Summary of LSST systems analysis and integration task for SPS flight test articles

The structural and equipment requirements for two solar power satellite (SPS) test articles are defined. The first SPS concept uses a hexagonal frame structure to stabilize the array of primary tension cables configured to support a Mills Cross antenna containing 17,925 subarrays composed of dipole radiating elements and solid state power amplifier modules. The second test article consists of a microwave antenna and its power source, a 20 by 200 m array of solar cell blankets, both of which are supported by the solar blanket array support structure. The test article structure, a ladder, is comprised of two longitudinal beams (215 m long) spaced 10 m apart and interconnected by six lateral beams. The system control module structure and bridge fitting provide bending and torsional stiffness, and supplement the in plane Vierendeel structure behavior. Mission descriptions, construction, and structure interfaces are addressed.

Greenberg, H. S.↗

Satellite power systems structures: A 1980 technology status review

The classes of major structural components and constructions utilized were considered. A review of the current (SPS) structure technology status was made. The major issues considered pertinent to SPS structures are: Cost effective construction, construction materials, structural design requirements, stress and dimensional integrity of as-built structures, and predictability of strength and dynamic behavior. The feasibility of passive figure control approach to MPTS flatness, of structure stiffness compatible with MPTS pointing, of passive control through damping, and the feasibility of space fabrication of ultra-large reflector surfaces are also considered. Qualification, model verification, inspection are considered of vital concern.

Greenberg, H. S.↗

Space construction system analysis. Part 2: Construction analysis

The construction methods specific to the end to end construction process for building the ETVP in low Earth orbit, using the space shuttle orbiter as a construction base, are analyzed. The analyses concerned three missions required to build the basic platform. The first mission involved performing the fabrication of beams in space and assembling the beams into a basic structural framework. The second mission was to install the forward support structure and aft support structure, the forward assembly, and a TT&C antenna. The third mission plan was to complete the construction of the platform and activate it to begin operations in low Earth orbit. The integration of the activities for each mission is described along with the construction requirements and construction logic.

Roebuck, J. A.↗

Space construction system analysis. Part 2: Platform definition

The top level system requirements are summarized and the accompanying conceptual design for an engineering and technology verification platform (ETVP) system is presented. An encompassing statement of the system objectives which drive the system requirements is presented and the major mission and subsystem requirements are described with emphasis on the advanced communications technology mission payload. The platform design is defined and used as a reference configuration for an end to space construction analyses. The preferred construction methods and processes, the important interactions between the platform design and the construction system design and operation, and the technology development efforts required to support the design and space construction of the ETVP are outlined.