Engineering Papers⌕ Search

Engineering topics

Gray, Kimberly

Publications and source records attributed to Gray, Kimberly.

At least 19 records

Direct Air Capture Recovery of Energy for CCUS Partnership (DAC RECO 2 UP) Final Technical Report

The “Direct Air Capture Recovery of Energy for CCUS Partnership (DAC RECO 2 UP)” project employs a team approach and supports the U.S. Department of Energy Office of Fossil Energy and Carbon Management’s (DOE-FECM) goal to decrease the cost of capture through the testing of existing direct air capture (DAC) materials in integrated field units that produce a concentrated carbon dioxide (CO 2 ) stream of at least 95% purity. Solid-amine CO 2 adsorption-desorption contactor technology, proven in the laboratory, is undergoing high-fidelity design/validation. Recoverable energy is readily available from a large number of commercial locations where DAC can be deployed; therefore, advancing the fidelity of energy recovery to directly reduce the cost of DAC is a key project objective. In addition, many commercial facilities have low-concentration CO 2 vents that are uneconomical to treat alone but could provide more efficient mass and thermal transport to DAC systems with integrated energy recovery and flexible CO 2 treatment capabilities. Technology scale-up leverages past research and occurs in a commercially relevant environment at the National Carbon Capture Center. Prescreening techno-economic analysis, risk assessments, and life cycle analysis are being performed by experienced team members. Results of the project will address critical technical barriers that, when solved, will improve the capital and operating costs of DAC while validating commercial relevance of cost and product quality/need.

54 ENVIRONMENTAL SCIENCES↗

Establishing an Early CO 2 Storage Complex in Kemper County, Mississippi (ECO 2 S) (CarbonSAFE Phase II, Final Report)

The CarbonSAFE Phase II: Storage Complex Feasibility project, entitled “Establishing an Early CO 2 Storage Complex in Kemper County, Mississippi: Project ECO 2 S,” demonstrates that the subsurface adjacent to the Kemper County energy facility can safely and permanently store commercial-scale volumes of carbon dioxide (CO 2 ). Project ECO 2 S is led by the Southern States Energy Board (SSEB). Mississippi Power Company (MPC) serves as the site host. The project includes technical and field implementation support from Advanced Resources International (ARI) and obtains analytical support from two national laboratories (Los Alamos and Lawrence Berkeley), a host of universities, and other key participants. A 30,000-acre area of interest was established. Three new characterization wells were drilled to facilitate the detailed geologic analyses, characterization, and modeling of three prospective storage reservoirs. The results verify and validate that the subsurface reservoirs examined have gigatonne CO 2 storage potential. This final report documents the achievements of the project team in successfully attaining the goals and objectives set forth for the project and summarizes the results of the feasibility study.

01 COAL, LIGNITE, AND PEAT↗

SECARB Regional Project Assessment

The SECARB Cranfield Early Test Project was designed to safely demonstrate large-scale, long-term CO 2 injection and storage in a CO 2 -enhanced oil recovery (EOR) operation and associated saline reservoir. Storage during EOR operations has the potential to offset commercial costs, holding a significant promise for future large-scale deployment in the southeastern United States. Denbury Onshore LLC began CO 2 -EOR operations in July 2008 at the Cranfield oilfield located east of Natchez, Mississippi (Figure 1). The location offered an ideal setting to investigate storage monitoring at a commercial CO 2 -EOR operation. The field team, led by the Gulf Coast Carbon Center of the Bureau of Economic Geology at the University of Texas at Austin, deployed the largest suite of monitoring, verification, accounting (MVA) technologies to collect data to assess long-term CO 2 utilization and storage. The CO 2 injection interval is within the 3,000-meter-deep fluvial lower Tuscaloosa Formation, a large and regionally extensive saline reservoir, at a broad four-way structural closure that defines the Cranfield oilfield. Tests were conducted in the oil-producing area as well as in the non-oil-producing brine aquifer. The CO 2 used during EOR operation was transported via pipeline from the Jackson Dome, a natural source of CO 2 . The study focused on four integrated research areas: (1) the High-Volume Injection Test area (HiVIT); (2) the Detailed Area of Study (DAS); (3) the Geomechanical area; and (4) the near-surface observatory, also called the “P-site.” CO 2 injection occurred at the HiVIT and the DAS (Figure 2 and Figure 3). The DAS was located down-dip of the oil-water interface of the Cranfield oilfield. The well layout included one injection well and two down-dip observation wells. The team was the first of the regional partnerships to monitor more than 1 million metric tons of CO 2 . At the end of the project, the team monitored more than 11 million metric tons of CO 2 injected and 5 million metric tons of CO 2 stored. The Cranfield Project was the fifth project worldwide, and the first such project in the United States, to reach this CO 2 injection volume while being monitored to demonstrate storage effectiveness.

