Engineering topics
Gilbert, John B.
Publications and source records attributed to Gilbert, John B..
Cassini Power Subsystem
The electrical output of Cassini’s power system has been decaying consistently as predicted during its 20-year mission between October 1997 and September 2017. The power telemetry data is presented for the entire Cassini mission, including launch, cruise, and Saturn tour, up to the most recent available data. The spacecraft has been powered by three independent Radioisotope Thermoelectric Generators (RTGs) connected in parallel, which were able to generate 882 W at the beginning of the mission shortly after launch. The decrease in power energy output has mainly been driven by the heat reduction of the hot side of the RTGs due to the natural radioactive decay of its heat source plutonium (mostly plutonium-238 [238Pu]), degradation of thermoelectric material performance, and interface degradation.
Spitzer Space Telescope in-orbit checkout and science verification operations
Spitzer Space Telescope, the fourth and final of NASA's great observatories, and the first mission in NASA's Origins Program was launched 25 August 2003 into an Earth-trailing solar orbit. The observatory was designed to probe and explore the universe in the infrared. Before science data could be acquired, however, the observatory had to be initialized, characterized, calibrated, and commissioned. A two phased operations approach was defined to complete this work. These phases were identified as In-Orbit Checkout (IOC) and Science Verification (SV). Because the observatory lifetime is cryogen-limited these operations had to be highly efficient. The IOC/SV operations design accommodated a pre-defined distributed organizational structure and a complex, cryogenic flight system. Many checkout activities were inter-dependent, and therefore the operations concept and ground data system had to provide the flexibility required for a 'short turn-around' environment. This paper describes the adaptive operations system design and evolution, implementation, and lessons-learned from the completion of IOC/SV.