Ganni, Venkatarao

Publications and source records attributed to Ganni, Venkatarao.

At least 19 records

FRIB Beam Power Ramp-up: Status and Plans

After project completion on scope, on cost, and ahead of schedule, the Facility for Rare Isotope Beams began operations for scientific users in May of 2022. The ramp-up to a beam power of 400 kW is planned over a six-year period; 1 kW was delivered for initial user runs from in 2022, and 5 kW was delivered as of February 2023. Test runs with 10 kW 36Ar and 48Ca beams were conducted in July 2023. Upgrade plans include doubling the primary-beam energy to 400 MeV/nucleon for enhanced discovery potential (¿FRIB 400¿). This talk reports on the strategic plans towards high power operations emphasizing challenges and resolutions in beam-interception devices and targetry systems, radiation protection and controls, and legacy system renovation and integration.

43 PARTICLE ACCELERATORS↗

FRIB Transition to User Operations, Power Ramp Up, and Upgrade Perspectives

After project completion on scope, on cost, and ahead of schedule, the Facility for Rare Isotope Beams began operations for scientific users in May of 2022. During the first 12 months of user operations, the FRIB accelerator complex delivered 5250 beam hours, including 1528 hours to nine science experiments conducted with primary beams of 36Ar, 48Ca, 70Zn, 82Se, 124Xe, and 198Pt at beam energies >200 MeV/u; 2724 hours for beam developments, studies, and tuning; and 998 hours to industrial users and non-scientific programs using the FRIB Single Event Effect (FSEE) beam line. The ramp-up to a beam power of 400 kW is planned over a six-year period; 1 kW was delivered for initial user runs from in 2022, and 5 kW was delivered as of February 2023. Upgrade plans include doubling the primary-beam energy to 400 MeV/nucleon for enhanced discovery potential (¿FRIB 400¿). This talk reports on FRIB status and progress since SRF2021, emphasizing lessons learned during the transition from beam commissioning to machine operations, challenges and resolutions for the power ramp-up, progress with accelerator improvements, and R&D for the energy upgrade.

43 PARTICLE ACCELERATORS↗

Commissioning and Testing of a new 4.5K Cold Box for JLab Cryogenic Test Facility

A new 4.5K cold box at Jefferson Lab (JLab) Cryogenic Test Facility (CTF) was recently installed and commissioned to upgrade the existing 4.5 K refrigeration system and work in parallel with the existing 4.5 K cold box. This new 4.5 K cold box is equipped with two turbo-expanders and, at its maximum capacity condition, it is expected to support at least 6.6 g/s of helium liquefaction or 650 W of refrigeration at 4.5 K. It can also handle up to 10 g/s 30 K return flow for 2 K refrigeration recovery that supports cryo-module and superconducting cavity testing. Performances of the cold box at its maximum capacity conditions as well as several other operating modes were tested for acceptance. Finally, we will briefly review the new 4.5 K cold box design features and discuss the commissioning and performance testing results.

42 ENGINEERING↗

FRIB Cryogenic Distribution System and Status

The MSU-FRIB cryogenic distribution system supports the 2 K primary, 4 K primary, and 35 - 55 K shield operation of more than 70 loads in the accelerator and the experimental areas. It is based on JLab and SNS experience with bayonet-type disconnects between the loads and the distribution system for phased commissioning and maintenance. The linac transfer line, which features three separate transfer line segments for additional independence during phased commissioning at 4 K and 2 K, connects the folded arrangement of 49 cryomodules and 4 superconducting dipole magnets and a fourth transfer line supports the separator area cryo loads. The pressure reliefs for the transfer line process lines, located in the refrigeration room outside the tunnel/accelerator area, are piped to be vented outdoors. The transfer line designs integrate supply and return flow paths into a combined vacuum space. The main linac distribution segments are produced in a small number of standard configurations; a prototype of one such configuration has been fabricated at Jefferson Lab and has been installed at MSU to support testing of a prototype FRIB cryomodule.

