Role of Wind Power in Primary Frequency Response of an Interconnection: Preprint

The electrical frequency of an interconnection must be maintained very close to its nominal level at all times. Large frequency deviations can lead to unintended consequences such as load shedding, instability, and machine damage, among others. Turbine governors of conventional generating units provide primary frequency response (PFR) to ensure that frequency deviations are not significant duringlarge transient events. Increasing penetrations of variable renewable generation, such as wind and solar power, and planned retirements of conventional thermal plants - and thus a reduction in the amount of suppliers with PFR capabilities - causes concerns about a decline of PFR and system inertia in North America. The capability of inverter-coupled wind generation technologies to contribute toPFR and inertia, if appropriately equipped with the necessary control features, can help alleviate concerns. However, these responses differ from those supplied by conventional generation and inertia, and it is not entirely understood how variable renewable generation will affect the system response at different penetration levels. This paper evaluates the impact of wind generation providing PFRand synthetic inertial response on a large interconnection.

17 WIND ENERGY↗

PSCAD Modules Representing PV Generator

Photovoltaic power plants (PVPs) have been growing in size, and the installation time is very short. With the cost of photovoltaic (PV) panels dropping in recent years, it can be predicted that in the next 10 years the contribution of PVPs to the total number of renewable energy power plants will grow significantly. In this project, the National Renewable Energy Laboratory (NREL) developed a dynamic modeling of the modules to be used as building blocks to develop simulation models of single PV arrays, expanded to include Maximum Power Point Tracker (MPPT), expanded to include PV inverter, or expanded to cover an entire PVP. The focus of the investigation and complexity of the simulation determines the components that must be included in the simulation. The development of the PV inverter was covered in detail, including the control diagrams. Both the current-regulated voltage source inverter and the current-regulated current source inverter were developed in PSCAD. Various operations of the PV inverters were simulated under normal and abnormal conditions. Symmetrical and unsymmetrical faults were simulated, presented, and discussed. Both the three-phase analysis and the symmetrical component analysis were included to clarify the understanding of unsymmetrical faults. The dynamic model validation was based on the testing data provided by SCE. Testing was conducted at SCE with the focus on the grid interface behavior of the PV inverter under different faults and disturbances. The dynamic model validation covers both the symmetrical and unsymmetrical faults.

14 SOLAR ENERGY↗

NREL Controllable Grid Interface for Testing MW-Scale Wind Turbine Generators (Poster)

In order to understand the behavior of wind turbines experiencing grid disturbances, it is necessary to perform a series of tests and accurate transient simulation studies. The latest edition of the IEC 61400-21 standard describes methods for such tests that include low voltage ride-through (LVRT), active power set-point control, ramp rate limitations, and reactive power capability tests. The IEC methods are being widely adopted on both national and international levels by wind turbine manufacturers, certification authorities, and utilities. On-site testing of wind turbines might be expensive and time consuming since it requires both test equipment transportation and personnel presence in sometimes remote locations for significant periods of time because such tests need to be conducted at certain wind speed and grid conditions. Changes in turbine control software or design modifications may require redoing of all tests. Significant cost and test-time reduction can be achieved if these tests are conducted in controlled laboratory environments that replicate grid disturbances and simulation of wind turbine interactions with power systems. Such testing capability does not exist in the United States today. An initiative by NREL to design and construct a 7-MVA grid simulator to operate with the existing 2.5 MW and new upcoming 5-MW dynamometer facilities will fulfill this role and bring many potential benefits to the U.S. wind industry with the ultimate goal of reducing wind energy integration costs.

17 WIND ENERGY↗