Mitigating the Effect of Wind Gusts on Local Run-of-River Hydropower Plants Using Cooperative Control
This paper focuses on the challenges and solutions associated with the integration of wind farms in a hydro- dominated power system. Due to sudden increases in wind power, the system frequency can increase, causing excessive reduction in the run-of-river (ROR) system’s power. Considering their small pondage, this can result in damage to the physical structure due to water level violations which are also penalized by stakeholders. To prevent excessive ROR power deviations, ROR governor wear and tear, and to prevent tie-line deviations, a centralized, distributed, and hybrid scheme for coordinating the response from a cluster of ROR plants is examined. Both centralized and distributed control as well as their hybrids can reduce frequency peaks. However, the inclusion of decentralized cooperative controls leads to reduced governor actions from fast- acting plants while enhancing net response from the hydro unit cluster.