Ganni, Venkatarao↗

FRIB Cryogenic Plant Status

After practical changes were approved to the initial conceptual design of the cryogenic system for MSU FRIB and an agreement was made with JLab in 2012 to lead the design effort of the cryogenic plant, many activities are in place leading toward a cool-down of the linacs prior to 2018. This is mostly due to using similar equipment used at CHLII for the 12 GeV upgrade at JLab and an aggressive schedule maintained by the MSU Conventional Facilities department. Reported here is an updated status of the cryogenic plant, including the equipment procurement status, plant layout, facility equipment and project schedule.

Dixon, Kelly D.↗

Testing of a 4 K to 2 K heat exchanger with an intermediate pressure drop

Most large sub-atmospheric helium refrigeration systems incorporate a heat exchanger at the load, or in the distribution system, to counter-flow the sub-atmospheric return with the super-critical or liquid supply. A significant process improvement is theoretically obtainable by handling the exergy loss across the Joule-Thompson throttling valve supplying the flow to the load in a simple but different manner. As briefly outlined in previous publications, the exergy loss can be minimized by allowing the supply flow pressure to decrease to a sub-atmospheric pressure concurrent with heat exchange flow from the load. One practical implementation is to sub-divide the supply flow pressure drop between two heat exchanger sections, incorporating an intermediate pressure drop. Such a test is being performed at Jefferson Lab's Cryogenic Test Facility (CTF). This paper will briefly discuss the theory, practical implementation and test results and analysis obtained to date.

Knudsen, Peter N.↗

Commissioning and operational results of helium refrigeration system at JLab for the 12GeV upgrade

The new 4.5 K refrigerator system at the Jefferson Lab (JLab) Central Helium Liquefier (CHL-2) for the 12 GeV upgrade was commissioned in late spring of 2013, following the commissioning of the new compressor system, and has been supporting 12 GeV LINAC commissioning since that time. Six design modes were tested during commissioning, consisting of a maximum capacity, nominal capacity, maximum liquefaction, maximum refrigeration, maximum fill and a stand-by/reduced load condition. The maximum capacity was designed to support a 238 g/s, 30 K and 1.16 bar cold compressor return flow, a 15 g/s, 4.5 K liquefaction load and a 12.6 kW, 35-55 K shield load. The other modes were selected to ensure proper component sizing and selection to allow the cold box to operate over a wide range of conditions and capacities. The cold box system is comprised of two physically independent cold boxes with interconnecting transfer-lines. The outside (upper) 300-60 K vertical cold box has no turbines and incorporates a liquid nitrogen pre-cooler and 80-K beds. The inside (lower) 60-4.5 K horizontal cold box houses seven turbines that are configured in four expansion stages including one Joule-Thompson expander and a 20-K bed. The helium compression system has five compressors to support three pressure levels in the cold box. This paper will summarize the analysis of the test data obtained over the wide range of operating conditions and capacities which were tested.

Knudsen, Peter N.↗

Commissioning and operational results of the 12 GeV helium compression system at Jlab

The new compressor system at Jefferson Lab (JLab) for the 12 GeV upgrade was commissioned in the spring of 2013 and incorporates many design changes, discussed in previous publications, to improve the operational range, efficiency, reliability and maintainability as compared to previous compressor skids used for this application. The 12 GeV helium compression system has five compressors configured with four pressure levels supporting three pressure levels in the new cold box. During compressor commissioning the compressors were operated independent of the cold box over a wide range of process conditions to verify proper performance including adequate cooling and oil removal. Isothermal and volumetric efficiencies over these process conditions for several built-involume ratios were obtained. This paper will discuss the operational envelope results and the modifications/improvements incorporated into the skids.

Knudsen, Peter N.↗

Application of JLab 12GeV helium refrigeration system for the FRIB accelerator at MSU

The planned approach to have a turnkey helium refrigeration system for the MSU-FRIB accelerator system, encompassing the design, fabrication, installation and commissioning of the 4.5-K refrigerator cold box(es), cold compression system, warm compression system, gas management, oil removal and utility/ancillary systems, was found to be cost prohibitive. Following JLab’s suggestion, MSU-FRIB accelerator management made a formal request to evaluate the applicability of the recently designed 12GeV JLab cryogenic system for this application. The following paper will outline the findings and the planned approach for the FRIB helium refrigeration system.