01 COAL, LIGNITE, AND PEAT↗

Geologic Risk Assessment Activities at SECARB Cranfield, MS Site

Risk Assessment (RA) of RCSP Phase 3 sites is a DOE requirement and valuable to DOE’s program because this process encourage careful consideration of elements that could damage an individual project, or if severe ,damage credibility and public commercial acceptance of the sequestration process. Poor outcomes even from small projects can have negative consequences larger than the cost to the individual project. In addition, practice in risk assessment compared to project evolution is needed as part of the confidence-building toward future large scale, long term industrial activities.

01 COAL, LIGNITE, AND PEAT↗

Information on Subsequent Updates to Regional Atlas - SECARB Virtual

During 2020, SSEB worked with its SECARB partners to develop an update for the sixth version of the Atlas to be published as a virtual-only edition by NETL. The following report provides content that was sent to NETL for the SECARB portions of Atlas VI. This report satisfies the requirements for Work Product 1.9.a.

54 ENVIRONMENTAL SCIENCES↗

Southeast Regional CO 2 Utilization and Storage Acceleration Partnership (SECARB-USA): Needs Assessment Framework

The goal of this task is to develop an assessment to identify data needed to advance geologic storage projects, with a focus on the SECARB region. The GCCC team considers the needs of CO 2 source, storage, and utilization operators and stakeholders, finance and insurance institutions, state and local government relators and agencies, property owners, local stakeholders at prospective storage complexes, and environmental non-governmental organizations (NGOs). Many of these needs are spelled out in the requirements of the Class VI permit. However, at the initial stages of project development, the workflow will not start with permit writing. A number of other factors must be evaluated prior to this major investment. The team’s goal in this report is to inventory the range of typical needs of for a wide variety of projects. For subsequent tasks, the team will consider how these needs vary among projects and through the stages of investment, so that project developers can plan the early stages of capitalization.

42 ENGINEERING↗

Southeast Regional CO 2 Utilization and Storage Acceleration Partnership (SECARB-USA): Data Quality Methodology (4.2.1)

SECARB-USA Deliverable 4.2.1 utilizes the outputs from the Needs Assessment (Subtask 2.1) to develop a data quality methodology. Many types of data are needed to evaluate a site for technical and financial viability. Several inventories of data types have been produced (for example NETL, 2010). The objective here is to organize the data types so that the needs met are specified. From this cross index (Table 1 in the Appendix), it will be possible in future tasks to (1) determine, on a site-specific basis, how much of each data type is required at each stage of a project to meet the need, and conversely (2) to further specify and define the data collection methods applied such that the data are tailored to fit that need. Derivative tables can then be developed to semi-quantitively evaluate the extent to which need is critical for early go/no decision points, or if it is more important than average, requiring faster or larger capitalization and spend to meet the need. In an additional step, the current availability of data for a site can be semi-quantitively assessed. From the table of data criticality and the table of data availability, site-specific cost for meeting the data needs can be determined, and allow a pre-permit spend estimated for a portfolio of projects. All of the data needs to evaluate a site are somewhat interconnected. We used criterion (2) above to determine if the data collection design would have to be modified to meet the need; if this was commonly true a linkage was shown. The application of this cross index to sites in the subsequent tasks will demonstrate that the demand for data types varies site-to-site and project-to-project. Examples of factors to be considered are the complexity of the geology, the injection goals such as rate and duration of the injection, and the types of risk and risk tolerance of key stakeholders. In future tasks the team will compare the demand for data with existing data availability. This will, in turn, determine when data needs to be acquired to support project development. For example, in a project area with complex structure, 3-D seismic data may be needed earlier and more urgently than in an area with simple rock body geometries. In some locations, a 3-D seismic survey has already been collected and can be purchased. In other locations the project developer will need to collect these data. For another example, a project near an urban area or near to a park may generate earlier and more substantive public concern than a site that is developed in mined lands. A calculation using the derivative from table 1 will show the different investment needs. Project cost will vary corresponding to data criticality and data availability.

42 ENGINEERING↗

SECARB-USA: Preliminary Regional Assessment of Potential Storage Complexes, Including Capacities and Costs, Based on Application of NRAP and SCO2T

This subtask focused on producing estimates of CO 2 injection rates, storage capacity, and sequestrations costs across the entire Southeast Regional CO 2 Utilization and Storage Acceleration Partnership (SECARB-USA) region. These estimates will then be used in subsequent tasks that rely on understanding CO 2 storage and sequestration cost estimates. The data are generated and reported using 10x10 km (100 km 2 ) grid cells across based on the NATCARB dataset.

54 ENVIRONMENTAL SCIENCES↗

Southeast Regional CO 2 Utilization and Storage Acceleration Partnership (SECARB-USA): Data Management Plan

The “Southeast Regional CO 2 Utilization and Storage Acceleration Partnership” (SECARB-USA) is designed to assess the region’s subsurface resources and burgeoning technology applications. This work supports the U.S. Department of Energy’s (DOE) Office of Fossil Energy’s (FE) mission to help the United States meet its need for secure, affordable, and environmentally sound fossil energy supplies by utilizing the advancements made by the current RCSP initiative to continue to identify and address knowledge gaps.

42 ENGINEERING↗