Engineering Papers⌕ Search

Engineering topics

Green, M.

Publications and source records attributed to Green, M..

The Majorana Demonstrator Status and Preliminary Results

The MAJORANA Collaboration is using an array of high-purity Ge detectors to search for neutrinoless double-beta decay in 76 Ge. Searches for neutrinoless double-beta decay are understood to be the only viable experimental method for testing the Majorana nature of the neutrino. Observation of this decay would imply violation of lepton number, that neutrinos are Majorana in nature, and provide information on the neutrino mass. The MAJORANA DEMONSTRATOR comprises 44.1 kg of p-type point-contact Ge detectors (29.7 kg enriched in 76 Ge) surrounded by a low-background shield system. The experiment achieved a high efficiency of converting raw Ge material to detectors and an unprecedented detector energy resolution of 2.5 keV FWHM at Q ββ . The MAJORANA collaboration began taking physics data in 2016. Here, this paper summarizes key construction aspects of the Demonstrator and shows preliminary results from initial data.

72 PHYSICS OF ELEMENTARY PARTICLES AND FIELDS↗

COHERENT Experiment: current status

The COHERENT Collaboration is realizing a long term neutrino physics research program. The main goals of the program are to detect and study elastic neutrino-nucleus scattering (CEνNS). This process is predicted by Standard Model but it has never been observed experimentally because of the very low energy of the recoil nucleus. COHERENT is using different detector technologies: CsI[Na] and NaI scintillator crystals, a single-phase liquid Ar and a Ge detectors. The placement of all the detector setups is in the basement of the Spallation Neutron Source (SNS) at Oak Ridge National Laboratory (ORNL). The current status of the COHERENT experimental program is presented.

36 MATERIALS SCIENCE↗

The PROSPECT physics program

The precision reactor oscillation and spectrum experiment, PROSPECT, is designed to make a precise measurement of the antineutrino spectrum from a highly-enriched uranium reactor and probe eV-scale sterile neutrinos by searching for neutrino oscillations over a distance of several meters. The subject of this paper, PROSPECT, is conceived as a 2-phase experiment utilizing segmented 6 Li-doped liquid scintillator detectors for both efficient detection of reactor antineutrinos through the inverse beta decay reaction and excellent background discrimination. PROSPECT Phase I consists of a movable 3 ton antineutrino detector at distances of 7–12 m from the reactor core. It will probe the best-fit point of the ν e disappearance experiments at 4σ in 1 year and the favored region of the sterile neutrino parameter space at > 3σ in 3 years. With a second antineutrino detector at 15–19 m from the reactor, Phase II of PROSPECT can probe the entire allowed parameter space below 10 eV 2 at 5σ in 3 additional years. Finally, the measurement of the reactor antineutrino spectrum and the search for short-baseline oscillations with PROSPECT will test the origin of the spectral deviations observed in recent θ 13 experiments, search for sterile neutrinos, and conclusively address the hypothesis of sterile neutrinos as an explanation of the reactor anomaly.

72 PHYSICS OF ELEMENTARY PARTICLES AND FIELDS↗

Barium-Dispenser Thermionic Cathode

Improved reservoir cathode serves as intense source of electrons required for high-frequency and often high-output-power, linear-beam tubes, for which long operating lifetime important consideration. High emission-current densities obtained through use of emitting surface of relatively-low effective work function and narrow work-function distribution, consisting of coat of W/Os deposited by sputtering. Lower operating temperatures and enhanced electron emission consequently possible.

Wintucky, Edwin G.↗

Double Compton scatter telescope calibration

Calibration techniques for a medium energy gamma ray telescope are described. Gain calibration using Compton edge spectra involves comparisons of pulse height spectra with spectra simulated by a Monte Carlo computer code which includes Compton scattering and pair production, plural scattering and variable energy resolution, and cell size. The telescope considered comprises 56 cells of liquid scintillator in four size groups, with a total liquid volume of 325 l; each cell has its own photomultiplier tube. Energy and angular resolutions and the PMT gain calibration procedure are verified with double scatter data for monoenergetic gamma rays at a known location. Detection probabilities for any cell combination in the two telescope arrays are calculated per steradian as a function of the scattering for a number of different energies with a Van de Graaff accelerator.

Dayton, B.↗

Concept considerations for a small orbital transfer vehicle

This paper summarizes a study of small orbital transfer vehicles to place payloads in orbits with altitudes above those of the standard Shuttle operations. The overall objective of the study is to examine the role of the small orbital transfer vehicle (SOTV) in Shuttle operations and to identify typical propulsion concepts for accomplishing the mission. Consideration is given to existing and planned systems and upper stages, along with new propulsion stages. The new propulsion concept development examines tandem and clustered solids, controlled solids, monopropellant and bipropellant liquids, and staged solid/liquid combinations. The paper presents considerations of the mission requirements, tradeoffs of the various configurations, and candidate selections. For the selected candidate concepts the performance, support equipment, operational considerations and program costs were determined. The results show that a new modular liquid stage system is cost effective in handling the majority of the payloads considered. The remainder of the payloads can be accomodated by existing systems.

Green, M.↗

Apollo telescope mount SEC camera tube spares program

An important engineering improvement was made during the Spares Program. The thermionic cathode structure was modified to bring the cathode temperature to a more suitable value and shields were placed over the glass-to-metal interface of the stem leads to reduce the possibility of interelectrode leakage. The cathode temperature change has resulted in a corresponding change in the recommended operating conditions for the heater of the thermionic cathode. All tubes built during the 1972-1973 ATM Spares Program should be operated with a heater current of 150 mA (6.3 volts). Operation at lower currents and voltages adversely affects the life of these tubes.

Green, M.↗