Engineering PapersSearch

Engineering topics

Giorgini, J.

Publications and source records attributed to Giorgini, J..

26 records · Page 2

Radar Observations of Asteroid 7822 (1991 CS)

We report Doppler-only (cw) radar observations of 1991 CS obtained at Goldstone at a transmitter frequency of 8510 MHz (3.5 cm) on 1996 August 26, 27, 28, and 29.

Asteroids radar 1991 CS asteroid 7822

Navigation and the Mars global surveyor mission

Navigation and trajectory planning aspects for the Mars global surveyor (MGS) mission, are discussed. In the first 205 days of the mission since launch on 7 November July 1996, two trajectory maneuvers were successfully completed. The third maneuver was cancelled due to the accuracy of the targeting of the previous maneuvers. The final trajectory correction maneuver will occur on arrival in order to adjust the arrival conditions for the Mars orbit insertion maneuver. The planned capture orbit is highly elliptical with a 45 hour orbital period, a 300 km periapsis altitude and a descending node. Two-way coherent Doppler and time delay measurements are acquired in the X-band by the Deep Space network and used to navigate the spacecraft. After capture, the orbit will be circularized by aerobraking and propulsive maneuvers. The three-phase aerobraking maneuver is described. During the 687 earth-day observation period, navigation will maintain a 2:00 pm descending node, sun-synchronous low altitude, short periodic orbit. Ground track coverage will remain almost uniform in order to maximize data acquisition.

Esposito, P.

(abstract) Asteroid Radar Astronomy at Goldstone in the 1990s

Since 1990, much effort has been devoted to optimizing Goldstone's capability to study near-Earth objects (NEOs). Three different configurations are now available. The nominal system on the 70-m antenna (DSS 14) uses separate feed horns for transmitting and receiving, and the 15-plus seconds required for transmit-to-receive switching renders the system useless for targets much closer than about 0.025 AU (about 10 lunar distances, about 25 seconds of echo time delay) and unwieldy even for targets twice that far. However, an additional, recently installed single horn system shrinks switching time to about 5 seconds, letting DSS 14 observe NEOs as close as about 5 lunar distances. Closer targets will require two-station observations, with DSS 14 transmitting continuously while DSS 13, a 34-m antenna 22 km away, receives. That configuration, first used for Toutatis, will also be required for delay-Doppler imaging that places thousands of pixels on any NEO whose rotation period P(h) and echo roundtrip time delay RTT (s) satisfy P > RTT. Between January 1990 and June 1994, the Goldstone radar has detected 11 asteroids. During the next 2 years, seven asteroids are scheduled for Goldstane observations. After completion of the Arecibo upgrade, Goldstone will play an important complementary role to that much more sensitive instrument.

asteroids radar Goldstone delay-Doppler imaging Ar

Navigating the Magellan Aerobrake

The Magellan spacecraft has been aerobraked into a 197 x 541 km near-circular orbit around Venus from which it is conducting a high-resolution gravity mapping mission. This was the first interplanetary aerobrake maneuver and involved flying the spacecraft through the upper reaches of the Venusian atmosphere 730 times over a 70 day period.

Magellan aerobrake Venusian