Engineering PapersSearch

Engineering topics

Gary Mosier

Publications and source records attributed to Gary Mosier.

The Science Performance of JWST as Characterized in Commissioning

This paper characterizes the actual science performance of the James Webb Space Telescope (JWST), as determined from the six month commissioning period. We summarize the performance of the spacecraft, telescope, science instruments, and ground system, with an emphasis on differences from pre-launch expectations. Commissioning has made clear that JWST is fully capable of achieving the discoveries for which it was built. Moreover, almost across the board, the science performance of JWST is better than expected; in most cases, JWST will go deeper faster than expected. The telescope and instrument suite have demonstrated the sensitivity, stability, image quality, and spectral range that are necessary to transform our understanding of the cosmos through observations spanning from near-earth asteroids to the most distant galaxies.

Infrared astronomy

STOP Modeling for the JWST: Techniques, Results, and Sensitivities

The James Web Space Telescope (JWST) is a large, infrared-optimized, space telescope scheduled for launch to L2 in 2011. It must meet rigorous thermal stability requirements, almost all of which will be verified through analysis. Terrestrial testing will be performed but even that will require significant analytical interpretation of results. Preliminary analysis indicates that traditional second-order effects could cause the telescope to exceed established performance requirements. This leads to very large detailed models, primarily since composite tubes are being modeled using solid elements. To minimize differences between the current baseline and the model the project is using a number of rapid analysis cycles. The large size of the telescope models and the short cycle time creates a demanding multidisciplinary analysis environment.

John D. Johnston