43 PARTICLE ACCELERATORS↗

FRIB cryogenic distribution system

The Michigan State University Facility for Rare Isotope Beams (MSU-FRIB) helium distribution system has been revised to include bayonet/warm valve type disconnects between each cryomodule and the transfer line distribution system, similar to the Thomas Jefferson National Accelerator Facility (JLab) and the Spallation Neutron Source (SNS) cryogenic distribution systems. The heat loads at various temperature levels and some of the features in the design of the distribution system are outlined. The present status, the plans for fabrication, and the procurement approach for the helium distribution system are also included.

71 CLASSICAL AND QUANTUM MECHANICS, GENERAL PHYSIC↗

Linac cryogenic distribution system maintenance and upgrades at JLab

The Central Helium Liquefier (CHL) distribution system to the CEBAF and FEL linacs at Jefferson Lab (JLab) experienced a planned warm up during the late summer and fall of 2012 for the first time after its commissioning in 1991. Various maintenance and modifications were performed to support high beam availability to the experimental users, meet 10 CFR 851 requirements for pressure systems, address operational issues, and prepare the cryogenic interfaces for the high-gradient cryomodules needed for the 12 GeV upgrade. Cryogenic maintenance and installation work had to be coordinated with other activities in the linacs and compete for manpower from other department installation activities. With less than a quarter of the gas storage capacity available to handle the boil-off from the more than 40 cryomodules, 35,000 Nm{sup 3} of helium was re-liquefied and shipped to a vendor via a liquid tanker trailer. Nearly 200 u-tubes had to be removed and stored while seals were replaced on related equipment such as vacuum pump outs, bayonet isolation and process valves.

42 ENGINEERING↗

The Hall D solenoid helium refrigeration system at JLab

Hall D, the new Jefferson Lab experimental facility built for the 12GeV upgrade, features a LASS 1.85 m bore solenoid magnet supported by a 4.5 K helium refrigerator system. This system consists of a CTI 2800 4.5 K refrigerator cold box, three 150 hp screw compressors, helium gas management and storage, and liquid helium and nitrogen storage for stand-alone operation. The magnet interfaces with the cryo refrigeration system through an LN2-shielded distribution box and transfer line system, both designed and fabricated by JLab. The distribution box uses a thermo siphon design to respectively cool four magnet coils and shields with liquid helium and nitrogen. We describe the salient design features of the cryo system and discuss our recent commissioning experience.

42 ENGINEERING↗

Commissioning of helium refrigeration system at JLab for 12 GeV upgrade

The new 4.5 K refrigerator system added to the Jefferson Lab (JLab) Central Helium Liquefier (CHL) for the 12 GeV upgrade will double its previous capacity. It includes a 4.5 K cold box system and compressor system with associated oil removal and gas management systems. At its maximum capacity condition, this new system supports an additional 238 g/s 30 K 1.16 bar cold compressor return flow, a 15 g/s 4.5 K liquefaction load and a 12.6 kW 35–55 K shield load. Five more design conditions, ranging from liquefaction to refrigeration and a stand-by/reduced load state, were specified for the sizing and selection of its components. The cold box system is comprised of a 300–60 K vertical cold box that incorporates a liquid nitrogen pre-cooler and a 60–4.5 K horizontal cold box housing seven turbines that are configured in four expansion stages including one Joule-Thompson expander. The helium compression system has five compressors to support three pressure levels in the cold box. This paper will briefly review the salient 4.5 K system design features and discuss the recent commissioning results.

42 ENGINEERING↗

Commissioning of helium compression system for the 12 GeV refrigerator

The compressor system used for the Jefferson Lab (JLab) 12 GeV upgrade, also known as the CHL-2 compressor system, incorporates many design changes to the typical compressor skid design to improve the efficiency, reliability and maintainability from previous systems. These include a considerably smaller bulk oil separator design that does not use coalescing elements/media, automated control of cooling oil injection based on the helium discharge temperature, a helium after-cooler design that is designed for and promotes coalescing of residual oil and a variable speed bearing oil pump to reduce oil bypass. The CHL-2 helium compression system has five compressors configured with four pressure levels that supports the three pressure levels in the cold box. This paper will briefly review several of these improvements and discuss some of the recent commissioning results.

