Engineering PapersSearch

Engineering topics

Graat, E.

Publications and source records attributed to Graat, E..

At least 19 records

Use of Very Long Baseline Array Interferometric Data for Spacecraft Navigation

The main VLBI technique that is used at JPL is known as the Delta Differential One-way Ranging ((Delta)DOR). Two DSN antennas simultaneously track a source, and alternate between sources. The signals recorded at the antennas from each source are correlated to obtain the delay in arrival to the two antennas, and the delays are differenced to remove common-source errors. An alternative technique is to use carrier phase differences between antennas. This is routinely done by the Very Large Baseline Array (VLBA) as part of source imaging. The VLBA capabilities are used for scientific research, but also have the potential to be used for navigation. Two main experiments were performed with the VLBA and JPL spacecraft. This paper describes and analyzes these experiments and discusses the possible uses of VLBA tracking for spacecraft navigation.

Very Large Baseline Array (VLBA)

The Strategy for the Second Phase of Aerobraking Mars Global Surveyor

This paper focuses on and describes the strategy developed for the second phase of aerobraking MGS. This description includes the baseline aerobraking flight profile and the key trajectory metrics that were monitored in order to successfully guide the spacecraft to its desired mapping orbit.

aerobraking

Navigating Mars Global Surveyor Through the Martian Atmosphere: Aerobraking 2

The Mars Global Surveyor (MGS) spacecraft was successfully inserted into an elliptical orbit around Mars on 9/12/97, 01:53:49 UTC. This orbit was near polar (inclination=93.26 deg) with an orbital period of 44.993 hours and apoapsis and periapsis altitudes of 54,025.9 km and 262.9 km respectively. After 201 orbits and 196 days after Mars orbit insertion, the first phase of aerobraking (AB), called AB 1, has ended; after the AB 1 termination maneuver, the orbital period was 11.64 hours with apoapsis and periapsis altitudes of 17,870.3 and 170.7 Ian respectively. Thereafter, MGS was in a science phasing orbit (SPO) and acquired data from the science instruments from 3/28/98 to 9/22/98 (orbits 202 through 572). The second phase of aerobraking (AB2) began on 9/23/98 with the first descent into the atmosphere on P574 and ended with the aerobraking termination maneuver (ABX) on 2/4/99 on A 1284. Just prior to ABX, the apoapsis and periapsis altitudes were 456.5 km and 116.7 km respectively with an orbit period of 1.973 hours, a local mean solar time (LMST) at the descending node of 2 hours, 3.6 minutes and an inclination of 92.9 degrees. AB was responsible for circularization of the MGS orbit. However, two additional orbital conditions had to be satisfied simultaneously. These were a) complete AB2 when the LMST at the descending node was close to 2:00 am and b) the inclination was at 93.0 degrees. This paper describes the navigation of MGS throughout AB2; a companion paper describes the strategy and plan for aerobraking. Navigation challenges involved: a) the estimation of an atmospheric density model for every drag pass or periapsis-passage by analyzing doppler tracking data, b) the generation of a short-term, that is over one to several orbits, accurate atmospheric density predictions, c) maintaining the spacecraft's orbit within upper and lower bounds of atmospheric density or dynamic pressure during each periapsis-passage, and d) the prediction of accurate periapsis-passage times (Tp) over one to fifteen orbits. The density estimation and analysis procedure, evaluation of almost 700 atmospheric densities throughout AB2, the variation and accuracy of density predictions, the Tp prediction accuracy and how effectively we terminated AB2 are the basis of this paper and shall be presented in detail. A summary overview of AB2 is given.

Esposito, P.

Mars global surveyor navigation and aerobraking at Mars

The Mars Global Surveyor (MGS) spacecraft was successfully inserted into an elliptical orbit around Mars on 9/12/97, 01:53:49 UTC. This orbit was near polar (inclination = 93.26 deg) with an orbital period of 44.993 hours and apoapsis and periapsis altitudes of 54,025.9 km and 262.9 km respectively. After a short aerobraking (AB) initiation interval (9/12/97 to 10/2/97), the main phase of AB or orbit period reduction was established. However shortly thereafter, a significant problem with the minus-Y axis solar array developed which necessitated a temporary suspension of AB. Ultimately, this forced the Project to abandon the original plan to complete AB on 1/18/98 and establish the mapping orbit on 3/15/98. The revised plan called for a reduced level of AB, thus subjecting the solar array and yoke assembly to less aerodynamic stress. After 201 orbits and 196 days after MOI, the first phase of AB has ended, the orbital period was 11.64 hours with apoapsis and periapsis altitudes of 17,870.3 and 170.7 km respectively. At present, MGS is in a science phasing orbit (SPO) and shall acquire science data from 3/28/98 to 9/11/98. Thereafter the second phase of AB shall begin and is expected to end during Feb 1999 when the orbital period shall be 1.9 hours and the orbit's descending node shall be at the 2:00 am (local mean solar time) orientation.

Esposito, P.

Mars Global Surveyor Aerobraking at Mars

This paper describes the areobraking strategy developed for the MGS mission. In addition, this paper describes the aerobraking progress of the MGS spacecraft made following a three week aerobraking hiatus that occurred in October 1997.

Mars

Navigation and the Mars global surveyor mission

Navigation and trajectory planning aspects for the Mars global surveyor (MGS) mission, are discussed. In the first 205 days of the mission since launch on 7 November July 1996, two trajectory maneuvers were successfully completed. The third maneuver was cancelled due to the accuracy of the targeting of the previous maneuvers. The final trajectory correction maneuver will occur on arrival in order to adjust the arrival conditions for the Mars orbit insertion maneuver. The planned capture orbit is highly elliptical with a 45 hour orbital period, a 300 km periapsis altitude and a descending node. Two-way coherent Doppler and time delay measurements are acquired in the X-band by the Deep Space network and used to navigate the spacecraft. After capture, the orbit will be circularized by aerobraking and propulsive maneuvers. The three-phase aerobraking maneuver is described. During the 687 earth-day observation period, navigation will maintain a 2:00 pm descending node, sun-synchronous low altitude, short periodic orbit. Ground track coverage will remain almost uniform in order to maximize data acquisition.

Esposito, P.