Engineering Papers⌕ Search

Engineering topics

Ghosh, Shibani

Publications and source records attributed to Ghosh, Shibani.

Distribution Integration Solution Cost Options (DISCO) [Slides]

DISCO is a Python-based NREL software tool for conducting scalable, repeatable distribution analyses. Although DISCO was originally developed to support photovoltaic impact analyses, it can also be used to understand the impact of other distributed energy resources and load changes on distribution systems. This presentation took place on April 9, 2024, and included NREL power grid researchers Sherin Ann Abraham and Shibani Ghosh.

29 ENERGY PLANNING, POLICY, AND ECONOMY↗

Prefeasibility Analysis of Behind-the-Meter Distributed Energy Resources in Highland Park, MI: Highland Park Pathways to Power [Slides]

Through the Communities LEAP (Local Energy Action Program) Pilot, the National Renewable Energy Laboratory (NREL) engaged the Highland Park Stakeholder Coalition to scope four technical assistance work areas to address their energy needs and goals. This slide deck addresses the highlighted tasks under work area "B" related to policy analysis, due diligence, and case studies for removing barriers and providing best practices for local clean energy development. NREL used the REopt platform to evaluate the techno-economic potential of adding solar PV, electric storage, and/or diesel generators at several locations in Highland Park, Michigan: a typical residential and commercial building in Highland Park, the Earnest T. Ford Recreation Center, and the Parker Village Microgrid. The analysis goals focused on the ability of solar PV, electric storage, and/or diesel generators to reduce electricity costs and improve site resilience.

24 POWER TRANSMISSION AND DISTRIBUTION↗

Distribution Grid Impact Study in Highland Park, Michigan: Understanding Rooftop Solar, Behind-the-Meter Energy Storage, Electric Vehicle Charging, and Building Electrification [Slides]

Through the Communities LEAP (Local Energy Action Program) Pilot, the National Renewable Energy Laboratory (NREL) engaged the Highland Park Stakeholder Coalition to scope four technical assistance work areas to address their energy needs and goals. This slide deck addresses the highlighted tasks under work area "B" related to policy analysis, due diligence, and case studies for removing barriers and providing best practices for local clean energy development. Highland Park community members face frequent, long-duration power interruptions due largely to the aging distribution system serving the area and the legacy design standards used in its construction. While degrading physical infrastructure such as poles, crossarms, and transformers can result in this substandard reliability, another notable characteristic of this legacy system is the lower, 4.8 kV, voltage class. This is a legacy construction standard which many utilities, DTE included, are phasing out in favor of higher, 15 or 25 kV, voltage classes instead. The existing 4.8 kV distribution system serving Highland Park may limit significant adoptions of clean-energy technologies like high percentages of building electrification or electric vehicle adoption. The following analysis seeks to quantify these limitations under a variety of clean-energy technology adoption scenarios. It compares the overall system risks of the present system to those of a hypothetical, upgraded 13.2 kV system, using NREL-developed risk metrics and offers upgrade cost considerations. The legacy 4.8 kV voltage class serving Highland park is not, as we have modeled it, a major limitation to the widespread adoption of cost-optimal rooftop solar and/or behind-the-meter energy storage. Within our modeling framework, these technologies namely impact secondary, low-voltage assets, which may be remedied without the need for a system-wide upgrade to a 13.2 kV voltage class. Our model of the current 4.8kV system indicates it is not capable of supporting community-wide electrification efforts. Widespread building electrification, and the resulting large increase in wintertime load, dramatically increases the prevalence of voltage violations and thermal overloading on the current 4.8 kV distribution system. These impacts illustrate the need for system-wide upgrades to a 13.2 kV voltage class to accommodate these technologies. Low to Moderate DER adoption does not adversely impact the grid but does improve undervoltage and asset overloading issues. However, these benefits are insufficient to defer grid upgrades. Higher DER penetration is shown to increase overvoltage and asset overloading in future electrification scenarios.

29 ENERGY PLANNING, POLICY, AND ECONOMY↗