42 ENGINEERING↗

Status of cryogenic system for spallation neutron source's superconducting radiofrequency test facility at Oak Ridge National Lab

The Spallation Neutron Source (SNS) at Oak Ridge National Lab (ORNL) is building an independent cryogenic system for its Superconducting Radiofrequency Test Facility (SRFTF). The system will provide refrigeration for the SNS cryomodule test and cavity test at both 2K (using vacuum pumped helium) and 4.5K for the maintenance purposes and the Power Upgrade Project of SNS. It will also provide the part of the cooling power needed to backup the existing CHL to keep the Linac at 4.5K during CHL future maintenance periods. The system will be constructed in multiple phases. The first phase is to construct an independent 4.5K helium refrigeration system with a helium Dewar and distribution box as the load interface. It is scheduled to be commissioned in 2013. Here we report on the design concept for the system and the status of the first phase of this project.

Xu, Ting↗

Status of Cryogenic System for Spallation Neutron Source's Superconducting Radiofrequency Test Facility at Oak Ridge National Lab

Spallation Neutron Source (SNS) at Oak Ridge National Lab (ORNL) is building an independent cryogenic system for its Superconducting Radiofrequency Test Facility (SRFTF). The scope of the system is to support the SNS cryomodule test and cavity test at 2-K (using vacuum pump) and 4.5K for the maintenance purpose and Power Upgrade Project of SNS, and to provide the part of the cooling power needed to backup the current CHL to keep Linac at 4.5-K during CHL maintenance period in the future. The system is constructed in multiple phases. The first phase is to construct an independent 4K helium refrigeration system with helium Dewar and distribution box as load interface. It is schedule to be commissioned in 2013. Here we report the concept design of the system and the status of the first phase of this project.

43 PARTICLE ACCELERATORS↗

OPTIMAL DESIGN AND OPERATION OF HELIUM REFRIGERATION SYSTEMS

Helium refrigerators are of keen interest to present and future particle physics programs utilizing superconducting magnet or radio frequency (RF) technology. They typically utilize helium refrigeration at and below 4.5-Kelvin (K) temperatures and are very energy intensive. After an overview of the quality of energy, the Carnot step (as defined by the author) and cycle design theory, the concept of overall process optimization is presented. In particular the question of 'what is an optimum system' will be discussed. In this regard, the Ganni cycle and floating pressure process will be examined with respect to a more traditional approach as a solution to obtain an optimum system for new designs and existing systems.

Ganni, Venkatarao↗

Refrigeration Recovery for Experiment Hall High Target Loads

The Qweak experiment at Jefferson Lab (JLab) is a 3000 W hydrogen target scheduled for the summer of 2010 and running for two years until the planned shut-down for 12GeV. The End Station Refrigerator (ESR) supports the three experiment halls, two of which may normally have a hydrogen target. The refrigerator for the ESR is a CTI/Helix 1500 W 4.5-K refrigerator nominally capable of supporting a 1250 W target load at 12 bar and 15-K (plus 1100 W of 4.5-K refrigeration). As such, this refrigerator is not capable of supporting the Qweak experiment target load in its present condition. Additionally, since the installation of an ambient air vaporizer for a single use, two week run duration of a high target load in the summer of 2003 there has been a consistent usage of the Central Helium Liquefier’s (CHL’s) 3 bar 4.5-K helium, supplied via an existing transfer-line to the ESR, for other high target loads. By the fall of 2004, it was apparent that this continued use of CHL’s supercritical helium was routinely being sought by the hall experimenters. As such, a method of refrigeration recovery was proposed to reduce the support required of CHL for these high target loads, including the anticipated Qweak experiment, while utilizing the recovered CHL refrigeration from the target to increase ESR’s 12 bar 15-K capacity.

08 HYDROGEN↗