of modular units following transport to the building site, but with no resulting significant air leakage pathways. However, we did see air leakage pathways resulting from field modifications to the envelope of modular units to accommodate structural and mechanical connections. We found that the extensive use of through-wall HVAC systems, combined with the transport, placement, and rework of modular units may compromise the high-quality envelope installation and airtightness observed in the factory without careful planning and/or design. Opportunities for improvement identified from the tested modular dwelling units include minimizing and optimally locating penetrations, pre-cutting and detailing penetrations at the factory where possible, properly sealing field modifications, and using split HVAC systems in place of through-wall packaged systems.

32 ENERGY CONSERVATION, CONSUMPTION, AND UTILIZATI↗